{"rowid": 15642, "country": "IDN", "country_long": "Indonesia", "name": "Amamapare Port power station", "gppd_idnr": "WRI1075798", "capacity_mw": 195.0, "latitude": -4.8278, "longitude": 136.8391, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 1998.0, "owner": "PT Puncakjaya Power", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1061.18, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15671, "country": "IDN", "country_long": "Indonesia", "name": "Kayu Merah - Ternate", "gppd_idnr": "WRI1000769", "capacity_mw": 21.084, "latitude": 0.8, "longitude": 127.4, "primary_fuel": "Oil", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - Maluku Regional Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1093482", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 38.05, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15653, "country": "IDN", "country_long": "Indonesia", "name": "Bitung - Menado", "gppd_idnr": "WRI1000746", "capacity_mw": 56.62, "latitude": 1.4451, "longitude": 125.1824, "primary_fuel": "Oil", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-Nth & Ctrl Sulawesi & Gorontalo Reg Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 102.2, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15679, "country": "IDN", "country_long": "Indonesia", "name": "Lahendong (Binary Cycle)", "gppd_idnr": "WRI1000777", "capacity_mw": 20.0, "latitude": 1.3346, "longitude": 124.8392, "primary_fuel": "Geothermal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "BPPT + Pertamina", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026087", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": null, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "NO-ESTIMATION"} {"rowid": 15680, "country": "IDN", "country_long": "Indonesia", "name": "Lahendong IV", "gppd_idnr": "WRI1000778", "capacity_mw": 80.0, "latitude": 1.2542, "longitude": 124.8225, "primary_fuel": "Geothermal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN + Pertamina Geothermal Energy", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1087858", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": null, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "NO-ESTIMATION"} {"rowid": 15644, "country": "IDN", "country_long": "Indonesia", "name": "Amurang power station", "gppd_idnr": "WRI1075799", "capacity_mw": 60.0, "latitude": 1.1825, "longitude": 124.4806, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2012.0, "owner": "PLN", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 326.51, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15812, "country": "IDN", "country_long": "Indonesia", "name": "Tenau Kupang", "gppd_idnr": "WRI1001033", "capacity_mw": 34.73, "latitude": -10.1667, "longitude": 123.5833, "primary_fuel": "Oil", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - East Nusa Tenggara Regional Unit/NTT", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026086", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 62.69, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15690, "country": "IDN", "country_long": "Indonesia", "name": "Minahasa - rental", "gppd_idnr": "WRI1000791", "capacity_mw": 35.0, "latitude": -1.4789, "longitude": 122.3858, "primary_fuel": "Oil", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - rental", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026100", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 63.17, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15804, "country": "IDN", "country_long": "Indonesia", "name": "Sulawesi Mining power station", "gppd_idnr": "WRI1075816", "capacity_mw": 280.0, "latitude": -2.8274, "longitude": 122.1553, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2016.0, "owner": "Sulawesi Mining Investment", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1523.75, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15683, "country": "IDN", "country_long": "Indonesia", "name": "Larona", "gppd_idnr": "WRI1000780", "capacity_mw": 165.0, "latitude": -2.8194, "longitude": 121.5783, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Inco", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1025949", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 487.39, "estimated_generation_gwh_2014": 423.65, "estimated_generation_gwh_2015": 445.46, "estimated_generation_gwh_2016": 510.49, "estimated_generation_gwh_2017": 460.54, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15647, "country": "IDN", "country_long": "Indonesia", "name": "Balambano", "gppd_idnr": "WRI1000739", "capacity_mw": 130.0, "latitude": -2.5213, "longitude": 121.357, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Inco", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1025948", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 338.09, "estimated_generation_gwh_2014": 252.07, "estimated_generation_gwh_2015": 306.96, "estimated_generation_gwh_2016": 344.3, "estimated_generation_gwh_2017": 354.37, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15742, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Bilibili", "gppd_idnr": "WRI1000918", "capacity_mw": 2.0, "latitude": -2.5213, "longitude": 121.357, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South&South East Sulawesi Regional Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 10.88, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15748, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Hendratna", "gppd_idnr": "WRI1000932", "capacity_mw": 5.0, "latitude": -2.5213, "longitude": 121.357, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Hendratna Plywood", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 27.2, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15752, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Kaur", "gppd_idnr": "WRI1000943", "capacity_mw": 200.0, "latitude": -2.5213, "longitude": 121.357, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1088.39, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15753, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Keramasan", "gppd_idnr": "WRI1000945", "capacity_mw": 