{"rowid": 15642, "country": "IDN", "country_long": "Indonesia", "name": "Amamapare Port power station", "gppd_idnr": "WRI1075798", "capacity_mw": 195.0, "latitude": -4.8278, "longitude": 136.8391, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 1998.0, "owner": "PT Puncakjaya Power", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1061.18, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15644, "country": "IDN", "country_long": "Indonesia", "name": "Amurang power station", "gppd_idnr": "WRI1075799", "capacity_mw": 60.0, "latitude": 1.1825, "longitude": 124.4806, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2012.0, "owner": "PLN", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 326.51, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15648, "country": "IDN", "country_long": "Indonesia", "name": "Banten Serang power station", "gppd_idnr": "WRI1075800", "capacity_mw": 660.0, "latitude": -5.883, "longitude": 106.0459, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2017.0, "owner": "PT Lestari Baten Energi (LBE)", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3591.7, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15649, "country": "IDN", "country_long": "Indonesia", "name": "Batu Hijau power station", "gppd_idnr": "WRI1075801", "capacity_mw": 124.0, "latitude": -8.9012, "longitude": 116.7382, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 1999.0, "owner": "Pt Newmont Nusa Tenggara", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 674.8, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15654, "country": "IDN", "country_long": "Indonesia", "name": "Celukan Bawang power station", "gppd_idnr": "WRI1075802", "capacity_mw": 381.0, "latitude": -8.1963, "longitude": 114.8516, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2015.0, "owner": "PT General Energy Bali", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 2073.39, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15656, "country": "IDN", "country_long": "Indonesia", "name": "Cikarang Babelan power station", "gppd_idnr": "WRI1075803", "capacity_mw": 280.0, "latitude": -6.1161, "longitude": 107.052, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2017.0, "owner": "PT Cikarang Listrindo", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1523.75, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15657, "country": "IDN", "country_long": "Indonesia", "name": "Cilacap Sumber power station", "gppd_idnr": "WRI1075804", "capacity_mw": 1260.0, "latitude": -7.6832, "longitude": 109.0964, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2011.0, "owner": "Sumber Segara Primadaya", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 6856.89, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15667, "country": "IDN", "country_long": "Indonesia", "name": "Kalteng-1 Pulang Pisau power station", "gppd_idnr": "WRI1075805", "capacity_mw": 120.0, "latitude": -2.8226, "longitude": 114.2088, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2015.0, "owner": "PT PLN Persero", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 653.03, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15668, "country": "IDN", "country_long": "Indonesia", "name": "Kaltim Teluk Balikpapan power station", "gppd_idnr": "WRI1075806", "capacity_mw": 220.0, "latitude": -1.1704, "longitude": 116.7887, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2015.0, "owner": "PLN", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1197.23, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15672, "country": "IDN", "country_long": "Indonesia", "name": "Keban Agung power station", "gppd_idnr": "WRI1075807", "capacity_mw": 270.0, "latitude": -3.7515, "longitude": 103.6481, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2015.0, "owner": "PT Primanaya Energi", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1469.33, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15674, "country": "IDN", "country_long": "Indonesia", "name": "Ketapang Smelter power station", "gppd_idnr": "WRI1075808", "capacity_mw": 80.0, "latitude": -2.3662, "longitude": 110.1573, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2016.0, "owner": "PT Well Harvest Winning Alumina Refinery", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 435.35, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15682, "country": "IDN", "country_long": "Indonesia", "name": "Lampung Sebalang power station", "gppd_idnr": "WRI1075809", "capacity_mw": 200.0, "latitude": -5.5859, "longitude": 105.3872, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2015.0, "owner": "PT PLN Persero", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1088.39, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15687, "country": "IDN", "country_long": "Indonesia", "name": "Medan Steel Mill Power Plant", "gppd_idnr": "WRI1075810", "capacity_mw": 60.0, "latitude": 3.6676, "longitude": 98.6654, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2017.0, "owner": "PT Gahapi Nisco Steel", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 326.51, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15689, "country": "IDN", "country_long": "Indonesia", "name": "Merak power station", "gppd_idnr": "WRI1075811", "capacity_mw": 120.0, "latitude": -5.884, "longitude": 106.0642, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2014.0, "owner": "PT Merak Energi", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 653.03, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15735, "country": "IDN", "country_long": "Indonesia", "name": "PLTU - Palu - Mpanau - Tawaeli", "gppd_idnr": "WRI1000906", "capacity_mw": 30.0, "latitude": -0.8917, "longitude": 119.8707, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Pusaka Jaya Palu Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 163.25, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15736, "country": "IDN", "country_long": "Indonesia", "name": "PLTU -Jeneponto I & II", "gppd_idnr": "WRI1000907", "capacity_mw": 250.0, "latitude": -5.6184, "longitude": 119.5506, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT Bosowa Energy", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1360.49, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15737, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Asam-asam 1 & 2", "gppd_idnr": "WRI1000910", "capacity_mw": 260.0, "latitude": -3.9253, "longitude": 115.1043, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - South Kalimantan Regional Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1414.91, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15738, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Banjarsari/Merapi Timur-Lahat", "gppd_idnr": "WRI1000913", "capacity_mw": 220.0, "latitude": -3.7241, "longitude": 103.6894, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Bukit Pembangkit Inovatif (PT BA 59.75% PT PJB 29.15% dan PT Navigate Innovative Indonesia (PT NII) 11.1%)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1057264", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1197.23, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15739, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Banten 