{"rowid": 15642, "country": "IDN", "country_long": "Indonesia", "name": "Amamapare Port power station", "gppd_idnr": "WRI1075798", "capacity_mw": 195.0, "latitude": -4.8278, "longitude": 136.8391, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 1998.0, "owner": "PT Puncakjaya Power", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1061.18, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15643, "country": "IDN", "country_long": "Indonesia", "name": "Ampenan", "gppd_idnr": "WRI1000736", "capacity_mw": 56.284, "latitude": -8.5667, "longitude": 116.0667, "primary_fuel": "Oil", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - West Nusa Tenggara Regional Unit/NTB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026032", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 101.59, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15644, "country": "IDN", "country_long": "Indonesia", "name": "Amurang power station", "gppd_idnr": "WRI1075799", "capacity_mw": 60.0, "latitude": 1.1825, "longitude": 124.4806, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2012.0, "owner": "PLN", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 326.51, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15645, "country": "IDN", "country_long": "Indonesia", "name": "Asahan I", "gppd_idnr": "WRI1000737", "capacity_mw": 180.0, "latitude": 2.5113, "longitude": 99.259, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT Bajradaya Sentranusa (China Huadian Corporation 70% + PJB 26.5%+Nusa Konstruksi Engineering 3.5%)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1076093", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 614.23, "estimated_generation_gwh_2014": 443.82, "estimated_generation_gwh_2015": 523.3, "estimated_generation_gwh_2016": 555.94, "estimated_generation_gwh_2017": 592.43, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15646, "country": "IDN", "country_long": "Indonesia", "name": "Bakaru", "gppd_idnr": "WRI1000738", "capacity_mw": 126.0, "latitude": -3.1141, "longitude": 119.6042, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South&South East Sulawesi Regional Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026035", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 423.6, "estimated_generation_gwh_2014": 334.58, "estimated_generation_gwh_2015": 350.67, "estimated_generation_gwh_2016": 415.34, "estimated_generation_gwh_2017": 424.69, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15647, "country": "IDN", "country_long": "Indonesia", "name": "Balambano", "gppd_idnr": "WRI1000739", "capacity_mw": 130.0, "latitude": -2.5213, "longitude": 121.357, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Inco", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1025948", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 338.09, "estimated_generation_gwh_2014": 252.07, "estimated_generation_gwh_2015": 306.96, "estimated_generation_gwh_2016": 344.3, "estimated_generation_gwh_2017": 354.37, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15648, "country": "IDN", "country_long": "Indonesia", "name": "Banten Serang power station", "gppd_idnr": "WRI1075800", "capacity_mw": 660.0, "latitude": -5.883, "longitude": 106.0459, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2017.0, "owner": "PT Lestari Baten Energi (LBE)", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3591.7, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15649, "country": "IDN", "country_long": "Indonesia", "name": "Batu Hijau power station", "gppd_idnr": "WRI1075801", "capacity_mw": 124.0, "latitude": -8.9012, "longitude": 116.7382, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 1999.0, "owner": "Pt Newmont Nusa Tenggara", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 674.8, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15650, "country": "IDN", "country_long": "Indonesia", "name": "Bengkok+Dago/saguling", "gppd_idnr": "WRI1000743", "capacity_mw": 3.85, "latitude": -6.6247, "longitude": 107.5564, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 13.0, "estimated_generation_gwh_2014": 10.85, "estimated_generation_gwh_2015": 13.53, "estimated_generation_gwh_2016": 13.6, "estimated_generation_gwh_2017": 13.49, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15651, "country": "IDN", "country_long": "Indonesia", "name": "Besai - Way Kanan", "gppd_idnr": "WRI1000744", "capacity_mw": 92.8, "latitude": -4.9822, "longitude": 104.8051, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South Sumatera Generation Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1026048", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 268.15, "estimated_generation_gwh_2014": 244.77, "estimated_generation_gwh_2015": 253.6, "estimated_generation_gwh_2016": 273.52, "estimated_generation_gwh_2017": 280.63, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15652, "country": "IDN", "country_long": "Indonesia", "name": "Bili bili", "gppd_idnr": "WRI1000745", "capacity_mw": 20.1, "latitude": -5.2779, "longitude": 119.5817, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1092163", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 60.04, "estimated_generation_gwh_2014": 44.78, "estimated_generation_gwh_2015": 55.22, "estimated_generation_gwh_2016": 61.21, "estimated_generation_gwh_2017": 