25.0, "latitude": -2.5213, "longitude": 121.357, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South Sumatera Generation Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026111", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 136.04, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15754, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Kupang", "gppd_idnr": "WRI1000947", "capacity_mw": 30.0, "latitude": -2.5213, "longitude": 121.357, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Indonesia Power & electrindo Perkasa Utama", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026086", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 163.25, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15756, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Lati", "gppd_idnr": "WRI1000949", "capacity_mw": 14.0, "latitude": -2.5213, "longitude": 121.357, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - East Kalimantan Regional Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1088444", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 76.18, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15757, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Listrindo", "gppd_idnr": "WRI1000950", "capacity_mw": 2.5, "latitude": -2.5213, "longitude": 121.357, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Listrindo (IPP)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 13.6, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15762, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Pakerin", "gppd_idnr": "WRI1000965", "capacity_mw": 34.0, "latitude": -2.5213, "longitude": 121.357, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Pakerin (pulp industry)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 185.02, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15767, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Rancong", "gppd_idnr": "WRI1000974", "capacity_mw": 30.0, "latitude": -2.5213, "longitude": 121.357, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Jorindo Aceh Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 163.25, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15768, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Sanggau", "gppd_idnr": "WRI1000975", "capacity_mw": 14.0, "latitude": -2.5213, "longitude": 121.357, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1102412", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 76.18, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15772, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Suparma", "gppd_idnr": "WRI1000981", "capacity_mw": 27.0, "latitude": -2.5213, "longitude": 121.357, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Suparma (pulp industry)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 146.93, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15774, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Tabalong", "gppd_idnr": "WRI1000983", "capacity_mw": 60.0, "latitude": -2.5213, "longitude": 121.357, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Makmur Sejahtera Wisesa (owned by PT. Adaro)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 326.51, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15776, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Tanjung Alam Perkasa", "gppd_idnr": "WRI1000985", "capacity_mw": 7.5, "latitude": -2.5213, "longitude": 121.357, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Tanjung Alam Perkasa", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 40.81, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15673, "country": "IDN", "country_long": "Indonesia", "name": "Kendari - Rental", "gppd_idnr": "WRI1000771", "capacity_mw": 36.3, "latitude": 1.0591, "longitude": 120.798, "primary_fuel": "Oil", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - Rental", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026082", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 65.52, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15735, "country": "IDN", "country_long": "Indonesia", "name": "PLTU - Palu - Mpanau - Tawaeli", "gppd_idnr": "WRI1000906", "capacity_mw": 30.0, "latitude": -0.8917, "longitude": 119.8707, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Pusaka Jaya Palu Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 163.25, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15801, "country": "IDN", "country_long": "Indonesia", "name": "Silae", "gppd_idnr": "WRI1001015", "capacity_mw": 43.7, "latitude": -0.8917, "longitude": 119.8707, "primary_fuel": "Oil", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-Nth & Ctrl Sulawesi & Gorontalo Reg Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026112", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 78.88, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15770, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Sulawesi Selatan - Barru/FTP1", "gppd_idnr": "WRI1000979", "capacity_mw": 100.0, "latitude": -4.2931, "longitude": 119.6326, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South&South East Sulawesi Regional Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 544.19, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15805, "country": "IDN", "country_long": "Indonesia", "name": "Suppa - Pare pare", "gppd_idnr": "WRI1001020", "capacity_mw": 60.0, "latitude": -4.0135, "longitude": 119.6255, "primary_fuel": "Oil", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Makasar Power (Alsons Power Holdings Corp + Toyota Tsusho Corp/Tomen + Singapore Power)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026118", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 108.3, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15784, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Tonasa II (Boiler Turbine Generator)", "gppd_idnr": "WRI1000999", "capacity_mw": 70.0, "latitude": -4.7846, "longitude": 119.6163, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Semen