{"rowid": 15759, "country": "IDN", "country_long": "Indonesia", "name": "PLTU NAD-Nagan Raya", "gppd_idnr": "WRI1000956", "capacity_mw": 220.0, "latitude": 4.1089, "longitude": 96.1972, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN (EPC : Sinohydro Co. Ltd)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1073026", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1197.23, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15684, "country": "IDN", "country_long": "Indonesia", "name": "Lau Renun", "gppd_idnr": "WRI1000781", "capacity_mw": 82.0, "latitude": 3.0824, "longitude": 98.065, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - Pandan Sector", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026134", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 281.58, "estimated_generation_gwh_2014": 231.76, "estimated_generation_gwh_2015": 248.79, "estimated_generation_gwh_2016": 271.47, "estimated_generation_gwh_2017": 271.06, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15764, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Pangkalan Susu 1 & 2", "gppd_idnr": "WRI1000967", "capacity_mw": 400.0, "latitude": 4.1196, "longitude": 98.2555, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN (EPC : PT. Bagus Karya Guangdong Power Engineering PT. Nincec Multi Dimensi)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1079188", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 2176.79, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15687, "country": "IDN", "country_long": "Indonesia", "name": "Medan Steel Mill Power Plant", "gppd_idnr": "WRI1075810", "capacity_mw": 60.0, "latitude": 3.6676, "longitude": 98.6654, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2017.0, "owner": "PT Gahapi Nisco Steel", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 326.51, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15696, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Belawan", "gppd_idnr": "WRI1000817", "capacity_mw": 260.0, "latitude": 3.5833, "longitude": 98.6667, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN / KITSUMBAGUT", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026045", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1083.34, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15697, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Belawan TTF", "gppd_idnr": "WRI1000818", "capacity_mw": 105.0, "latitude": 3.5833, "longitude": 98.6667, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN / KITSUMBAGUT", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026045", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 437.5, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15719, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Belawan \u2013 Sicanang", "gppd_idnr": "WRI1000871", "capacity_mw": 817.0, "latitude": 3.7715, "longitude": 98.6687, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN / KITSUMBAGUT", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1026045", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3404.21, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15755, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Labuhan Angin", "gppd_idnr": "WRI1000948", "capacity_mw": 230.0, "latitude": 1.7176, "longitude": 98.7265, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - North Sumatera Generation Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1066585", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1251.65, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15803, "country": "IDN", "country_long": "Indonesia", "name": "Sipansihaporas", "gppd_idnr": "WRI1001018", "capacity_mw": 50.0, "latitude": 1.7427, "longitude": 98.7792, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - North Sumatera Generation Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1055420", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 160.65, "estimated_generation_gwh_2014": 122.7, "estimated_generation_gwh_2015": 148.67, "estimated_generation_gwh_2016": 163.59, "estimated_generation_gwh_2017": 167.37, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15645, "country": "IDN", "country_long": "Indonesia", "name": "Asahan I", "gppd_idnr": "WRI1000737", "capacity_mw": 180.0, "latitude": 2.5113, "longitude": 99.259, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT Bajradaya Sentranusa (China Huadian Corporation 70% + PJB 26.5%+Nusa Konstruksi Engineering 3.5%)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1076093", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 614.23, "estimated_generation_gwh_2014": 443.82, "estimated_generation_gwh_2015": 523.3, "estimated_generation_gwh_2016": 555.94, "estimated_generation_gwh_2017": 592.43, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15800, "country": "IDN", "country_long": "Indonesia", "name": "Sigura gura (asahan II)", "gppd_idnr": "WRI1001014", "capacity_mw": 286.0, "latitude": 2.5196, "longitude": 99.2793, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Indonesia Asahan aluminium", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 870.63, "estimated_generation_gwh_2014": 615.78, "estimated_generation_gwh_2015": 742.08, "estimated_generation_gwh_2016": 800.14, "estimated_generation_gwh_2017": 835.99, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15808, "country": "IDN", "country_long": "Indonesia", "name": "Tangga (asahan II)", "gppd_idnr": "WRI1001024", "capacity_mw": 317.0, "latitude": 