62.74, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15653, "country": "IDN", "country_long": "Indonesia", "name": "Bitung - Menado", "gppd_idnr": "WRI1000746", "capacity_mw": 56.62, "latitude": 1.4451, "longitude": 125.1824, "primary_fuel": "Oil", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-Nth & Ctrl Sulawesi & Gorontalo Reg Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 102.2, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15654, "country": "IDN", "country_long": "Indonesia", "name": "Celukan Bawang power station", "gppd_idnr": "WRI1075802", "capacity_mw": 381.0, "latitude": -8.1963, "longitude": 114.8516, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2015.0, "owner": "PT General Energy Bali", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 2073.39, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15655, "country": "IDN", "country_long": "Indonesia", "name": "Cikalong/saguling", "gppd_idnr": "WRI1000747", "capacity_mw": 19.2, "latitude": -6.9039, "longitude": 107.6186, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026135", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 70.7, "estimated_generation_gwh_2014": 65.53, "estimated_generation_gwh_2015": 63.95, "estimated_generation_gwh_2016": 76.04, "estimated_generation_gwh_2017": 65.27, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15656, "country": "IDN", "country_long": "Indonesia", "name": "Cikarang Babelan power station", "gppd_idnr": "WRI1075803", "capacity_mw": 280.0, "latitude": -6.1161, "longitude": 107.052, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2017.0, "owner": "PT Cikarang Listrindo", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1523.75, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15657, "country": "IDN", "country_long": "Indonesia", "name": "Cilacap Sumber power station", "gppd_idnr": "WRI1075804", "capacity_mw": 1260.0, "latitude": -7.6832, "longitude": 109.0964, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2011.0, "owner": "Sumber Segara Primadaya", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 6856.89, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15658, "country": "IDN", "country_long": "Indonesia", "name": "CirataI & II", "gppd_idnr": "WRI1000748", "capacity_mw": 1008.0, "latitude": -6.7004, "longitude": 107.3671, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1026056", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 3426.09, "estimated_generation_gwh_2014": 2354.32, "estimated_generation_gwh_2015": 3099.69, "estimated_generation_gwh_2016": 3272.44, "estimated_generation_gwh_2017": 3205.36, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15659, "country": "IDN", "country_long": "Indonesia", "name": "Darajat 1", "gppd_idnr": "WRI1000750", "capacity_mw": 55.0, "latitude": -7.2173, "longitude": 107.7394, "primary_fuel": "Geothermal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN \u2013 Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": null, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "NO-ESTIMATION"} {"rowid": 15660, "country": "IDN", "country_long": "Indonesia", "name": "Darajat 2 3", "gppd_idnr": "WRI1000751", "capacity_mw": 215.0, "latitude": -7.2173, "longitude": 107.7394, "primary_fuel": "Geothermal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Chevron Geothermal Darajat Ltd", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": null, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "NO-ESTIMATION"} {"rowid": 15661, "country": "IDN", "country_long": "Indonesia", "name": "Dieng", "gppd_idnr": "WRI1000752", "capacity_mw": 60.0, "latitude": -7.2061, "longitude": 109.9119, "primary_fuel": "Geothermal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Geo Dipa Energy", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1018473", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": null, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "NO-ESTIMATION"} {"rowid": 15662, "country": "IDN", "country_long": "Indonesia", "name": "Giringan - Pamekasan", "gppd_idnr": "WRI1000755", "capacity_mw": 3.2, "latitude": -7.7201, "longitude": 111.6715, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026067", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 6.65, "estimated_generation_gwh_2014": 6.55, "estimated_generation_gwh_2015": 7.17, "estimated_generation_gwh_2016": 7.1, "estimated_generation_gwh_2017": 7.08, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15663, "country": "IDN", "country_long": "Indonesia", "name": "Golang - Pamekasan", "gppd_idnr": "WRI1000756", "capacity_mw": 2.7, "latitude": -8.1408, "longitude": 111.1317, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026068", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 9.34, "estimated_generation_gwh_2014": 6.6, "estimated_generation_gwh_2015": 8.09, "estimated_generation_gwh_2016": 9.68, "estimated_generation_gwh_2017": 9.64, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15664, "country": "IDN", "country_long": "Indonesia", "name": "Gunung Malang", "gppd_idnr": "WRI1000758", "capacity_mw": 25.536, "latitude": -6.7409, "longitude": 106.673, "primary_fuel": "Oil", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-East Kalimantan Regional Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 46.09, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15665, "country": "IDN", "country_long": "Indonesia", "name": "Gunung