1 - Suralaya unit 8", "gppd_idnr": "WRI1000914", "capacity_mw": 625.0, "latitude": -6.0585, "longitude": 106.4646, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN -.PT Indonesia Power - 2010", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026152", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3401.23, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15740, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Banten 2 - Labuhan", "gppd_idnr": "WRI1000915", "capacity_mw": 600.0, "latitude": -6.3919, "longitude": 105.8288, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN / 2010", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3265.18, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15741, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Banten 3 - Teluk Naga/Lontar", "gppd_idnr": "WRI1000916", "capacity_mw": 945.0, "latitude": -6.0585, "longitude": 106.4646, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN + Dongfang Electrik Corp PT Dalle Energy", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 5142.66, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15742, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Bilibili", "gppd_idnr": "WRI1000918", "capacity_mw": 2.0, "latitude": -2.5213, "longitude": 121.357, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South&South East Sulawesi Regional Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 10.88, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15743, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Bukit Asam", "gppd_idnr": "WRI1000919", "capacity_mw": 30.0, "latitude": -3.7316, "longitude": 103.7975, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT BA for own use", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026052", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 163.25, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15744, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Cilacap 1 & 2", "gppd_idnr": "WRI1000920", "capacity_mw": 600.0, "latitude": -7.7513, "longitude": 109.0186, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Sumber Segara Primadaya", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1050225", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3265.18, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15745, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Cirebon", "gppd_idnr": "WRI1000921", "capacity_mw": 660.0, "latitude": -6.7704, "longitude": 108.6151, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Cirebon Electric Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1066870", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3591.7, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15746, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Embalut - Tanjung Batu", "gppd_idnr": "WRI1000925", "capacity_mw": 50.0, "latitude": -0.5, "longitude": 117.15, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Cahaya Fajar Kaltim", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1058260", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 272.09, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15747, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Gresik", "gppd_idnr": "WRI1000929", "capacity_mw": 600.0, "latitude": -7.1633, "longitude": 112.6615, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1026070", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3265.18, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15748, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Hendratna", "gppd_idnr": "WRI1000932", "capacity_mw": 5.0, "latitude": -2.5213, "longitude": 121.357, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Hendratna Plywood", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 27.2, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15749, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Jabar Selatan - Pelabuhan Ratu", "gppd_idnr": "WRI1000938", "capacity_mw": 1050.0, "latitude": -7.0242, "longitude": 106.5464, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1066867", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 5714.07, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15750, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Jawa Barat - Indramayu", "gppd_idnr": "WRI1000939", "capacity_mw": 990.0, "latitude": -6.2747, "longitude": 107.9704, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN + China National Electric Engineering Co. Ltd. (CNEEC)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1071378", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 5387.55, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15751, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Jawa Tengah 1 - Rembang", "gppd_idnr": "WRI1000940", "capacity_mw": 630.0, "latitude": -6.636, "longitude": 111.4749, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN(EPC : Zeland-Priamanaya-Tronoh)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1065762", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3428.44, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15752, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Kaur", "gppd_idnr": "WRI1000943", "capacity_mw": 200.0, "latitude": -2.5213, "longitude": 121.357, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1088.39, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15753, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Keramasan", "gppd_idnr": "WRI1000945", "capacity_mw": 25.0, "latitude": -2.5213, "longitude": 121.357, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South Sumatera Generation Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026111", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 136.04, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15754, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Kupang", "gppd_idnr": "WRI1000947", "capacity_mw": 30.0, "latitude": -2.5213, "longitude": 121.357, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Indonesia Power & electrindo Perkasa Utama", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026086", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 163.25, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15755, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Labuhan Angin", "gppd_idnr": "WRI1000948", "capacity_mw": 230.0, "latitude": 1.7176, "longitude": 98.7265, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - North Sumatera Generation Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1066585", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1251.65, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15756, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Lati", "gppd_idnr": "WRI1000949", "capacity_mw": 14.0, "latitude": -2.5213, "longitude": 121.357, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - East Kalimantan Regional Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1088444", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 76.18, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15757, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Listrindo", "gppd_idnr": "WRI1000950", "capacity_mw": 