global-power-plants
Data license: CC Attribution 4.0 License · Data source: World Resources Institute · About: global-power-plants-datasette
1,295 rows where geolocation_source = "CARMA"
This data as json, CSV (advanced)
owner 388
- Fortum 40
- ENDESA GENERACION S.A. 33
- 100% Statkraft 28
- 100% Vattenfall 13
- IBERDROLA E.RENOV. CASTILLA LA MANCHA 13
- PLN - PT. Indonesia Power 13
- IBERDROLA GENERACION S.A. 12
- GAS NATURAL FENOSA GENERACION S.L.U. 10
- PLN - Java Bali Generation Unit / PT. PJB 9
- CORPORACION ACCIONA HIDRAULICA S.L. 8
- UNION ELECTRICA DE CANARIAS GENERACION S.A.U. 8
- PLN-South Sumatera Generation Unit 7
- CORPORACION ACCIONA EOLICA S.L. 6
- ENERGIAS RENOVABLES MEDITERRANEAS S.A. 6
- GAMESA ENERGIA S.A. 6
- Scottish Power: Hydro schemes - Galloway 6
- Scottish and Southern: Island Generation 6
- PLN-South&South East Sulawesi Regional Unit 5
- Scottish and Southern: Thermal 5
- 90.1% Statkraft 4
- ACCIONA ENERGIA S.A. 4
- COMPANIA EOLICA ARAGONESA S.A. 4
- ENDESA COGENERACION Y RENOVABLES S.A. 4
- ENEL 4
- IBERDROLA E.R. DE ARAGON S.A. 4
- IBERDROLA RENOVABLES ANDALUCIA S.A.U. 4
- IBERDROLA RENOVABLES CASTILLA Y LEON S.A. 4
- PJSC "Quadra - Power Generation" 4
- PLN 4
- PROVENTO RENOVABLES S.A. 4
- SINAE ENERGIA Y MEDIO AMBIENTE S.A. 4
- Water and Power Development Authority (WAPDA) 4
- ACCIONA ENERGIA 3
- ACCIONA EOLICA DE GALICIA S.A. 3
- E.On UK 3
- ENEL GREEN POWER ESPANA S.L. 3
- ENERGIAS EOLICAS EUROPEAS S.A. 3
- Edison 3
- GAS NATURAL FENOSA RENOVABLES S.L.U. 3
- GAS Y ELECTRICIDAD GENERACION S.A.U 3
- IBERDROLA E.R. DE GALICIA S.A 3
- IBERDROLA E.R. DE GALICIA S.A. 3
- IBERENOVA PROMOCIONES S.A. 3
- PARQUE EOLICO ALTOS DEL VOLTOYA S.A. 3
- PARQUE EOLICO SIERRA DEL MADERO S.A. 3
- PARQUES EOLICOS GESTINVER SL 3
- PLN – Indonesia Power 3
- PT. Indonesia Power 3
- RWE INNOGY AERSA S.A.U. 3
- RWE INNOGY AERSA SAU 3
- Scottish and Southern: Hydro Schemes - Affric/Beauly 3
- Scottish and Southern: Hydro Schemes - Breadalbane 3
- Scottish and Southern: Hydro Schemes - Sloy/Awe 3
- Scottish and Southern: Hydro Schemes - Tummel 3
- Trustpower 3
- Uzbekenergo 3
- VIESGO GENERACION S.L. 3
- ACCIONA EOLICA DEL LEVANTE S.L. 2
- AL-ANDALUS WIND POWER S.L. 2
- Anggreko International - rental 2
- BIOVENT ENERGIA S.A. 2
- CORPORACION ACCIONA EOLICA S.L.U 2
- DERNA S.A. 2
- ELECNOR S.A. 2
- ENEL GREEN POWER ESPANA S.L. 2
- ENERGIAS RENOVABLES DEL DUERO S.L. 2
- ENERGIAS AMBIENTALES DE SOMOZAS S.A. 2
- ENERGIAS EOLICAS DE CATALUNYA SA 2
- ENERGIAS RENOVABLES DE LA REGION DE MURCIA 2
- ENERGYWORKS VIT-VALL S.L. 2
- EOLICA DE SANABRIA S.L. 2
- EOLICA EL PEDREGOSO S.L. 2
- EOLICAS DE EUSKADI S.A. 2