Salak", "gppd_idnr": "WRI1000759", "capacity_mw": 375.0, "latitude": -6.7416, "longitude": 106.648, "primary_fuel": "Geothermal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Chevron Geothermal Salak Ltd", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1026072", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": null, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "NO-ESTIMATION"} {"rowid": 15666, "country": "IDN", "country_long": "Indonesia", "name": "Jatiluhur", "gppd_idnr": "WRI1000762", "capacity_mw": 186.0, "latitude": -6.523, "longitude": 107.389, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "Perum Jasa Tirta II", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 670.77, "estimated_generation_gwh_2014": 452.3, "estimated_generation_gwh_2015": 524.85, "estimated_generation_gwh_2016": 671.81, "estimated_generation_gwh_2017": 664.17, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15667, "country": "IDN", "country_long": "Indonesia", "name": "Kalteng-1 Pulang Pisau power station", "gppd_idnr": "WRI1075805", "capacity_mw": 120.0, "latitude": -2.8226, "longitude": 114.2088, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2015.0, "owner": "PT PLN Persero", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 653.03, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15668, "country": "IDN", "country_long": "Indonesia", "name": "Kaltim Teluk Balikpapan power station", "gppd_idnr": "WRI1075806", "capacity_mw": 220.0, "latitude": -1.1704, "longitude": 116.7887, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2015.0, "owner": "PLN", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1197.23, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15669, "country": "IDN", "country_long": "Indonesia", "name": "Kamojang 1 2 3", "gppd_idnr": "WRI1000764", "capacity_mw": 140.0, "latitude": -6.4239, "longitude": 107.4553, "primary_fuel": "Geothermal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN \u2013 Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026079", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": null, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "NO-ESTIMATION"} {"rowid": 15670, "country": "IDN", "country_long": "Indonesia", "name": "Kamojang 4", "gppd_idnr": "WRI1000765", "capacity_mw": 60.0, "latitude": -6.4239, "longitude": 107.4553, "primary_fuel": "Geothermal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Pertamina Geothermal Energy", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026079", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": null, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "NO-ESTIMATION"} {"rowid": 15671, "country": "IDN", "country_long": "Indonesia", "name": "Kayu Merah - Ternate", "gppd_idnr": "WRI1000769", "capacity_mw": 21.084, "latitude": 0.8, "longitude": 127.4, "primary_fuel": "Oil", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - Maluku Regional Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1093482", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 38.05, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15672, "country": "IDN", "country_long": "Indonesia", "name": "Keban Agung power station", "gppd_idnr": "WRI1075807", "capacity_mw": 270.0, "latitude": -3.7515, "longitude": 103.6481, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2015.0, "owner": "PT Primanaya Energi", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1469.33, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15673, "country": "IDN", "country_long": "Indonesia", "name": "Kendari - Rental", "gppd_idnr": "WRI1000771", "capacity_mw": 36.3, "latitude": 1.0591, "longitude": 120.798, "primary_fuel": "Oil", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - Rental", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026082", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 65.52, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15674, "country": "IDN", "country_long": "Indonesia", "name": "Ketapang Smelter power station", "gppd_idnr": "WRI1075808", "capacity_mw": 80.0, "latitude": -2.3662, "longitude": 110.1573, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2016.0, "owner": "PT Well Harvest Winning Alumina Refinery", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 435.35, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15675, "country": "IDN", "country_long": "Indonesia", "name": "Ketenger / mrica", "gppd_idnr": "WRI1000772", "capacity_mw": 8.04, "latitude": -7.5097, "longitude": 109.2778, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1050220", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 33.59, "estimated_generation_gwh_2014": 25.5, "estimated_generation_gwh_2015": 29.83, "estimated_generation_gwh_2016": 35.02, "estimated_generation_gwh_2017": 32.34, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15676, "country": "IDN", "country_long": "Indonesia", "name": "Klambu/Mrica", "gppd_idnr": "WRI1000773", "capacity_mw": 1.117, "latitude": -7.0069, "longitude": 110.7964, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 3.78, "estimated_generation_gwh_2014": 3.34, "estimated_generation_gwh_2015": 3.9, "estimated_generation_gwh_2016": 3.88, "estimated_generation_gwh_2017": 3.58, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15677, "country": "IDN", "country_long": "Indonesia", "name": "Koto