2.5479, "longitude": 99.3028, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Indonesia Asahan aluminium", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1025945", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 965.0, "estimated_generation_gwh_2014": 682.53, "estimated_generation_gwh_2015": 822.52, "estimated_generation_gwh_2016": 886.87, "estimated_generation_gwh_2017": 926.6, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15686, "country": "IDN", "country_long": "Indonesia", "name": "Maninjau III", "gppd_idnr": "WRI1000785", "capacity_mw": 123.0, "latitude": -0.2923, "longitude": 100.152, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South Sumatera Generation Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026095", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 319.89, "estimated_generation_gwh_2014": 238.5, "estimated_generation_gwh_2015": 290.43, "estimated_generation_gwh_2016": 325.76, "estimated_generation_gwh_2017": 335.29, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15807, "country": "IDN", "country_long": "Indonesia", "name": "Talang Padang", "gppd_idnr": "WRI1001023", "capacity_mw": 12.5, "latitude": -0.9492, "longitude": 100.3543, "primary_fuel": "Oil", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South Sumatera Generation Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1093596", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 22.56, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15771, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Sumbar - Teluk sirih Unit 1", "gppd_idnr": "WRI1000980", "capacity_mw": 112.0, "latitude": -1.0772, "longitude": 100.3727, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN (EPC: CNTIC (China National Tecnical Import Corporation))", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1066878", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 609.5, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15802, "country": "IDN", "country_long": "Indonesia", "name": "Singkarak", "gppd_idnr": "WRI1001017", "capacity_mw": 175.0, "latitude": -0.6909, "longitude": 100.6034, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South Sumatera Generation Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026146", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 551.31, "estimated_generation_gwh_2014": 462.3, "estimated_generation_gwh_2015": 484.64, "estimated_generation_gwh_2016": 533.52, "estimated_generation_gwh_2017": 559.21, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15760, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Ombilin - Sijantang - Sawahlunto", "gppd_idnr": "WRI1000960", "capacity_mw": 200.0, "latitude": -0.6094, "longitude": 100.7535, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South Sumatera Generation Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026107", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1088.39, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15677, "country": "IDN", "country_long": "Indonesia", "name": "Koto Panjang Kampar", "gppd_idnr": "WRI1000775", "capacity_mw": 114.0, "latitude": 0.2905, "longitude": 100.8814, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 419.08, "estimated_generation_gwh_2014": 310.21, "estimated_generation_gwh_2015": 359.57, "estimated_generation_gwh_2016": 397.38, "estimated_generation_gwh_2017": 420.15, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15693, "country": "IDN", "country_long": "Indonesia", "name": "North Duri Cogeneration Plant", "gppd_idnr": "WRI1000794", "capacity_mw": 300.0, "latitude": 1.3722, "longitude": 101.226, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT Mandau Cipta Tenaga Nusanatara (subsidiary of Chevron)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1092378", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1250.01, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15787, "country": "IDN", "country_long": "Indonesia", "name": "Pekanbaru Tenayan power station", "gppd_idnr": "WRI1075813", "capacity_mw": 220.0, "latitude": 0.5644, "longitude": 101.5234, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2016.0, "owner": "PT PLN Persero", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1197.23, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15789, "country": "IDN", "country_long": "Indonesia", "name": "Perawang Mill power station", "gppd_idnr": "WRI1075814", "capacity_mw": 755.0, "latitude": 0.6893, "longitude": 101.6191, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2009.0, "owner": "PT Indah Kiat Pulp & Paper", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 4108.69, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15732, "country": "IDN", "country_long": "Indonesia", "name": "PLTMG Panaran", "gppd_idnr": "WRI1000894", "capacity_mw": 24.0, "latitude": 0.1807, "longitude": 101.8444, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "bright PLN Batam", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1060287", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 100.0, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15691, "country": "IDN", "country_long": "Indonesia", "name": "Musi", "gppd_idnr": "WRI1000792", "capacity_mw": 215.475, "latitude": -3.766, "longitude": 102.435, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South Sumatera Generation Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026105", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 