- EXPL. EOLICAS SIERRA DE LA VIRGEN SA 2
- GALICIA VENTO S.L. 2
- GAS NATURAL FENOSA RENOVABLES S.L. 2
- Government RPP 2
- HIDROELECTRICA DEL CANTABRICO S.A. 2
- IBERENOVA PROMOCIONES S.A.U. 2
- IBEREOLICA HEDROSO-ACIBEROS 2 S.L.U. 2
- IPP 2
- Israel Electric corporation 2
- JSC "Yenisei TGC (TGC-13)" 2
- LURIA DE ENERGIAS S.A. 2
- MOLINOS DEL EBRO S.A. 2
- NAVARRO GENERACION S.A. 2
- OLIVENTO S.L.S.U. 2
- OLIVENTO S.L.U. 2
- OLIVENTO S.L. 2
- PARQUES EOLICOS DE BUIO S.L. 2
- PARQUES EOLICOS DEL CANTABRICO S.A. 2
- PJSC "TGC-2" 2
- PLN - North Sumatera Generation Unit 2
- PLN / KITSUMBAGUT 2
- PLN-Nth & Ctrl Sulawesi & Gorontalo Reg Unit 2
- PT. Energy Sengkang 2
- PT. Inco 2
- Perm Branch of PJSC "T Plus" 2
- RWE INNOGY AERSA S.A. 2
- Renewable Energy Systems Ltd 2
- Scottish and Southern: Small Hydros 2
- Sverdlovsk Branch of PJSC "T Plus" 2
- VIESGO RENOVABLES SL 2
- 10.6% Statkraft 1
- 50% Vattenfall 1
- 6.6% Statkraft 1
- ACCIONA EOLICA DE CASTILLA-LA MANCHA SL 1
- ACCIONA SALTOS DE AGUA S.L. 1
- AEROGENERADORES DEL SUR S.A. 1
- AGROENERGETICA DE BAENA S.L. 1
- ALDESA EOLICO PALOMAREJO S.A.U 1
- AZULIBER 1 S.L. 1
- Arabian power Company ADWEA IPR TEPCO and Mitsui 1
- BECOSA ENERGIAS RENOVABLES S.A. 1
- BECOSA EOLICO ALIJAR S.A.U. 1
- BIOVENT ENERGIA SA 1
- BOIRO ENERGIA S.A. 1
- BON VENT DE CORBERA S.L.U. 1
- BOREAS EOLICA S.L. 1
- BOREAS EOLICA 2 S.A. 1
- BPPT + Pertamina 1
- BRAS DEL PORT S.A. 1
- Beaufort Wind Ltd 1
- Branch of Mari El and Chuvashia PJSC "T Plus" 1
- CARDENAL BELLUGA S.L. 1
- CASTRIOS S.A. 1
- CIA. EOLICA TIERRAS ALTAS S.A. (CETASA) 1
- CIENER S.A.U. 1
- COGENERACION DEL NOROESTE S.L. 1
- COGENERACION MOTRIL S.A. 1
- COLORTEX S.A. 1
- CONFEDERACION HIDROGRAFICA DEL DUERO 1
- CONFEDERACION HIDROGRAFICA DEL EBRO 1
- CORPORACION EOLICA DE BARRUELO 1
- CORPORACION EOLICA DE ZAMORA S.L. 1
- CORPORACION EOLICA DE ZARAGOZA S.L 1
- CYL ENERGIA EOLICA S.L.U. 1
- Contact Energy 1
- DEPURACION Y COGENERACION INTEGRAL SAL. 1
- DESARROLLO ENERGIAS RENOVABLES LA RIOJA 1
- DESARROLLO EOLICO DEL EBRO S.A. 1
- DESARROLLO Y EXPLOTACIONES AGRARIAS 1
- DESARROLLOS EOLICOS S.A. 1
- DESARROLLOS EOLICOS DE CORME S.A. 1
- DESARROLLOS EOLICOS DE GALICIA S.A 1
- DESARROLLOS EOLICOS DE LUGO S.A.U. 1
- DESARROLLOS EOLICOS DE TARIFA S.A. 1
- DESARROLLOS EOLICOS DUMBRIA S.A.U. 1
- DESARROLLOS EOLICOS MANCHEGOS EL PINAR 1
- DESARROLLOS EOLICOS RABOSERA S.A. 1
- DESIMPACTO DE PURINES GUARDO S.A. 1
- DYTA EOLICA DE CASTILLA LA MANCHA S.A. 1
- Donbascenergo 1
- Drax Power Ltd 1
- E On 1
- ECOCARBURANTES ESPANOLES S.A. 1
- ECOWING ENERGY S.L. 1
- EGCO 1
- ELECDEY CARCELEN S.L. 1
- ELECDEY LEZUZA S.A. 1