Panjang Kampar", "gppd_idnr": "WRI1000775", "capacity_mw": 114.0, "latitude": 0.2905, "longitude": 100.8814, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 419.08, "estimated_generation_gwh_2014": 310.21, "estimated_generation_gwh_2015": 359.57, "estimated_generation_gwh_2016": 397.38, "estimated_generation_gwh_2017": 420.15, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15678, "country": "IDN", "country_long": "Indonesia", "name": "Kracak/saguling", "gppd_idnr": "WRI1000776", "capacity_mw": 18.9, "latitude": -6.9039, "longitude": 107.6186, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026135", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 69.59, "estimated_generation_gwh_2014": 64.51, "estimated_generation_gwh_2015": 62.95, "estimated_generation_gwh_2016": 74.85, "estimated_generation_gwh_2017": 64.25, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15679, "country": "IDN", "country_long": "Indonesia", "name": "Lahendong (Binary Cycle)", "gppd_idnr": "WRI1000777", "capacity_mw": 20.0, "latitude": 1.3346, "longitude": 124.8392, "primary_fuel": "Geothermal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "BPPT + Pertamina", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026087", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": null, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "NO-ESTIMATION"} {"rowid": 15680, "country": "IDN", "country_long": "Indonesia", "name": "Lahendong IV", "gppd_idnr": "WRI1000778", "capacity_mw": 80.0, "latitude": 1.2542, "longitude": 124.8225, "primary_fuel": "Geothermal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN + Pertamina Geothermal Energy", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1087858", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": null, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "NO-ESTIMATION"} {"rowid": 15681, "country": "IDN", "country_long": "Indonesia", "name": "Lamajan/saguling", "gppd_idnr": "WRI1000779", "capacity_mw": 19.56, "latitude": -6.9039, "longitude": 107.6186, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026135", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 72.02, "estimated_generation_gwh_2014": 65.75, "estimated_generation_gwh_2015": 64.14, "estimated_generation_gwh_2016": 77.47, "estimated_generation_gwh_2017": 66.5, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15682, "country": "IDN", "country_long": "Indonesia", "name": "Lampung Sebalang power station", "gppd_idnr": "WRI1075809", "capacity_mw": 200.0, "latitude": -5.5859, "longitude": 105.3872, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2015.0, "owner": "PT PLN Persero", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1088.39, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15683, "country": "IDN", "country_long": "Indonesia", "name": "Larona", "gppd_idnr": "WRI1000780", "capacity_mw": 165.0, "latitude": -2.8194, "longitude": 121.5783, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Inco", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1025949", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 487.39, "estimated_generation_gwh_2014": 423.65, "estimated_generation_gwh_2015": 445.46, "estimated_generation_gwh_2016": 510.49, "estimated_generation_gwh_2017": 460.54, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15684, "country": "IDN", "country_long": "Indonesia", "name": "Lau Renun", "gppd_idnr": "WRI1000781", "capacity_mw": 82.0, "latitude": 3.0824, "longitude": 98.065, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - Pandan Sector", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026134", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 281.58, "estimated_generation_gwh_2014": 231.76, "estimated_generation_gwh_2015": 248.79, "estimated_generation_gwh_2016": 271.47, "estimated_generation_gwh_2017": 271.06, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15685, "country": "IDN", "country_long": "Indonesia", "name": "Lodoyo - Brantas", "gppd_idnr": "WRI1000783", "capacity_mw": 4.5, "latitude": -8.1613, "longitude": 112.2173, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026092", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 17.16, "estimated_generation_gwh_2014": 12.97, "estimated_generation_gwh_2015": 15.44, "estimated_generation_gwh_2016": 18.26, "estimated_generation_gwh_2017": 17.08, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15686, "country": "IDN", "country_long": "Indonesia", "name": "Maninjau III", "gppd_idnr": "WRI1000785", "capacity_mw": 123.0, "latitude": -0.2923, "longitude": 100.152, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South Sumatera Generation Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026095", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 319.89, "estimated_generation_gwh_2014": 238.5, "estimated_generation_gwh_2015": 290.43, "estimated_generation_gwh_2016": 325.76, "estimated_generation_gwh_2017": 335.29, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15687, "country": "IDN", "country_long": "Indonesia", "name": "Medan Steel Mill Power Plant", "gppd_idnr": "WRI1075810", "capacity_mw": 60.0, "latitude": 3.6676, "longitude": 98.6654, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2017.0, "owner": "PT Gahapi Nisco Steel", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 