Gresik Tbk/PT. Semen Indonesia", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 380.93, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15646, "country": "IDN", "country_long": "Indonesia", "name": "Bakaru", "gppd_idnr": "WRI1000738", "capacity_mw": 126.0, "latitude": -3.1141, "longitude": 119.6042, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South&South East Sulawesi Regional Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026035", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 423.6, "estimated_generation_gwh_2014": 334.58, "estimated_generation_gwh_2015": 350.67, "estimated_generation_gwh_2016": 415.34, "estimated_generation_gwh_2017": 424.69, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15652, "country": "IDN", "country_long": "Indonesia", "name": "Bili bili", "gppd_idnr": "WRI1000745", "capacity_mw": 20.1, "latitude": -5.2779, "longitude": 119.5817, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1092163", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 60.04, "estimated_generation_gwh_2014": 44.78, "estimated_generation_gwh_2015": 55.22, "estimated_generation_gwh_2016": 61.21, "estimated_generation_gwh_2017": 62.74, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15736, "country": "IDN", "country_long": "Indonesia", "name": "PLTU -Jeneponto I & II", "gppd_idnr": "WRI1000907", "capacity_mw": 250.0, "latitude": -5.6184, "longitude": 119.5506, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT Bosowa Energy", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1360.49, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15712, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Sengkang/Wajo", "gppd_idnr": "WRI1000849", "capacity_mw": 180.0, "latitude": -5.14, "longitude": 119.4221, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Energy Sengkang", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1025923", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 750.01, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15715, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Tello", "gppd_idnr": "WRI1000859", "capacity_mw": 123.0, "latitude": -5.14, "longitude": 119.4221, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South&South East Sulawesi Regional Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026174", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 512.5, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15730, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Sengkang/Wajo", "gppd_idnr": "WRI1000886", "capacity_mw": 135.0, "latitude": -5.14, "longitude": 119.4221, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Energy Sengkang", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1025923", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 562.5, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15783, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Tello", "gppd_idnr": "WRI1000997", "capacity_mw": 25.0, "latitude": -5.14, "longitude": 119.4221, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South&South East Sulawesi Regional Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 136.04, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15811, "country": "IDN", "country_long": "Indonesia", "name": "Tello", "gppd_idnr": "WRI1001031", "capacity_mw": 50.092, "latitude": -5.14, "longitude": 119.4221, "primary_fuel": "Oil", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South&South East Sulawesi Regional Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026174", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 90.42, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15733, "country": "IDN", "country_long": "Indonesia", "name": "PLTMG Pulau Bunyu", "gppd_idnr": "WRI1000898", "capacity_mw": 2.0, "latitude": 3.5, "longitude": 117.8333, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 8.33, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15714, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Tarakan", "gppd_idnr": "WRI1000858", "capacity_mw": 23.0, "latitude": 3.3, "longitude": 117.6333, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Cahaya Sakti", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1064213", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 95.83, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15717, "country": "IDN", "country_long": "Indonesia", "name": "PLTGB Tanjung Batu", "gppd_idnr": "WRI1000868", "capacity_mw": 2.0, "latitude": -0.5, "longitude": 117.15, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN \u2013 sewa", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1050072", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 8.33, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15746, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Embalut - Tanjung Batu", "gppd_idnr": "WRI1000925", "capacity_mw": 50.0, "latitude": -0.5, "longitude": 117.15, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Cahaya Fajar Kaltim", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1058260", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 272.09, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15668, "country": "IDN", "country_long": "Indonesia", "name": "Kaltim Teluk Balikpapan power station", "gppd_idnr": "WRI1075806", "capacity_mw": 220.0, "latitude": -1.1704, "longitude": 116.7887, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2015.0, "owner": "PLN", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1197.23, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15649, "country": "IDN", "country_long": "Indonesia", "name": "Batu Hijau power station", "gppd_idnr": "WRI1075801", "capacity_mw": 124.0, "latitude": -8.9012, "longitude": 116.7382, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 1999.0, "owner": "Pt Newmont Nusa Tenggara", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 674.8, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15643, "country": "IDN", "country_long": "Indonesia", "name": "Ampenan", "gppd_idnr": "WRI1000736", "capacity_mw": 