- ELECDEY MURCIA S.A. 1
- ELECTRO METALURGICA DEL EBRO S.L. 1
- ENCE ENERGIA HUELVA S.L.U. 1
- ENDESA COG. RENOV.S.A. Y CLP ENVIROGAS 1
- ENEMANSA 1
- ENERGIA HIDROELECTRICA DE NAVARRA S.A. 1
- ENERGIAS EOLICAS DEL PINO S.L. 1
- ENERGIAS ESPECIALES DE PENA ARMADA S.A. 1
- ENERGIAS ESPECIALES DEL ALTO ULLA S.A. 1
- ENERGIAS ESPECIALES DEL BIERZO S.A. 1
- ENERGIAS NATURALES EL NEGREDO S.L. 1
- ENERGIAS NATURALES LA CALZADA S.L.U. 1
- ENERGIAS RENOVABLES MEDITERRANEAS SA 1
- ENERGYWORKS ARANDA S.L. 1
- ENERGYWORKS CARBALLO S.L. 1
- ENERVENT S.A. 1
- ENRON WIND DE ESPANA S.L. 1
- EOLICA CABANILLAS S.A. 1
- EOLICA CAMPOLLANO S.A.U. 1
- EOLICA DE CURISCAO PUMAR S.A.U. 1
- EOLICA DE MEDINACELI S.L. 1
- EOLICA DE RADONA S.L.U. 1
- EOLICA DEL PINO S.L. 1
- EOLICA DEL EBRO S.A. 1
- EOLICA DEL MONCAYO S.L.U. 1
- EOLICA DULCINEA .SL. 1
- EOLICA GUADALTEBA S.L.U. 1
- EOLICA LA BRUJULA S.A. 1
- EOLICA MONTES DEL CIERZO S.L. 1
- EOLICA MONTESINOS S.L. 1
- EOLICAS COMUNIDAD VALENCIANA S.A. 1
- EOLICAS COMUNIDAD VALENCIANA S.A(ECOVASA 1
- EOLICAS PARAMO DE POZA S.A. 1
- EOS PAX II A S.L. 1
- ESBPG 1
- EVOLUCION 2000 S.A. 1
- EVOLUCION 2000 S.L. 1
- EXPLOTACIONES EOLICAS SIERRA COSTERA SA 1
- EXPLOTACIONES EOLICAS SIERRA DE ALCARAZ S.L. 1
- EXPLOTACIONES EOLICAS SIERRA DE UTRERA 1
- FERTIMOLINA S.A. 1
- FORESTAL DEL ATLANTICO S.A. 1
- GAMESA ENERGIA S.A. Y EOLICA NAVARRA 1
- GAS NATURAL FENOSA RENOVABLES SLU 1
- GDF Suez 1
- GENERAL EOLICA ARAGONESA S.A. 1
- GENSABON S.A. 1
- GEOLICA MAGALLON S.L. 1
- GRUPO EMPRESARIAL ENCE S.A. 1
- GUASCOR INVESTIGACION Y DESARROLLO 1
- Genesis Energy 1
- Grupo Industriale Maccaferri 1
- HIDROELECTRICA DEL GIESTA SRL 1
- HORTA MEDIO AMBIENTE S.A. 1
- IBERDROLA DIVERSIFICACION S.A. 1
- IBERDROLA E.R. CASTILLA LA MANCHA S.A 1
- IBERDROLA E.R. CASTILLA LA MANCHA S.A.U 1
- IBERDROLA E.R. CASTILLA LA MANCHA SA 1
- IBERDROLA E.R. DE CASTILLA LA MANCHA SA 1
- IBERDROLA E.R.CASTILLA LA MANCHA S.A. 1
- IBERDROLA E.REN.CASTILLA LA MANCHA SA 1
- IBERDROLA ENERGIAS RENOVABLES S.A. 1
- IBERDROLA ENERGIAS RENOVABLES S.A.U. 1
- IBERDROLA RENOVABLES ANDALUCIA S.A.U 1
- IBERDROLA RENOVABLES CASTILLA Y LEON SA 1
- IBERDROLA RENOVABLES DE ANDALUCIA. S.A.U. 1
- IBERDROLA RENOVABLES DE ANDLAUCIA.S.AU. 1
- IBERDROLA RENOVABLES ENERGIA S.A. 1
- IBERDROLA RENOVABLES GALICIA S.A.U. 1
- IBERENOVA PROMOCIONES S.A. SOCIEDAD UNIPERSONAL 1
- IBEREOLICA HEDROSO-ACIBEROS S.A. 1
- IBEREOLICA LUBIAN S.A. 1
- IBEREOLICA PADORNELO S.A. 1
- INDONESIA POWER UNIT 1
- INDUSTRIAS LACTEAS ASTURIANAS S.A. 1
- INGENIERIA Y PROMOCIONES EOLICAS S.L. 1
- INICIATIVAS EOLICAS DE ALPERA S.L. 1
- INTEVER S.A. 1
- Infinis 1