561.45, "estimated_generation_gwh_2014": 422.24, "estimated_generation_gwh_2015": 513.22, "estimated_generation_gwh_2016": 571.75, "estimated_generation_gwh_2017": 588.43, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15672, "country": "IDN", "country_long": "Indonesia", "name": "Keban Agung power station", "gppd_idnr": "WRI1075807", "capacity_mw": 270.0, "latitude": -3.7515, "longitude": 103.6481, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2015.0, "owner": "PT Primanaya Energi", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1469.33, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15738, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Banjarsari/Merapi Timur-Lahat", "gppd_idnr": "WRI1000913", "capacity_mw": 220.0, "latitude": -3.7241, "longitude": 103.6894, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Bukit Pembangkit Inovatif (PT BA 59.75% PT PJB 29.15% dan PT Navigate Innovative Indonesia (PT NII) 11.1%)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1057264", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1197.23, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15743, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Bukit Asam", "gppd_idnr": "WRI1000919", "capacity_mw": 30.0, "latitude": -3.7316, "longitude": 103.7975, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT BA for own use", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026052", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 163.25, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15777, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Tanjung Enim -Bukit Asam", "gppd_idnr": "WRI1000988", "capacity_mw": 260.0, "latitude": -3.7316, "longitude": 103.7975, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South Sumatera Generation Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1076783", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1414.91, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15769, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Simpang Belimbing", "gppd_idnr": "WRI1000978", "capacity_mw": 227.0, "latitude": -3.4, "longitude": 104.1158, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Guo Hua Energy Musi Makmur", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1075907", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1235.32, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15780, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Tanjung Kasam", "gppd_idnr": "WRI1000992", "capacity_mw": 110.0, "latitude": 1.0455, "longitude": 104.133, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Tanjung Kasam Power Batam (PT. TJK Power)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1060288", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 598.61, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15734, "country": "IDN", "country_long": "Indonesia", "name": "PLTMG Tj. Jabung", "gppd_idnr": "WRI1000904", "capacity_mw": 8.0, "latitude": -1.0167, "longitude": 104.3667, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Tanjung Jabung Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 33.33, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15816, "country": "IDN", "country_long": "Indonesia", "name": "Ulubelu 1 & 2", "gppd_idnr": "WRI1001040", "capacity_mw": 110.0, "latitude": -5.3096, "longitude": 104.5733, "primary_fuel": "Geothermal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. PLN", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1011547", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": null, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "NO-ESTIMATION"} {"rowid": 15704, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Keramasan", "gppd_idnr": "WRI1000833", "capacity_mw": 145.0, "latitude": -2.9167, "longitude": 104.7458, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT Asta Keramasan Energy (AKE)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026111", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 604.17, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15705, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Keramasan #1 2 3 4", "gppd_idnr": "WRI1000834", "capacity_mw": 65.0, "latitude": -2.9167, "longitude": 104.7458, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South Sumatera Generation Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026111", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 270.83, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15810, "country": "IDN", "country_long": "Indonesia", "name": "Tegineneng", "gppd_idnr": "WRI1001028", "capacity_mw": 28.2, "latitude": -5.6015, "longitude": 104.7988, "primary_fuel": "Oil", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South Sumatera Generation Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026165", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 50.9, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15651, "country": "IDN", "country_long": "Indonesia", "name": "Besai - Way Kanan", "gppd_idnr": "WRI1000744", "capacity_mw": 92.8, "latitude": -4.9822, "longitude": 104.8051, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South Sumatera Generation Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1026048", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 268.15, "estimated_generation_gwh_2014": 244.77, "estimated_generation_gwh_2015": 253.6, "estimated_generation_gwh_2016": 273.52, "estimated_generation_gwh_2017": 