56.284, "latitude": -8.5667, "longitude": 116.0667, "primary_fuel": "Oil", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - West Nusa Tenggara Regional Unit/NTB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026032", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 101.59, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15710, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Pesanggaran", "gppd_idnr": "WRI1000845", "capacity_mw": 122.0, "latitude": -8.7157, "longitude": 115.214, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026037", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 508.34, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15790, "country": "IDN", "country_long": "Indonesia", "name": "Pesanggaran", "gppd_idnr": "WRI1000803", "capacity_mw": 75.78, "latitude": -8.7157, "longitude": 115.214, "primary_fuel": "Oil", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "INDONESIA POWER UNIT", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026037", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 136.79, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15791, "country": "IDN", "country_long": "Indonesia", "name": "Pesanggaran BOO", "gppd_idnr": "WRI1000804", "capacity_mw": 75.0, "latitude": -8.7157, "longitude": 115.214, "primary_fuel": "Oil", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "Anggreko International - rental", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026037", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 135.38, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15792, "country": "IDN", "country_long": "Indonesia", "name": "Pesanggaran BOT", "gppd_idnr": "WRI1000805", "capacity_mw": 51.0, "latitude": -8.7157, "longitude": 115.214, "primary_fuel": "Oil", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "Anggreko International - rental", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026037", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 92.06, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15737, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Asam-asam 1 & 2", "gppd_idnr": "WRI1000910", "capacity_mw": 260.0, "latitude": -3.9253, "longitude": 115.1043, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - South Kalimantan Regional Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1414.91, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15709, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Pemaron", "gppd_idnr": "WRI1000844", "capacity_mw": 97.0, "latitude": -8.1189, "longitude": 115.0887, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1054581", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 404.17, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15788, "country": "IDN", "country_long": "Indonesia", "name": "Pemaron BOO", "gppd_idnr": "WRI1000802", "capacity_mw": 45.0, "latitude": -8.1189, "longitude": 115.0887, "primary_fuel": "Oil", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Cogindo DayaBersama - rental", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1054581", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 81.23, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15795, "country": "IDN", "country_long": "Indonesia", "name": "Riam Kanan/pangeran Muhamad Nur", "gppd_idnr": "WRI1001004", "capacity_mw": 30.0, "latitude": -3.5156, "longitude": 115.0074, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 102.63, "estimated_generation_gwh_2014": 81.56, "estimated_generation_gwh_2015": 87.65, "estimated_generation_gwh_2016": 97.75, "estimated_generation_gwh_2017": 102.52, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15654, "country": "IDN", "country_long": "Indonesia", "name": "Celukan Bawang power station", "gppd_idnr": "WRI1075802", "capacity_mw": 381.0, "latitude": -8.1963, "longitude": 114.8516, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2015.0, "owner": "PT General Energy Bali", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 2073.39, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15701, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Gilimanuk", "gppd_idnr": "WRI1000825", "capacity_mw": 133.0, "latitude": -8.1716, "longitude": 114.4344, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1050217", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 554.17, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15667, "country": "IDN", "country_long": "Indonesia", "name": "Kalteng-1 Pulang Pisau power station", "gppd_idnr": "WRI1075805", "capacity_mw": 120.0, "latitude": -2.8226, "longitude": 114.2088, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2015.0, "owner": "PT PLN Persero", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 653.03, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15761, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Paiton I Unit 7 & 8", "gppd_idnr": "WRI1000941", "capacity_mw": 5355.0, "latitude": -7.7184, "longitude": 113.5827, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Paiton Energy Corp", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1026016", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 29141.78, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15702, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Grati", "gppd_idnr": "WRI1000829", "capacity_mw": 302.0, "latitude": -7.6517, "longitude": 113.0244, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026069", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1258.35, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15721, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Grati", "gppd_idnr": "WRI1000875", "capacity_mw": 461.0, "latitude": -7.6517, "longitude": 113.0244, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026069", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1920.86, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15765, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Perak", "gppd_idnr": "WRI1000970", "capacity_mw": 