326.51, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15688, "country": "IDN", "country_long": "Indonesia", "name": "Mendalan - Brantas", "gppd_idnr": "WRI1000788", "capacity_mw": 23.0, "latitude": -7.854, "longitude": 112.3316, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026099", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 89.18, "estimated_generation_gwh_2014": 64.91, "estimated_generation_gwh_2015": 69.64, "estimated_generation_gwh_2016": 87.87, "estimated_generation_gwh_2017": 83.64, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15689, "country": "IDN", "country_long": "Indonesia", "name": "Merak power station", "gppd_idnr": "WRI1075811", "capacity_mw": 120.0, "latitude": -5.884, "longitude": 106.0642, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2014.0, "owner": "PT Merak Energi", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 653.03, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15690, "country": "IDN", "country_long": "Indonesia", "name": "Minahasa - rental", "gppd_idnr": "WRI1000791", "capacity_mw": 35.0, "latitude": -1.4789, "longitude": 122.3858, "primary_fuel": "Oil", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - rental", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026100", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 63.17, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15691, "country": "IDN", "country_long": "Indonesia", "name": "Musi", "gppd_idnr": "WRI1000792", "capacity_mw": 215.475, "latitude": -3.766, "longitude": 102.435, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South Sumatera Generation Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026105", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 561.45, "estimated_generation_gwh_2014": 422.24, "estimated_generation_gwh_2015": 513.22, "estimated_generation_gwh_2016": 571.75, "estimated_generation_gwh_2017": 588.43, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15692, "country": "IDN", "country_long": "Indonesia", "name": "Ngebel - Pamekasan", "gppd_idnr": "WRI1000793", "capacity_mw": 2.2, "latitude": -7.7891, "longitude": 111.6167, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026106", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 7.89, "estimated_generation_gwh_2014": 7.12, "estimated_generation_gwh_2015": 8.26, "estimated_generation_gwh_2016": 8.38, "estimated_generation_gwh_2017": 7.91, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15693, "country": "IDN", "country_long": "Indonesia", "name": "North Duri Cogeneration Plant", "gppd_idnr": "WRI1000794", "capacity_mw": 300.0, "latitude": 1.3722, "longitude": 101.226, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT Mandau Cipta Tenaga Nusanatara (subsidiary of Chevron)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1092378", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1250.01, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15694, "country": "IDN", "country_long": "Indonesia", "name": "PB. Sudirman/Mrica", "gppd_idnr": "WRI1000800", "capacity_mw": 180.9, "latitude": -7.3927, "longitude": 109.6054, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026120", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 574.49, "estimated_generation_gwh_2014": 398.71, "estimated_generation_gwh_2015": 459.9, "estimated_generation_gwh_2016": 565.77, "estimated_generation_gwh_2017": 567.57, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15695, "country": "IDN", "country_long": "Indonesia", "name": "PLTG (ex PLTD Sunyaragi)", "gppd_idnr": "WRI1000809", "capacity_mw": 18.0, "latitude": -7.4064, "longitude": 109.5842, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South Sumatera Generation Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026057", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 75.0, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15696, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Belawan", "gppd_idnr": "WRI1000817", "capacity_mw": 260.0, "latitude": 3.5833, "longitude": 98.6667, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN / KITSUMBAGUT", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026045", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1083.34, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15697, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Belawan TTF", "gppd_idnr": "WRI1000818", "capacity_mw": 105.0, "latitude": 3.5833, "longitude": 98.6667, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN / KITSUMBAGUT", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026045", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 437.5, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15698, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Cikarang Listrindo", "gppd_idnr": "WRI1000821", "capacity_mw": 150.0, "latitude": -6.1133, "longitude": 106.7788, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Cikarang Listrindo", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 625.0, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15699, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Cilacap", "gppd_idnr": "WRI1000822", "capacity_mw": 55.0, "latitude": -7.7264, "longitude": 109.0094, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN \u2013 Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 