280.63, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15781, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Tarahan # 1 2", "gppd_idnr": "WRI1000994", "capacity_mw": 200.0, "latitude": -5.518, "longitude": 105.35, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1026163", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1088.39, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15782, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Tarahan 3 & 4 - Sebalang", "gppd_idnr": "WRI1000995", "capacity_mw": 200.0, "latitude": -5.518, "longitude": 105.35, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1088.39, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15682, "country": "IDN", "country_long": "Indonesia", "name": "Lampung Sebalang power station", "gppd_idnr": "WRI1075809", "capacity_mw": 200.0, "latitude": -5.5859, "longitude": 105.3872, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2015.0, "owner": "PT PLN Persero", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1088.39, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15740, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Banten 2 - Labuhan", "gppd_idnr": "WRI1000915", "capacity_mw": 600.0, "latitude": -6.3919, "longitude": 105.8288, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN / 2010", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3265.18, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15723, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Krakatau Daya Listrik (KDL)", "gppd_idnr": "WRI1000878", "capacity_mw": 400.0, "latitude": -5.9924, "longitude": 105.9849, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Krakatau Daya Listrik", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1666.69, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15706, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Krakatau Posco Energy", "gppd_idnr": "WRI1000835", "capacity_mw": 200.0, "latitude": -6.0048, "longitude": 105.9961, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Krakatau Posco Energy (JV : Korea Posco Energy (70%) + PT. Krakatau Daya Listrik (30%))", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 833.34, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15773, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Suralaya", "gppd_idnr": "WRI1000982", "capacity_mw": 3400.0, "latitude": -5.892, "longitude": 106.03, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN -.PT Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026152", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 18502.72, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15648, "country": "IDN", "country_long": "Indonesia", "name": "Banten Serang power station", "gppd_idnr": "WRI1075800", "capacity_mw": 660.0, "latitude": -5.883, "longitude": 106.0459, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2017.0, "owner": "PT Lestari Baten Energi (LBE)", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3591.7, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15689, "country": "IDN", "country_long": "Indonesia", "name": "Merak power station", "gppd_idnr": "WRI1075811", "capacity_mw": 120.0, "latitude": -5.884, "longitude": 106.0642, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2014.0, "owner": "PT Merak Energi", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 653.03, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15720, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Cilegon", "gppd_idnr": "WRI1000874", "capacity_mw": 903.0, "latitude": -5.9306, "longitude": 106.1042, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN Cilegon Generation Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3762.55, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15739, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Banten 1 - Suralaya unit 8", "gppd_idnr": "WRI1000914", "capacity_mw": 625.0, "latitude": -6.0585, "longitude": 106.4646, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN -.PT Indonesia Power - 2010", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026152", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3401.23, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15741, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Banten 3 - Teluk Naga/Lontar", "gppd_idnr": "WRI1000916", "capacity_mw": 945.0, "latitude": -6.0585, "longitude": 106.4646, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN + Dongfang Electrik Corp PT Dalle Energy", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 5142.66, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15749, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Jabar Selatan - Pelabuhan Ratu", "gppd_idnr": "WRI1000938", "capacity_mw": 1050.0, "latitude": -7.0242, "longitude": 106.5464, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1066867", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 5714.07, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15665, "country": "IDN", "country_long": "Indonesia", "name": "Gunung Salak", "gppd_idnr": "WRI1000759", "capacity_mw": 375.0, "latitude": -6.7416, "longitude": 106.648, "primary_fuel": "Geothermal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Chevron Geothermal Salak Ltd", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1026072", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": null, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "NO-ESTIMATION"} {"rowid": 