rowid,country,country_long,name,gppd_idnr,capacity_mw,latitude,longitude,primary_fuel,other_fuel1,other_fuel2,other_fuel3,commissioning_year,owner,source,url,geolocation_source,wepp_id,year_of_capacity_data,generation_gwh_2013,generation_gwh_2014,generation_gwh_2015,generation_gwh_2016,generation_gwh_2017,generation_gwh_2018,generation_gwh_2019,generation_data_source,estimated_generation_gwh_2013,estimated_generation_gwh_2014,estimated_generation_gwh_2015,estimated_generation_gwh_2016,estimated_generation_gwh_2017,estimated_generation_note_2013,estimated_generation_note_2014,estimated_generation_note_2015,estimated_generation_note_2016,estimated_generation_note_2017 20424,ESP,Spain,LES FORQUES,WRI1006622,30.0,41.4833,1.2333,Wind,,,,2008.0,PARQUES EOLICOS GESTINVER SL,Red Eléctrica de España,http://www.ree.es/en/statistical-data-of-spanish-electrical-system/annual-report/preliminary-report-spanish-electricity-system-2015,CARMA,1067284,,,,,,,,,,77.31,74.99,72.75,71.51,76.23,WIND-V1,WIND-V1,WIND-V1,WIND-V1,WIND-V1 20519,ESP,Spain,P. E. AMPLIACION SERRA DA LOBA (PENA REVOLTA),WRI1006749,10.0,43.3333,-8.0167,Wind,,,,2008.0,PARQUES EOLICOS GESTINVER SL,Red Eléctrica de España,http://www.ree.es/en/statistical-data-of-spanish-electrical-system/annual-report/preliminary-report-spanish-electricity-system-2015,CARMA,1078157,,,,,,,,,,26.45,24.67,23.13,19.4,20.96,WIND-V1,WIND-V1,WIND-V1,WIND-V1,WIND-V1 20631,ESP,Spain,P.E. FARRAPA I,WRI1007042,20.0,43.3667,-7.4833,Wind,,,,2007.0,PARQUES EOLICOS GESTINVER SL,Red Eléctrica de España,http://www.ree.es/en/statistical-data-of-spanish-electrical-system/annual-report/preliminary-report-spanish-electricity-system-2015,CARMA,1078158,,,,,,,,,,44.24,48.72,44.73,52.41,51.38,WIND-V1,WIND-V1,WIND-V1,WIND-V1,WIND-V1