229.17, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15700, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Duri ex PLTG Sunyaragi Cent Java", "gppd_idnr": "WRI1000824", "capacity_mw": 20.0, "latitude": -7.4064, "longitude": 109.5842, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026057", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 83.33, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15701, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Gilimanuk", "gppd_idnr": "WRI1000825", "capacity_mw": 133.0, "latitude": -8.1716, "longitude": 114.4344, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1050217", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 554.17, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15702, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Grati", "gppd_idnr": "WRI1000829", "capacity_mw": 302.0, "latitude": -7.6517, "longitude": 113.0244, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026069", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1258.35, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15703, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Gresik", "gppd_idnr": "WRI1000830", "capacity_mw": 80.0, "latitude": -7.1633, "longitude": 112.6615, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN \u2013 Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026070", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 333.33, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15704, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Keramasan", "gppd_idnr": "WRI1000833", "capacity_mw": 145.0, "latitude": -2.9167, "longitude": 104.7458, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT Asta Keramasan Energy (AKE)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026111", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 604.17, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15705, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Keramasan #1 2 3 4", "gppd_idnr": "WRI1000834", "capacity_mw": 65.0, "latitude": -2.9167, "longitude": 104.7458, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South Sumatera Generation Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026111", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 270.83, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15706, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Krakatau Posco Energy", "gppd_idnr": "WRI1000835", "capacity_mw": 200.0, "latitude": -6.0048, "longitude": 105.9961, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Krakatau Posco Energy (JV : Korea Posco Energy (70%) + PT. Krakatau Daya Listrik (30%))", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 833.34, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15707, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Muara Tawar B-3", "gppd_idnr": "WRI1000836", "capacity_mw": 420.0, "latitude": -6.0867, "longitude": 106.9987, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026103", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1750.02, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15708, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Muara Tawar Block 4", "gppd_idnr": "WRI1000837", "capacity_mw": 420.0, "latitude": -6.0867, "longitude": 106.9987, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026103", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1750.02, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15709, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Pemaron", "gppd_idnr": "WRI1000844", "capacity_mw": 97.0, "latitude": -8.1189, "longitude": 115.0887, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1054581", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 404.17, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15710, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Pesanggaran", "gppd_idnr": "WRI1000845", "capacity_mw": 122.0, "latitude": -8.7157, "longitude": 115.214, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026037", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 508.34, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15711, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Priok", "gppd_idnr": "WRI1000846", "capacity_mw": 52.0, "latitude": -6.1071, "longitude": 106.8716, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 216.66, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15712, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Sengkang/Wajo", "gppd_idnr": "WRI1000849", "capacity_mw": 180.0, "latitude": -5.14, "longitude": 119.4221, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Energy Sengkang", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1025923", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 750.01, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15713, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Sunyaragi 1 2 3 4", "gppd_idnr": "WRI1000855", "capacity_mw": 80.0, "latitude": -7.4064, "longitude": 109.5842, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN \u2013 Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026057", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 333.33, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15714, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Tarakan", "gppd_idnr": "WRI1000858", "capacity_mw": 23.0, "latitude": 3.3, "longitude": 