15664, "country": "IDN", "country_long": "Indonesia", "name": "Gunung Malang", "gppd_idnr": "WRI1000758", "capacity_mw": 25.536, "latitude": -6.7409, "longitude": 106.673, "primary_fuel": "Oil", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-East Kalimantan Regional Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 46.09, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15698, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Cikarang Listrindo", "gppd_idnr": "WRI1000821", "capacity_mw": 150.0, "latitude": -6.1133, "longitude": 106.7788, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Cikarang Listrindo", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 625.0, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15724, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Muara Karang Block I", "gppd_idnr": "WRI1000879", "capacity_mw": 509.0, "latitude": -6.1087, "longitude": 106.7877, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN \u2013 Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026102", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 2120.86, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15725, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Muara Karang repowering", "gppd_idnr": "WRI1000880", "capacity_mw": 753.0, "latitude": -6.1087, "longitude": 106.7877, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN \u2013 Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026102", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3137.54, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15726, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Muara Karang repowering Blok 2", "gppd_idnr": "WRI1000881", "capacity_mw": 210.0, "latitude": -6.1087, "longitude": 106.7877, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN \u2013 Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026102", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 875.01, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15758, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Muara Karang", "gppd_idnr": "WRI1000954", "capacity_mw": 400.0, "latitude": -6.1069, "longitude": 106.7882, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1026102", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 2176.79, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15729, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Priok Block 1 2", "gppd_idnr": "WRI1000885", "capacity_mw": 1180.0, "latitude": -6.1102, "longitude": 106.8671, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 4916.73, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15711, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Priok", "gppd_idnr": "WRI1000846", "capacity_mw": 52.0, "latitude": -6.1071, "longitude": 106.8716, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 216.66, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15766, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Priok 3 & 4", "gppd_idnr": "WRI1000972", "capacity_mw": 100.0, "latitude": -6.1071, "longitude": 106.8716, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 544.19, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15707, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Muara Tawar B-3", "gppd_idnr": "WRI1000836", "capacity_mw": 420.0, "latitude": -6.0867, "longitude": 106.9987, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026103", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1750.02, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15708, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Muara Tawar Block 4", "gppd_idnr": "WRI1000837", "capacity_mw": 420.0, "latitude": -6.0867, "longitude": 106.9987, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026103", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1750.02, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15727, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Muara Tawar Block 1 &2", "gppd_idnr": "WRI1000882", "capacity_mw": 920.0, "latitude": -6.0867, "longitude": 106.9987, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026103", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3833.39, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15728, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Muara Tawar Block 5", "gppd_idnr": "WRI1000883", "capacity_mw": 384.0, "latitude": -6.0867, "longitude": 106.9987, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026103", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1600.02, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15656, "country": "IDN", "country_long": "Indonesia", "name": "Cikarang Babelan power station", "gppd_idnr": "WRI1075803", "capacity_mw": 280.0, "latitude": -6.1161, "longitude": 107.052, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2017.0, "owner": "PT Cikarang Listrindo", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1523.75, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15718, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Bekasi Power", "gppd_idnr": "WRI1000870", "capacity_mw": 130.0, "latitude": -6.2611, "longitude": 107.1528, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Bekasi Power/PT. Kawasan Industri Jababeka Tbk", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1075035", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 541.67, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15796, "country": "IDN", "country_long": "Indonesia", "name": "Saguling", "gppd_idnr": "WRI1001005", "capacity_mw": 