100.0, "latitude": -7.2492, "longitude": 112.7508, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 544.19, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15703, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Gresik", "gppd_idnr": "WRI1000830", "capacity_mw": 80.0, "latitude": -7.1633, "longitude": 112.6615, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN \u2013 Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026070", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 333.33, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15722, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Gresik", "gppd_idnr": "WRI1000876", "capacity_mw": 1579.0, "latitude": -7.1633, "longitude": 112.6615, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN \u2013 Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026070", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 6579.26, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15747, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Gresik", "gppd_idnr": "WRI1000929", "capacity_mw": 600.0, "latitude": -7.1633, "longitude": 112.6615, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1026070", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3265.18, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15798, "country": "IDN", "country_long": "Indonesia", "name": "Sengguruh - Brantas", "gppd_idnr": "WRI1001010", "capacity_mw": 29.0, "latitude": -8.1764, "longitude": 112.551, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026143", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 99.96, "estimated_generation_gwh_2014": 68.14, "estimated_generation_gwh_2015": 80.5, "estimated_generation_gwh_2016": 104.17, "estimated_generation_gwh_2017": 99.98, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15806, "country": "IDN", "country_long": "Indonesia", "name": "Sutami / Karangkates - Brantas", "gppd_idnr": "WRI1001021", "capacity_mw": 105.0, "latitude": -8.1606, "longitude": 112.4443, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1026154", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 371.79, "estimated_generation_gwh_2014": 266.78, "estimated_generation_gwh_2015": 301.33, "estimated_generation_gwh_2016": 387.04, "estimated_generation_gwh_2017": 371.86, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15688, "country": "IDN", "country_long": "Indonesia", "name": "Mendalan - Brantas", "gppd_idnr": "WRI1000788", "capacity_mw": 23.0, "latitude": -7.854, "longitude": 112.3316, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026099", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 89.18, "estimated_generation_gwh_2014": 64.91, "estimated_generation_gwh_2015": 69.64, "estimated_generation_gwh_2016": 87.87, "estimated_generation_gwh_2017": 83.64, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15818, "country": "IDN", "country_long": "Indonesia", "name": "Wlingi - Brantas", "gppd_idnr": "WRI1001045", "capacity_mw": 54.0, "latitude": -8.0776, "longitude": 112.3311, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026178", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 158.18, "estimated_generation_gwh_2014": 138.62, "estimated_generation_gwh_2015": 149.71, "estimated_generation_gwh_2016": 161.31, "estimated_generation_gwh_2017": 165.44, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15819, "country": "IDN", "country_long": "Indonesia", "name": "Wonorejo - Pamekasan", "gppd_idnr": "WRI1001046", "capacity_mw": 6.3, "latitude": -8.1136, "longitude": 112.2869, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1055424", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 24.89, "estimated_generation_gwh_2014": 17.37, "estimated_generation_gwh_2015": 21.45, "estimated_generation_gwh_2016": 26.43, "estimated_generation_gwh_2017": 24.77, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15685, "country": "IDN", "country_long": "Indonesia", "name": "Lodoyo - Brantas", "gppd_idnr": "WRI1000783", "capacity_mw": 4.5, "latitude": -8.1613, "longitude": 112.2173, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026092", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 17.16, "estimated_generation_gwh_2014": 12.97, "estimated_generation_gwh_2015": 15.44, "estimated_generation_gwh_2016": 18.26, "estimated_generation_gwh_2017": 17.08, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15809, "country": "IDN", "country_long": "Indonesia", "name": "Tanjung Awar-Awar power station", "gppd_idnr": "WRI1075817", "capacity_mw": 700.0, "latitude": -6.8105, "longitude": 111.9955, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2012.0, "owner": "PT PLN Persero", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3809.38, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15814, "country": "IDN", "country_long": "Indonesia", "name": "Tulungagung - Brantas", "gppd_idnr": "WRI1001038", "capacity_mw": 36.0, "latitude": -8.0657, "longitude": 111.9025, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026172", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 125.46, "estimated_generation_gwh_2014": 98.39, "estimated_generation_gwh_2015": 106.37, "estimated_generation_gwh_2016": 124.04, "estimated_generation_gwh_2017": 132.82, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15662, "country": "IDN", "country_long": "Indonesia", "name": "Giringan - Pamekasan", "gppd_idnr": "WRI1000755", "capacity_mw": 3.2, "latitude": -7.7201, "longitude": 111.6715, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026067", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 6.65, "estimated_generation_gwh_2014": 6.55, "estimated_generation_gwh_2015": 7.17, "estimated_generation_gwh_2016": 7.1, "estimated_generation_gwh_2017": 7.08, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15692, "country": "IDN", "country_long": "Indonesia", "name": "Ngebel - Pamekasan", "gppd_idnr": "WRI1000793", "capacity_mw": 2.2, "latitude": -7.7891, "longitude": 111.6167, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026106", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 