117.6333, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Cahaya Sakti", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1064213", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 95.83, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15715, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Tello", "gppd_idnr": "WRI1000859", "capacity_mw": 123.0, "latitude": -5.14, "longitude": 119.4221, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South&South East Sulawesi Regional Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026174", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 512.5, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15716, "country": "IDN", "country_long": "Indonesia", "name": "PLTGB Singkawang", "gppd_idnr": "WRI1000867", "capacity_mw": 9.0, "latitude": 0.9, "longitude": 109.0, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLT \u2013 rented from PT. Krista Inti Persada", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1041391", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 37.5, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15717, "country": "IDN", "country_long": "Indonesia", "name": "PLTGB Tanjung Batu", "gppd_idnr": "WRI1000868", "capacity_mw": 2.0, "latitude": -0.5, "longitude": 117.15, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN \u2013 sewa", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1050072", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 8.33, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15718, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Bekasi Power", "gppd_idnr": "WRI1000870", "capacity_mw": 130.0, "latitude": -6.2611, "longitude": 107.1528, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Bekasi Power/PT. Kawasan Industri Jababeka Tbk", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1075035", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 541.67, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15719, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Belawan \u2013 Sicanang", "gppd_idnr": "WRI1000871", "capacity_mw": 817.0, "latitude": 3.7715, "longitude": 98.6687, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN / KITSUMBAGUT", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1026045", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3404.21, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15720, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Cilegon", "gppd_idnr": "WRI1000874", "capacity_mw": 903.0, "latitude": -5.9306, "longitude": 106.1042, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN Cilegon Generation Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3762.55, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15721, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Grati", "gppd_idnr": "WRI1000875", "capacity_mw": 461.0, "latitude": -7.6517, "longitude": 113.0244, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026069", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1920.86, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15722, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Gresik", "gppd_idnr": "WRI1000876", "capacity_mw": 1579.0, "latitude": -7.1633, "longitude": 112.6615, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN \u2013 Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026070", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 6579.26, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15723, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Krakatau Daya Listrik (KDL)", "gppd_idnr": "WRI1000878", "capacity_mw": 400.0, "latitude": -5.9924, "longitude": 105.9849, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Krakatau Daya Listrik", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1666.69, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15724, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Muara Karang Block I", "gppd_idnr": "WRI1000879", "capacity_mw": 509.0, "latitude": -6.1087, "longitude": 106.7877, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN \u2013 Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026102", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 2120.86, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15725, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Muara Karang repowering", "gppd_idnr": "WRI1000880", "capacity_mw": 753.0, "latitude": -6.1087, "longitude": 106.7877, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN \u2013 Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026102", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3137.54, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15726, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Muara Karang repowering Blok 2", "gppd_idnr": "WRI1000881", "capacity_mw": 210.0, "latitude": -6.1087, "longitude": 106.7877, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN \u2013 Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026102", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 875.01, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15727, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Muara Tawar Block 1 &2", "gppd_idnr": "WRI1000882", "capacity_mw": 920.0, "latitude": -6.0867, "longitude": 106.9987, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026103", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3833.39, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15728, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Muara