{"rowid": 20459, "country": "ESP", "country_long": "Spain", "name": "MAJADAS", "gppd_idnr": "WRI1006663", "capacity_mw": 49.9, "latitude": 39.9687, "longitude": -5.7417, "primary_fuel": "Solar", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2010.0, "owner": "TERMOSOLAR MAJADAS S.L.", "source": "Red El\u00e9ctrica de Espa\u00f1a", "url": "http://www.ree.es/en/statistical-data-of-spanish-electrical-system/annual-report/preliminary-report-spanish-electricity-system-2015", "geolocation_source": "GEODB", "wepp_id": "1073135", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": 111.81, "estimated_generation_gwh_2014": 109.01, "estimated_generation_gwh_2015": 102.5, "estimated_generation_gwh_2016": 103.02, "estimated_generation_gwh_2017": 100.61, "estimated_generation_note_2013": "SOLAR-V1", "estimated_generation_note_2014": "SOLAR-V1", "estimated_generation_note_2015": "SOLAR-V1", "estimated_generation_note_2016": "SOLAR-V1", "estimated_generation_note_2017": "SOLAR-V1"}