7.89, "estimated_generation_gwh_2014": 7.12, "estimated_generation_gwh_2015": 8.26, "estimated_generation_gwh_2016": 8.38, "estimated_generation_gwh_2017": 7.91, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15763, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Pangkalan Bun", "gppd_idnr": "WRI1000966", "capacity_mw": 14.0, "latitude": -2.6833, "longitude": 111.6167, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Energi Listrik Indonesia (subsidiary of PT. Eksploitasi Energi Indonesia)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026115", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 76.18, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15751, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Jawa Tengah 1 - Rembang", "gppd_idnr": "WRI1000940", "capacity_mw": 630.0, "latitude": -6.636, "longitude": 111.4749, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN(EPC : Zeland-Priamanaya-Tronoh)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1065762", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3428.44, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15785, "country": "IDN", "country_long": "Indonesia", "name": "Pacitan power station", "gppd_idnr": "WRI1075812", "capacity_mw": 630.0, "latitude": -8.2578, "longitude": 111.3736, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2011.0, "owner": "PT PLN Persero", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3428.44, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15663, "country": "IDN", "country_long": "Indonesia", "name": "Golang - Pamekasan", "gppd_idnr": "WRI1000756", "capacity_mw": 2.7, "latitude": -8.1408, "longitude": 111.1317, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026068", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 9.34, "estimated_generation_gwh_2014": 6.6, "estimated_generation_gwh_2015": 8.09, "estimated_generation_gwh_2016": 9.68, "estimated_generation_gwh_2017": 9.64, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15676, "country": "IDN", "country_long": "Indonesia", "name": "Klambu/Mrica", "gppd_idnr": "WRI1000773", "capacity_mw": 1.117, "latitude": -7.0069, "longitude": 110.7964, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 3.78, "estimated_generation_gwh_2014": 3.34, "estimated_generation_gwh_2015": 3.9, "estimated_generation_gwh_2016": 3.88, "estimated_generation_gwh_2017": 3.58, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15778, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Tanjung Jati B", "gppd_idnr": "WRI1000990", "capacity_mw": 1320.0, "latitude": -6.446, "longitude": 110.7423, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Central Java Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1052927", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 7183.4, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15779, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Tanjung Jati B - expansion", "gppd_idnr": "WRI1000991", "capacity_mw": 1324.0, "latitude": -6.446, "longitude": 110.7423, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Central Java Power (EPC : Korea Midland Power Co)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1052927", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 7205.17, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15731, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Tambak Lorok", "gppd_idnr": "WRI1000887", "capacity_mw": 1034.0, "latitude": -6.9505, "longitude": 110.434, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN \u2013 Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026156", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 4308.39, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15775, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Tambak Lorok", "gppd_idnr": "WRI1000984", "capacity_mw": 300.0, "latitude": -6.9507, "longitude": 110.4304, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026156", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1632.59, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15813, "country": "IDN", "country_long": "Indonesia", "name": "Timo / Mrica", "gppd_idnr": "WRI1001035", "capacity_mw": 12.0, "latitude": -6.9485, "longitude": 110.4069, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026168", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 36.17, "estimated_generation_gwh_2014": 27.97, "estimated_generation_gwh_2015": 34.2, "estimated_generation_gwh_2016": 37.89, "estimated_generation_gwh_2017": 37.79, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15799, "country": "IDN", "country_long": "Indonesia", "name": "Sidorejo/Mrica", "gppd_idnr": "WRI1001013", "capacity_mw": 1.4, "latitude": -7.4764, "longitude": 110.2622, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1050222", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 3.78, "estimated_generation_gwh_2014": 3.83, "estimated_generation_gwh_2015": 4.47, "estimated_generation_gwh_2016": 3.98, "estimated_generation_gwh_2017": 4.23, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15674, "country": "IDN", "country_long": "Indonesia", "name": "Ketapang Smelter power station", "gppd_idnr": "WRI1075808", "capacity_mw": 80.0, "latitude": -2.3662, "longitude": 110.1573, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2016.0, "owner": "PT Well Harvest Winning Alumina Refinery", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 435.35, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15661, "country": "IDN", "country_long": "Indonesia", "name": "Dieng", "gppd_idnr": "WRI1000752", "capacity_mw": 60.0, "latitude": -7.2061, "longitude": 109.9119, "primary_fuel": "Geothermal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Geo Dipa Energy", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1018473", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": null, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "NO-ESTIMATION"} {"rowid": 