Tawar Block 5", "gppd_idnr": "WRI1000883", "capacity_mw": 384.0, "latitude": -6.0867, "longitude": 106.9987, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026103", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1600.02, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15729, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Priok Block 1 2", "gppd_idnr": "WRI1000885", "capacity_mw": 1180.0, "latitude": -6.1102, "longitude": 106.8671, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 4916.73, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15730, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Sengkang/Wajo", "gppd_idnr": "WRI1000886", "capacity_mw": 135.0, "latitude": -5.14, "longitude": 119.4221, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Energy Sengkang", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1025923", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 562.5, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15731, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Tambak Lorok", "gppd_idnr": "WRI1000887", "capacity_mw": 1034.0, "latitude": -6.9505, "longitude": 110.434, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN \u2013 Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026156", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 4308.39, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15732, "country": "IDN", "country_long": "Indonesia", "name": "PLTMG Panaran", "gppd_idnr": "WRI1000894", "capacity_mw": 24.0, "latitude": 0.1807, "longitude": 101.8444, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "bright PLN Batam", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1060287", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 100.0, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15733, "country": "IDN", "country_long": "Indonesia", "name": "PLTMG Pulau Bunyu", "gppd_idnr": "WRI1000898", "capacity_mw": 2.0, "latitude": 3.5, "longitude": 117.8333, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 8.33, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15734, "country": "IDN", "country_long": "Indonesia", "name": "PLTMG Tj. Jabung", "gppd_idnr": "WRI1000904", "capacity_mw": 8.0, "latitude": -1.0167, "longitude": 104.3667, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Tanjung Jabung Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 33.33, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15735, "country": "IDN", "country_long": "Indonesia", "name": "PLTU - Palu - Mpanau - Tawaeli", "gppd_idnr": "WRI1000906", "capacity_mw": 30.0, "latitude": -0.8917, "longitude": 119.8707, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Pusaka Jaya Palu Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 163.25, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15736, "country": "IDN", "country_long": "Indonesia", "name": "PLTU -Jeneponto I & II", "gppd_idnr": "WRI1000907", "capacity_mw": 250.0, "latitude": -5.6184, "longitude": 119.5506, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT Bosowa Energy", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1360.49, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15737, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Asam-asam 1 & 2", "gppd_idnr": "WRI1000910", "capacity_mw": 260.0, "latitude": -3.9253, "longitude": 115.1043, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - South Kalimantan Regional Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1414.91, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15738, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Banjarsari/Merapi Timur-Lahat", "gppd_idnr": "WRI1000913", "capacity_mw": 220.0, "latitude": -3.7241, "longitude": 103.6894, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Bukit Pembangkit Inovatif (PT BA 59.75% PT PJB 29.15% dan PT Navigate Innovative Indonesia (PT NII) 11.1%)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1057264", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1197.23, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15739, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Banten 1 - Suralaya unit 8", "gppd_idnr": "WRI1000914", "capacity_mw": 625.0, "latitude": -6.0585, "longitude": 106.4646, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN -.PT Indonesia Power - 2010", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026152", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3401.23, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15740, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Banten 2 - Labuhan", "gppd_idnr": "WRI1000915", "capacity_mw": 600.0, "latitude": -6.3919, "longitude": 105.8288, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN / 2010", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3265.18, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15741, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Banten 3 - Teluk Naga/Lontar", "gppd_idnr": "WRI1000916", "capacity_mw": 945.0, "latitude": -6.0585, "longitude": 106.4646, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN + Dongfang Electrik Corp PT Dalle Energy", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 5142.66, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"}