- Iraq's Ministry of Electricity 1
- Italy Ministry of Economy and Finance 1
- JSC "Chukotenergo" 1
- JSC INTER RAO-Electric Power Generation 1
- JSC Samruk Energy 1
- Korea Hydro and Nuclear 1
- Kuzbassenergo 1
- LDV CORTIJO DE GUERRA S.L. 1
- MOLINOS DE LA RIOJA S.A. 1
- MOLINOS DEL CIDACOS S.A. 1
- MPF Operations Limited 1
- Magnox Ltd 1
- N.E.G. MICON 1
- NEO SC EL GRADO SLU 1
- NEOELECTRA SC ECONERGIA NAVARRA S.L. 1
- NEOELECTRA SC FUENTE DE PIEDRA GESTION S.L.U. 1
- NORVENTO MONTOUTO S.L. 1
- NUFRI SAT 1596 1
- OJSC "Mobile power engineering" 1
- OJSC "Sverdlovsk Energy and Gas Company" (JSC "SEGK") 1
- OLEXTRA S.A. 1
- OLIVENTO S.L. 1
- OLIVENTO S.L.U 1
- OLIVENTO S.L.U (ANTES S.E.VILLARRUBIA) 1
- OLIVENTO S.L.U (ANTS.E.SIERRA DEL TRIGO 1
- OLIVENTO S.L.U.(ANT TIT S.E.OPINEN) 1
- Owner / Investor 1
- P. E. DE MALPICA SA(PEMALSA 1
- P.E. DE A RUNA S.L (ANTERIOR EUROVENTO) 1
- P.E. VIRXE DO MONTE S.L (ANT EUROVENTO) 1
- P.G.P. DE ENERGIA S.A. 1
- PALENCIA ENERGIA EOLICA A.I.E. 1
- PARC EOLIC DE TORTOSA S.L. 1
- PARC EOLIC MUDEFER SL 1
- PARQUE EOLICO DE TEA S.L. (ANEUROVENTO) 1
- PARQUE EOLICO HINOJAL S.L. 1
- PARQUE EOLICO LA CARRACHA S.L. 1
- PARQUE EOLICO LA PENUCA S.L. 1
- PARQUE EOLICO PLANA DE JARRETA S.L. 1
- PARQUE EOLICO ALTO DEL COTEREJON S.L. 1
- PARQUE EOLICO ARAGON A.I.E. 1
- PARQUE EOLICO BELCHITE S.L. 1
- PARQUE EOLICO CINSEIRO S.L. 1
- PARQUE EOLICO DE ADRANO S.L. 1
- PARQUE EOLICO DE BARBANZA S.A. 1
- PARQUE EOLICO EL HINOJAL S.L. 1
- PARQUE EOLICO EL MORAL S.L. 1
- PARQUE EOLICO EL ROBLECILLO S.L. 1
- PARQUE EOLICO LA BOBIA - SAN ISIDRO S.L 1
- PARQUE EOLICO LA BOGA S.L. 1
- PARQUE EOLICO LOS CANTALES S.L. 1
- PARQUE EOLICO NEREA S.L. 1
- PARQUE EOLICO PUERTO REAL I S.L.U. 1
- PARQUE EOLICO SANTA QUITERIA S.L. 1
- PARQUE EOLICO SIERRA DEL MADERO SA. 1
- PARQUES EOLICOS ALENTISQUE S.L. 1
- PARQUES EOLICOS SAN LORENZO S.L.U 1
- PJSC "IRKUTSKENERGO" 1
- PLN - East Kalimantan Regional Unit 1
- PLN - East Nusa Tenggara Regional Unit/NTT 1
- PLN - Maluku Regional Unit 1
- PLN - Pandan Sector 1
- PLN - Rental 1
- PLN - West Nusa Tenggara Regional Unit/NTB 1
- PLN - rental 1
- PLN – sewa 1
- PLT – rented from PT. Krista Inti Persada 1
- PRENEAL S.A. 1
- PROCESOS ECOLOGICOS CARMONA 1 S.A. 1
- PROCESOS ECOLOGICOS VILCHES S.A. 1
- PRODUCTOR REGIONAL DE ENERGIA RENOVABLE SA 1
- PRODUCTOR REGIONAL DE ENERGIAS RENOVABLES III S.A 1
- PROYECTOS DE COGENERACION S.L. 1
- PROYECTOS EOLICOS ARAGONESES S.L. 1
- PT Asta Keramasan Energy (AKE) 1
- PT. Bekasi Power/PT. Kawasan Industri Jababeka Tbk 1
- PT. Cahaya Fajar Kaltim 1
- PT. Cahaya Sakti 1
- PT. Cikarang Listrindo 1
- PT. Cogindo DayaBersama - rental 1
