{"rowid": 20920, "country": "ESP", "country_long": "Spain", "name": "TRATAMIENTO DE PURINES", "gppd_idnr": "WRI1007981", "capacity_mw": 15.0, "latitude": 41.5667, "longitude": 0.5167, "primary_fuel": "Waste", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2005.0, "owner": "NEOELECTRA SC ECONERGIA NAVARRA S.L.", "source": "Red El\u00e9ctrica de Espa\u00f1a", "url": "http://www.ree.es/en/statistical-data-of-spanish-electrical-system/annual-report/preliminary-report-spanish-electricity-system-2015", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 5.22, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"}