700.72, "latitude": -6.9126, "longitude": 107.3663, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026135", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 2110.52, "estimated_generation_gwh_2014": 1512.59, "estimated_generation_gwh_2015": 2024.74, "estimated_generation_gwh_2016": 2178.25, "estimated_generation_gwh_2017": 2110.52, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15658, "country": "IDN", "country_long": "Indonesia", "name": "CirataI & II", "gppd_idnr": "WRI1000748", "capacity_mw": 1008.0, "latitude": -6.7004, "longitude": 107.3671, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1026056", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 3426.09, "estimated_generation_gwh_2014": 2354.32, "estimated_generation_gwh_2015": 3099.69, "estimated_generation_gwh_2016": 3272.44, "estimated_generation_gwh_2017": 3205.36, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15666, "country": "IDN", "country_long": "Indonesia", "name": "Jatiluhur", "gppd_idnr": "WRI1000762", "capacity_mw": 186.0, "latitude": -6.523, "longitude": 107.389, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "Perum Jasa Tirta II", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 670.77, "estimated_generation_gwh_2014": 452.3, "estimated_generation_gwh_2015": 524.85, "estimated_generation_gwh_2016": 671.81, "estimated_generation_gwh_2017": 664.17, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15794, "country": "IDN", "country_long": "Indonesia", "name": "Purwakarta Indorama Power Station", "gppd_idnr": "WRI1075815", "capacity_mw": 60.0, "latitude": -6.5539, "longitude": 107.4137, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2006.0, "owner": "PT Indorama Synthetics Tbk", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 326.51, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15669, "country": "IDN", "country_long": "Indonesia", "name": "Kamojang 1 2 3", "gppd_idnr": "WRI1000764", "capacity_mw": 140.0, "latitude": -6.4239, "longitude": 107.4553, "primary_fuel": "Geothermal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN \u2013 Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026079", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": null, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "NO-ESTIMATION"} {"rowid": 15670, "country": "IDN", "country_long": "Indonesia", "name": "Kamojang 4", "gppd_idnr": "WRI1000765", "capacity_mw": 60.0, "latitude": -6.4239, "longitude": 107.4553, "primary_fuel": "Geothermal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Pertamina Geothermal Energy", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026079", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": null, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "NO-ESTIMATION"} {"rowid": 15650, "country": "IDN", "country_long": "Indonesia", "name": "Bengkok+Dago/saguling", "gppd_idnr": "WRI1000743", "capacity_mw": 3.85, "latitude": -6.6247, "longitude": 107.5564, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 13.0, "estimated_generation_gwh_2014": 10.85, "estimated_generation_gwh_2015": 13.53, "estimated_generation_gwh_2016": 13.6, "estimated_generation_gwh_2017": 13.49, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15655, "country": "IDN", "country_long": "Indonesia", "name": "Cikalong/saguling", "gppd_idnr": "WRI1000747", "capacity_mw": 19.2, "latitude": -6.9039, "longitude": 107.6186, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026135", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 70.7, "estimated_generation_gwh_2014": 65.53, "estimated_generation_gwh_2015": 63.95, "estimated_generation_gwh_2016": 76.04, "estimated_generation_gwh_2017": 65.27, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15678, "country": "IDN", "country_long": "Indonesia", "name": "Kracak/saguling", "gppd_idnr": "WRI1000776", "capacity_mw": 18.9, "latitude": -6.9039, "longitude": 107.6186, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026135", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 69.59, "estimated_generation_gwh_2014": 64.51, "estimated_generation_gwh_2015": 62.95, "estimated_generation_gwh_2016": 74.85, "estimated_generation_gwh_2017": 64.25, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15681, "country": "IDN", "country_long": "Indonesia", "name": "Lamajan/saguling", "gppd_idnr": "WRI1000779", "capacity_mw": 19.56, "latitude": -6.9039, "longitude": 107.6186, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026135", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 72.02, "estimated_generation_gwh_2014": 65.75, "estimated_generation_gwh_2015": 64.14, "estimated_generation_gwh_2016": 77.47, "estimated_generation_gwh_2017": 66.5, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15793, "country": "IDN", "country_long": "Indonesia", "name": "Plengan/Saguling", "gppd_idnr": "WRI1000806", "capacity_mw": 6.87, "latitude": -6.9039, "longitude": 107.6186, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 24.7, "estimated_generation_gwh_2014": 24.04, "estimated_generation_gwh_2015": 23.47, "estimated_generation_gwh_2016": 26.71, "estimated_generation_gwh_2017": 23.28, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15815, "country": "IDN", "country_long": "Indonesia", "name": "Ubrug/saguling", "gppd_idnr": "WRI1001039", "capacity_mw": 18.36, "latitude": -6.9039, "longitude": 107.6186, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 