2.5, "latitude": -2.5213, "longitude": 121.357, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Listrindo (IPP)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 13.6, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15758, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Muara Karang", "gppd_idnr": "WRI1000954", "capacity_mw": 400.0, "latitude": -6.1069, "longitude": 106.7882, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - Java Bali Generation Unit / PT. PJB", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1026102", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 2176.79, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15759, "country": "IDN", "country_long": "Indonesia", "name": "PLTU NAD-Nagan Raya", "gppd_idnr": "WRI1000956", "capacity_mw": 220.0, "latitude": 4.1089, "longitude": 96.1972, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN (EPC : Sinohydro Co. Ltd)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1073026", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1197.23, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15760, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Ombilin - Sijantang - Sawahlunto", "gppd_idnr": "WRI1000960", "capacity_mw": 200.0, "latitude": -0.6094, "longitude": 100.7535, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South Sumatera Generation Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026107", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1088.39, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15761, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Paiton I Unit 7 & 8", "gppd_idnr": "WRI1000941", "capacity_mw": 5355.0, "latitude": -7.7184, "longitude": 113.5827, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Paiton Energy Corp", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1026016", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 29141.78, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15762, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Pakerin", "gppd_idnr": "WRI1000965", "capacity_mw": 34.0, "latitude": -2.5213, "longitude": 121.357, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Pakerin (pulp industry)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 185.02, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15763, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Pangkalan Bun", "gppd_idnr": "WRI1000966", "capacity_mw": 14.0, "latitude": -2.6833, "longitude": 111.6167, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Energi Listrik Indonesia (subsidiary of PT. Eksploitasi Energi Indonesia)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1026115", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 76.18, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15764, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Pangkalan Susu 1 & 2", "gppd_idnr": "WRI1000967", "capacity_mw": 400.0, "latitude": 4.1196, "longitude": 98.2555, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN (EPC : PT. Bagus Karya Guangdong Power Engineering PT. Nincec Multi Dimensi)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1079188", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 2176.79, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15765, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Perak", "gppd_idnr": "WRI1000970", "capacity_mw": 100.0, "latitude": -7.2492, "longitude": 112.7508, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 544.19, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15766, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Priok 3 & 4", "gppd_idnr": "WRI1000972", "capacity_mw": 100.0, "latitude": -6.1071, "longitude": 106.8716, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 544.19, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15767, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Rancong", "gppd_idnr": "WRI1000974", "capacity_mw": 30.0, "latitude": -2.5213, "longitude": 121.357, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Jorindo Aceh Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 163.25, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15768, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Sanggau", "gppd_idnr": "WRI1000975", "capacity_mw": 14.0, "latitude": -2.5213, "longitude": 121.357, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": "1102412", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 76.18, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15769, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Simpang Belimbing", "gppd_idnr": "WRI1000978", "capacity_mw": 227.0, "latitude": -3.4, "longitude": 104.1158, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Guo Hua Energy Musi Makmur", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1075907", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1235.32, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15770, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Sulawesi Selatan - Barru/FTP1", "gppd_idnr": "WRI1000979", "capacity_mw": 100.0, "latitude": -4.2931, "longitude": 119.6326, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South&South East Sulawesi Regional Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 544.19, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15771, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Sumbar - Teluk sirih Unit 1", "gppd_idnr": "WRI1000980", "capacity_mw": 112.0, "latitude": -1.0772, "longitude": 100.3727, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN (EPC: CNTIC (China National Tecnical Import Corporation))", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1066878", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 609.5, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15772, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Suparma", "gppd_idnr": "WRI1000981", "capacity_mw": 27.0, "latitude": -2.5213, "longitude": 121.357, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Suparma (pulp industry)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 146.93, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15773, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Suralaya", "gppd_idnr": "WRI1000982", "capacity_mw": 3400.0, "latitude": -5.892, "longitude": 106.03, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN -.PT Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026152", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 18502.72, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15774, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Tabalong", "gppd_idnr": "WRI1000983", "capacity_mw": 60.0, "latitude": -2.5213, "longitude": 121.357, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Makmur Sejahtera Wisesa (owned by PT. Adaro)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 326.51, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15775, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Tambak Lorok", "gppd_idnr": "WRI1000984", "capacity_mw": 300.0, "latitude": -6.9507, "longitude": 110.4304, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN - PT. Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1026156", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1632.59, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15776, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Tanjung Alam Perkasa", "gppd_idnr": "WRI1000985", "capacity_mw": 7.5, "latitude": -2.5213, "longitude": 121.357, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Tanjung Alam Perkasa", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 40.81, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15777, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Tanjung Enim -Bukit Asam", "gppd_idnr": "WRI1000988", "capacity_mw": 260.0, "latitude": -3.7316, "longitude": 103.7975, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South Sumatera Generation Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1076783", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1414.91, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15778, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Tanjung Jati B", "gppd_idnr": "WRI1000990", "capacity_mw": 1320.0, "latitude": -6.446, "longitude": 110.7423, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Central Java Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1052927", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 7183.4, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15779, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Tanjung Jati B - expansion", "gppd_idnr": "WRI1000991", "capacity_mw": 1324.0, "latitude": -6.446, "longitude": 110.7423, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Central Java Power (EPC : Korea Midland Power Co)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "GEODB", "wepp_id": "1052927", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 7205.17, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15780, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Tanjung Kasam", "gppd_idnr": "WRI1000992", "capacity_mw": 110.0, "latitude": 1.0455, "longitude": 104.133, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Tanjung Kasam Power Batam (PT. TJK Power)", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1060288", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 598.61, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15781, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Tarahan # 1 2", "gppd_idnr": "WRI1000994", "capacity_mw": 200.0, "latitude": -5.518, "longitude": 105.35, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "Indonesia Power", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": "1026163", "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1088.39, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15782, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Tarahan 3 & 4 - Sebalang", "gppd_idnr": "WRI1000995", "capacity_mw": 200.0, "latitude": -5.518, "longitude": 105.35, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1088.39, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15783, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Tello", "gppd_idnr": "WRI1000997", "capacity_mw": 25.0, "latitude": -5.14, "longitude": 119.4221, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PLN-South&South East Sulawesi Regional Unit", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "CARMA", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 136.04, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15784, "country": "IDN", "country_long": "Indonesia", "name": "PLTU Tonasa II (Boiler Turbine Generator)", "gppd_idnr": "WRI1000999", "capacity_mw": 70.0, "latitude": -4.7846, "longitude": 119.6163, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": null, "owner": "PT. Semen Gresik Tbk/PT. Semen Indonesia", "source": "Indonesia Power Generation", "url": "https://repit.wordpress.com/", "geolocation_source": "WRI", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 380.93, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15785, "country": "IDN", "country_long": "Indonesia", "name": "Pacitan power station", "gppd_idnr": "WRI1075812", "capacity_mw": 630.0, "latitude": -8.2578, "longitude": 111.3736, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2011.0, "owner": "PT PLN Persero", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3428.44, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15787, "country": "IDN", "country_long": "Indonesia", "name": "Pekanbaru Tenayan power station", "gppd_idnr": "WRI1075813", "capacity_mw": 220.0, "latitude": 0.5644, "longitude": 101.5234, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2016.0, "owner": "PT PLN Persero", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1197.23, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15789, "country": "IDN", "country_long": "Indonesia", "name": "Perawang Mill power station", "gppd_idnr": "WRI1075814", "capacity_mw": 755.0, "latitude": 0.6893, "longitude": 101.6191, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2009.0, "owner": "PT Indah Kiat Pulp & Paper", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 4108.69, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15794, "country": "IDN", "country_long": "Indonesia", "name": "Purwakarta Indorama Power Station", "gppd_idnr": "WRI1075815", "capacity_mw": 60.0, "latitude": -6.5539, "longitude": 107.4137, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2006.0, "owner": "PT Indorama Synthetics Tbk", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 326.51, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15804, "country": "IDN", "country_long": "Indonesia", "name": "Sulawesi Mining power station", "gppd_idnr": "WRI1075816", "capacity_mw": 280.0, "latitude": -2.8274, "longitude": 122.1553, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2016.0, "owner": "Sulawesi Mining Investment", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 1523.75, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"} {"rowid": 15809, "country": "IDN", "country_long": "Indonesia", "name": "Tanjung Awar-Awar power station", "gppd_idnr": "WRI1075817", "capacity_mw": 700.0, "latitude": -6.8105, "longitude": 111.9955, "primary_fuel": "Coal", "other_fuel1": null, "other_fuel2": null, "other_fuel3": null, "commissioning_year": 2012.0, "owner": "PT PLN Persero", "source": "GCPT", "url": "https://endcoal.org/global-coal-plant-tracker/", "geolocation_source": "GCPT", "wepp_id": null, "year_of_capacity_data": null, "generation_gwh_2013": null, "generation_gwh_2014": null, "generation_gwh_2015": null, "generation_gwh_2016": null, "generation_gwh_2017": null, "generation_gwh_2018": null, "generation_gwh_2019": null, "generation_data_source": null, "estimated_generation_gwh_2013": null, "estimated_generation_gwh_2014": null, "estimated_generation_gwh_2015": null, "estimated_generation_gwh_2016": null, "estimated_generation_gwh_2017": 3809.38, "estimated_generation_note_2013": "NO-ESTIMATION", "estimated_generation_note_2014": "NO-ESTIMATION", "estimated_generation_note_2015": "NO-ESTIMATION", "estimated_generation_note_2016": "NO-ESTIMATION", "estimated_generation_note_2017": "CAPACITY-FACTOR-V1"}