15786, "country": "IDN", "country_long": "Indonesia", "name": "Pejengkolan/Mrica", "gppd_idnr": "WRI1000801", "capacity_mw": 1.4, "latitude": -7.5694, "longitude": 109.8006, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026121", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 2.83, "estimated_generation_gwh_2014": 2.23, "estimated_generation_gwh_2015": 2.96, "estimated_generation_gwh_2016": 3.02, "estimated_generation_gwh_2017": 3.01, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15694, "country": "IDN", "country_long": "Indonesia", "name": "PB. Sudirman/Mrica", "gppd_idnr": "WRI1000800", "capacity_mw": 180.9, "latitude": -7.3927, "longitude": 109.6054, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026120", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 574.49, "estimated_generation_gwh_2014": 398.71, "estimated_generation_gwh_2015": 459.9, "estimated_generation_gwh_2016": 565.77, "estimated_generation_gwh_2017": 567.57, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15695, "country": "IDN", "country_long": "Indonesia", "name": "PLTG (ex PLTD Sunyaragi)", "gppd_idnr": "WRI1000809", "capacity_mw": 18.0, "latitude": -7.4064, "longitude": 109.5842, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South Sumatera Generation Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026057", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 75.0, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15700, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Duri ex PLTG Sunyaragi Cent Java", "gppd_idnr": "WRI1000824", "capacity_mw": 20.0, "latitude": -7.4064, "longitude": 109.5842, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026057", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 83.33, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15713, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Sunyaragi 1 2 3 4", "gppd_idnr": "WRI1000855", "capacity_mw": 80.0, "latitude": -7.4064, "longitude": 109.5842, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN \u2013 Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026057", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 333.33, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15797, "country": "IDN", "country_long": "Indonesia", "name": "Sempor/Mrica", "gppd_idnr": "WRI1001009", "capacity_mw": 1.0, "latitude": -7.4733, "longitude": 109.3331, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1050218", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 3.35, "estimated_generation_gwh_2014": 3.45, "estimated_generation_gwh_2015": 3.96, "estimated_generation_gwh_2016": 3.31, "estimated_generation_gwh_2017": 3.53, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15675, "country": "IDN", "country_long": "Indonesia", "name": "Ketenger / mrica", "gppd_idnr": "WRI1000772", "capacity_mw": 8.04, "latitude": -7.5097, "longitude": 109.2778, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1050220", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 33.59, "estimated_generation_gwh_2014": 25.5, "estimated_generation_gwh_2015": 29.83, "estimated_generation_gwh_2016": 35.02, "estimated_generation_gwh_2017": 32.34, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15657, "country": "IDN", "country_long": "Indonesia", "name": "Cilacap Sumber power station", "gppd_idnr": "WRI1075804", "capacity_mw": 1260.0, "latitude": -7.6832, "longitude": 109.0964, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2011.0, "owner": "Sumber Segara Primadaya", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 6856.89, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15744, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Cilacap 1 & 2", "gppd_idnr": "WRI1000920", "capacity_mw": 600.0, "latitude": -7.7513, "longitude": 109.0186, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Sumber Segara Primadaya", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1050225", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3265.18, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15699, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Cilacap", "gppd_idnr": "WRI1000822", "capacity_mw": 55.0, "latitude": -7.7264, "longitude": 109.0094, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN \u2013 Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 229.17, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15716, "country": "IDN", "country_long": "Indonesia", "name": "PLTGB Singkawang", "gppd_idnr": "WRI1000867", "capacity_mw": 9.0, "latitude": 0.9, "longitude": 109.0, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLT \u2013 rented from PT. Krista Inti Persada", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1041391", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 37.5, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15745, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Cirebon", "gppd_idnr": "WRI1000921", "capacity_mw": 660.0, "latitude": -6.7704, "longitude": 108.6151, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Cirebon Electric Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1066870", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3591.7, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15750, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Jawa Barat - Indramayu", "gppd_idnr": "WRI1000939", "capacity_mw": 990.0, "latitude": -6.2747, "longitude": 107.9704, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN + China National Electric Engineering Co. Ltd. (CNEEC)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1071378", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 5387.55, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15659, "country": "IDN", "country_long": "Indonesia", "name": "Darajat 1", "gppd_idnr": "WRI1000750", "capacity_mw": 55.0, "latitude": -7.2173, "longitude": 107.7394, "primary_fuel": "Geothermal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN \u2013 Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": null, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "NO-ESTIMATION"}