67.6, "estimated_generation_gwh_2014": 62.66, "estimated_generation_gwh_2015": 61.15, "estimated_generation_gwh_2016": 72.72, "estimated_generation_gwh_2017": 62.42, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15817, "country": "IDN", "country_long": "Indonesia", "name": "Wayang Windu", "gppd_idnr": "WRI1001044", "capacity_mw": 227.0, "latitude": -7.1966, "longitude": 107.6258, "primary_fuel": "Geothermal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Star Energy", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1010414", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": null, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "NO-ESTIMATION"} {"rowid": 15659, "country": "IDN", "country_long": "Indonesia", "name": "Darajat 1", "gppd_idnr": "WRI1000750", "capacity_mw": 55.0, "latitude": -7.2173, "longitude": 107.7394, "primary_fuel": "Geothermal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN \u2013 Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": null, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "NO-ESTIMATION"} {"rowid": 15660, "country": "IDN", "country_long": "Indonesia", "name": "Darajat 2 3", "gppd_idnr": "WRI1000751", "capacity_mw": 215.0, "latitude": -7.2173, "longitude": 107.7394, "primary_fuel": "Geothermal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Chevron Geothermal Darajat Ltd", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": null, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "NO-ESTIMATION"} {"rowid": 15750, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Jawa Barat - Indramayu", "gppd_idnr": "WRI1000939", "capacity_mw": 990.0, "latitude": -6.2747, "longitude": 107.9704, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN + China National Electric Engineering Co. Ltd. (CNEEC)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1071378", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 5387.55, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15745, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Cirebon", "gppd_idnr": "WRI1000921", "capacity_mw": 660.0, "latitude": -6.7704, "longitude": 108.6151, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Cirebon Electric Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1066870", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3591.7, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15716, "country": "IDN", "country_long": "Indonesia", "name": "PLTGB Singkawang", "gppd_idnr": "WRI1000867", "capacity_mw": 9.0, "latitude": 0.9, "longitude": 109.0, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLT \u2013 rented from PT. Krista Inti Persada", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1041391", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 37.5, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15699, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Cilacap", "gppd_idnr": "WRI1000822", "capacity_mw": 55.0, "latitude": -7.7264, "longitude": 109.0094, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN \u2013 Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 229.17, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15744, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Cilacap 1 & 2", "gppd_idnr": "WRI1000920", "capacity_mw": 600.0, "latitude": -7.7513, "longitude": 109.0186, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Sumber Segara Primadaya", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1050225", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3265.18, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15657, "country": "IDN", "country_long": "Indonesia", "name": "Cilacap Sumber power station", "gppd_idnr": "WRI1075804", "capacity_mw": 1260.0, "latitude": -7.6832, "longitude": 109.0964, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2011.0, "owner": "Sumber Segara Primadaya", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 6856.89, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15675, "country": "IDN", "country_long": "Indonesia", "name": "Ketenger / mrica", "gppd_idnr": "WRI1000772", "capacity_mw": 8.04, "latitude": -7.5097, "longitude": 109.2778, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1050220", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 33.59, "estimated_generation_gwh_2014": 25.5, "estimated_generation_gwh_2015": 29.83, "estimated_generation_gwh_2016": 35.02, "estimated_generation_gwh_2017": 32.34, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15797, "country": "IDN", "country_long": "Indonesia", "name": "Sempor/Mrica", "gppd_idnr": "WRI1001009", "capacity_mw": 1.0, "latitude": -7.4733, "longitude": 109.3331, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1050218", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 3.35, "estimated_generation_gwh_2014": 3.45, "estimated_generation_gwh_2015": 3.96, "estimated_generation_gwh_2016": 3.31, "estimated_generation_gwh_2017": 3.53, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15695, "country": "IDN", "country_long": "Indonesia", "name": "PLTG (ex PLTD Sunyaragi)", "gppd_idnr": "WRI1000809", "capacity_mw": 18.0, "latitude": -7.4064, "longitude": 109.5842, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South Sumatera Generation Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026057", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 75.0, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15700, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Duri ex PLTG