- PT. Energi Listrik Indonesia (subsidiary of PT. Eksploitasi Energi Indonesia) 1
- PT. Geo Dipa Energy 1
- PT. Hendratna Plywood 1
- PT. Indonesia Power & electrindo Perkasa Utama 1
- PT. Jorindo Aceh Power 1
- PT. Listrindo (IPP) 1
- PT. Makasar Power (Alsons Power Holdings Corp + Toyota Tsusho Corp/Tomen + Singapore Power) 1
- PT. Makmur Sejahtera Wisesa (owned by PT. Adaro) 1
- PT. Pakerin (pulp industry) 1
- PT. Pertamina Geothermal Energy 1
- PT. Pusaka Jaya Palu Power 1
- PT. Suparma (pulp industry) 1
- PT. Tanjung Alam Perkasa 1
- PT. Tanjung Jabung Power 1
- PURINARSA S.L. 1
- Pamir Energy (PPP set up by AKFED and IFC) 1
- REPSOL PETROLEO S.A. 1
- ROFEICA ENERGIA S.A. 1
- RWE Npower Plc 1
- Rosatom 1
- SALTOS DE DOMENO S.A. 1
- SALTOS DEL NANSA I S.A. UNIPERSONAL 1
- SALTOS Y CENTRALES DE CATALUNYA S.A. 1
- SAN JUAN DE BARGAS EOLICA S.L. 1
- SAT NUM.1596 NUFRI 1
- SDAD DE GESTION DE RECURCOS ENERGETICOS 1
- SIERRA DE BANOS S.L. 1
- SIERRA DE SELVA S.A. 1
- SIERRA DE SELVA S.L. 1
- SISTEMAS ENERGETICOS DEL GRANADO S.A. 1
- SISTEMAS ENERGETICOS CHANDREXA S.A. 1
- SISTEMAS ENERGETICOS DE LA HIGUERA S.A.U. 1
- SISTEMAS ENERGETICOS DEL MONCAYO S.A. 1
- SISTEMAS ENERGETICOS LA LINERA S.A.U. 1
- SISTEMAS ENERGETICOS LA TORRECILLA S.A.U. 1
- SISTEMAS ENERGETICOS NACIMIENTO S.A. 1
- SISTEMAS ENERGETICOS VALLE DE SEDANO S.A.U. 1
- SISTEMAS ENERGETICOS VALLE DE SEDANO SA 1
- SNIACE S.A. 1
- SOCIEDAD EOLICA LOS LANCES 1
- SOLWINDET EL CONJURO S.L. 1
- Samara branch of PJSC "T Plus" 1
- Saratov Branch of PJSC "T Plus" 1
- Scottish Power: Hydro schemes - Lanark 1
- Scottish Power: Thermal 1
- Scottish and Southern: Hydro Schemes - Conon 1
- Scottish and Southern: Hydro Schemes - Great Glen 1
- Scottish and Southern: Hydro Schemes - Shin 1
- Statkraft Wind UK Ltd 1
- TEBAR EOLICA S.A. 1
- TGC-2 1
- TIERRA ATOMIZADA S.A. 1
- TIOXIDE EUROPE S.L. 1
- TIRME S.A 1
- TORRASPAPEL S.A 1
- TORTOSA ENERGIA SA 1
- Tamarete Energia 1
- UNELCO 1
- UNIWINDET PARQUE EOLICO LAS LOMILLAS S.L. 1
- URBAENERGIA S.A 1
- Uniper UK Limited 1
- VALORITZACIONS AGRORAMADERES LES GARRIGUES S.L. 1
- VAPOR Y ELECTRICIDAD EL TEJAR S.L. 1
- VIESGO RENOVABLES S.L.U 1
- VIRANDEL S.L 1
- VPI Immingham LLP 1
- WINDSOLAR A.G. 1
- bright PLN Batam 1
- t+group 1
country_long 28
- Spain 449
- Switzerland 132
- Indonesia 88
- Sweden 88
- United Kingdom 50
- Italy 43
- Netherlands 31
- Russia 25
- Iran 22
- Philippines 19
- Venezuela 16
- Taiwan 13
- Pakistan 8
- Thailand 6
- New Zealand 5
- Malaysia 4
- Uzbekistan 3
- Israel 2
- North Korea 2
- Iraq 1
- Ireland 1
- Kazakhstan 1
- Kuwait 1
- Romania 1
- South Korea 1
- Tajikistan 1
- Ukraine 1
