{"rowid": 19901, "country": "ZAF", "country_long": "South Africa", "name": "Adams Solar PV Project", "gppd_idnr": "WRI1061276", "capacity_mw": 82.5, "latitude": -27.3737, "longitude": 23.0076, "primary_fuel": "Solar", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "Aurora Power Solutions", "source": "Enel Green Power", "url": "https://www.enelgreenpower.com/media/press/d/2017/02/enel-brings-two-new-south-african-pv-plants-into-operation--", "geolocation_source": "Industry About", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 198.14, "estimated_generation_gwh_2014": 205.65, "estimated_generation_gwh_2015": 227.36, "estimated_generation_gwh_2016": 203.42, "estimated_generation_gwh_2017": 227.24, "estimated_generation_note_2013": "SOLAR-V1-NO-AGE", "estimated_generation_note_2014": "SOLAR-V1-NO-AGE", "estimated_generation_note_2015": "SOLAR-V1-NO-AGE", "estimated_generation_note_2016": "SOLAR-V1-NO-AGE", "estimated_generation_note_2017": "SOLAR-V1-NO-AGE"}