Sunyaragi Cent Java", "gppd_idnr": "WRI1000824", "capacity_mw": 20.0, "latitude": -7.4064, "longitude": 109.5842, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026057", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 83.33, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15713, "country": "IDN", "country_long": "Indonesia", "name": "PLTG Sunyaragi 1 2 3 4", "gppd_idnr": "WRI1000855", "capacity_mw": 80.0, "latitude": -7.4064, "longitude": 109.5842, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN \u2013 Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026057", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 333.33, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15694, "country": "IDN", "country_long": "Indonesia", "name": "PB. Sudirman/Mrica", "gppd_idnr": "WRI1000800", "capacity_mw": 180.9, "latitude": -7.3927, "longitude": 109.6054, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026120", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 574.49, "estimated_generation_gwh_2014": 398.71, "estimated_generation_gwh_2015": 459.9, "estimated_generation_gwh_2016": 565.77, "estimated_generation_gwh_2017": 567.57, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15786, "country": "IDN", "country_long": "Indonesia", "name": "Pejengkolan/Mrica", "gppd_idnr": "WRI1000801", "capacity_mw": 1.4, "latitude": -7.5694, "longitude": 109.8006, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026121", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 2.83, "estimated_generation_gwh_2014": 2.23, "estimated_generation_gwh_2015": 2.96, "estimated_generation_gwh_2016": 3.02, "estimated_generation_gwh_2017": 3.01, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15661, "country": "IDN", "country_long": "Indonesia", "name": "Dieng", "gppd_idnr": "WRI1000752", "capacity_mw": 60.0, "latitude": -7.2061, "longitude": 109.9119, "primary_fuel": "Geothermal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Geo Dipa Energy", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1018473", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": null, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "NO-ESTIMATION"} {"rowid": 15674, "country": "IDN", "country_long": "Indonesia", "name": "Ketapang Smelter power station", "gppd_idnr": "WRI1075808", "capacity_mw": 80.0, "latitude": -2.3662, "longitude": 110.1573, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2016.0, "owner": "PT Well Harvest Winning Alumina Refinery", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 435.35, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15799, "country": "IDN", "country_long": "Indonesia", "name": "Sidorejo/Mrica", "gppd_idnr": "WRI1001013", "capacity_mw": 1.4, "latitude": -7.4764, "longitude": 110.2622, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1050222", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 3.78, "estimated_generation_gwh_2014": 3.83, "estimated_generation_gwh_2015": 4.47, "estimated_generation_gwh_2016": 3.98, "estimated_generation_gwh_2017": 4.23, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15813, "country": "IDN", "country_long": "Indonesia", "name": "Timo / Mrica", "gppd_idnr": "WRI1001035", "capacity_mw": 12.0, "latitude": -6.9485, "longitude": 110.4069, "primary_fuel": "Hydro", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026168", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 36.17, "estimated_generation_gwh_2014": 27.97, "estimated_generation_gwh_2015": 34.2, "estimated_generation_gwh_2016": 37.89, "estimated_generation_gwh_2017": 37.79, "estimated_generation_note_2013": "HYDRO-V1", "estimated_generation_note_2014": "HYDRO-V1", "estimated_generation_note_2015": "HYDRO-V1", "estimated_generation_note_2016": "HYDRO-V1", "estimated_generation_note_2017": "HYDRO-V1"} {"rowid": 15775, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Tambak Lorok", "gppd_idnr": "WRI1000984", "capacity_mw": 300.0, "latitude": -6.9507, "longitude": 110.4304, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026156", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1632.59, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15731, "country": "IDN", "country_long": "Indonesia", "name": "PLTGU Tambak Lorok", "gppd_idnr": "WRI1000887", "capacity_mw": 1034.0, "latitude": -6.9505, "longitude": 110.434, "primary_fuel": "Gas", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN \u2013 Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026156", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 4308.39, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15778, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Tanjung Jati B", "gppd_idnr": "WRI1000990", "capacity_mw": 1320.0, "latitude": -6.446, "longitude": 110.7423, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Central Java Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1052927", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 7183.4, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15779, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Tanjung Jati B - expansion", "gppd_idnr": "WRI1000991", "capacity_mw": 1324.0, "latitude": -6.446, "longitude": 110.7423, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Central Java Power (EPC : Korea Midland Power Co)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1052927", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 7205.17, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"}