- United Arab Emirates 1
primary_fuel 11
Link | rowid ▼ | country | country_long | name | gppd_idnr | capacity_mw | latitude | longitude | primary_fuel | other_fuel1 | other_fuel2 | other_fuel3 | commissioning_year | owner | source | url | geolocation_source | wepp_id | year_of_capacity_data | generation_gwh_2013 | generation_gwh_2014 | generation_gwh_2015 | generation_gwh_2016 | generation_gwh_2017 | generation_gwh_2018 | generation_gwh_2019 | generation_data_source | estimated_generation_gwh_2013 | estimated_generation_gwh_2014 | estimated_generation_gwh_2015 | estimated_generation_gwh_2016 | estimated_generation_gwh_2017 | estimated_generation_note_2013 | estimated_generation_note_2014 | estimated_generation_note_2015 | estimated_generation_note_2016 | estimated_generation_note_2017 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
15643 | 15643 | IDN | Indonesia | Ampenan | WRI1000736 | 56.284 | -8.5667 | 116.0667 | Oil | PLN - West Nusa Tenggara Regional Unit/NTB | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026032 | 101.59 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15646 | 15646 | IDN | Indonesia | Bakaru | WRI1000738 | 126.0 | -3.1141 | 119.6042 | Hydro | PLN-South&South East Sulawesi Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026035 | 423.6 | 334.58 | 350.67 | 415.34 | 424.69 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15647 | 15647 | IDN | Indonesia | Balambano | WRI1000739 | 130.0 | -2.5213 | 121.357 | Hydro | PT. Inco | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1025948 | 338.09 | 252.07 | 306.96 | 344.3 | 354.37 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15650 | 15650 | IDN | Indonesia | Bengkok+Dago/saguling | WRI1000743 | 3.85 | -6.6247 | 107.5564 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 13.0 | 10.85 | 13.53 | 13.6 | 13.49 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | ||||||||||||||
15653 | 15653 | IDN | Indonesia | Bitung - Menado | WRI1000746 | 56.62 | 1.4451 | 125.1824 | Oil | PLN-Nth & Ctrl Sulawesi & Gorontalo Reg Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 102.2 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15655 | 15655 | IDN | Indonesia | Cikalong/saguling | WRI1000747 | 19.2 | -6.9039 | 107.6186 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026135 | 70.7 | 65.53 | 63.95 | 76.04 | 65.27 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15661 | 15661 | IDN | Indonesia | Dieng | WRI1000752 | 60.0 | -7.2061 | 109.9119 | Geothermal | PT. Geo Dipa Energy | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1018473 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15662 | 15662 | IDN | Indonesia | Giringan - Pamekasan | WRI1000755 | 3.2 | -7.7201 | 111.6715 | Hydro | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026067 | 6.65 | 6.55 | 7.17 | 7.1 | 7.08 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15663 | 15663 | IDN | Indonesia | Golang - Pamekasan | WRI1000756 | 2.7 | -8.1408 | 111.1317 | Hydro | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026068 | 9.34 | 6.6 | 8.09 | 9.68 | 9.64 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15669 | 15669 | IDN | Indonesia | Kamojang 1 2 3 | WRI1000764 | 140.0 | -6.4239 | 107.4553 | Geothermal | PLN – Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026079 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15670 | 15670 | IDN | Indonesia | Kamojang 4 | WRI1000765 | 60.0 | -6.4239 | 107.4553 | Geothermal | PT. Pertamina Geothermal Energy | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026079 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15671 | 15671 | IDN | Indonesia | Kayu Merah - Ternate | WRI1000769 | 21.084 | 0.8 | 127.4 | Oil | PLN - Maluku Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1093482 | 38.05 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15673 | 15673 | IDN | Indonesia | Kendari - Rental | WRI1000771 | 36.3 | 1.0591 | 120.798 | Oil | PLN - Rental | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026082 | 65.52 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15675 | 15675 | IDN | Indonesia | Ketenger / mrica | WRI1000772 | 8.04 | -7.5097 | 109.2778 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1050220 | 33.59 | 25.5 | 29.83 | 35.02 | 32.34 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15676 | 15676 | IDN | Indonesia | Klambu/Mrica | WRI1000773 | 1.117 | -7.0069 | 110.7964 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 3.78 | 3.34 | 3.9 | 3.88 | 3.58 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | ||||||||||||||
15678 | 15678 | IDN | Indonesia | Kracak/saguling | WRI1000776 | 18.9 | -6.9039 | 107.6186 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026135 | 69.59 | 64.51 | 62.95 | 74.85 | 64.25 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15679 | 15679 | IDN | Indonesia | Lahendong (Binary Cycle) | WRI1000777 | 20.0 | 1.3346 | 124.8392 | Geothermal | BPPT + Pertamina | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026087 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15681 | 15681 | IDN | Indonesia | Lamajan/saguling | WRI1000779 | 19.56 | -6.9039 | 107.6186 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026135 | 72.02 | 65.75 | 64.14 | 77.47 | 66.5 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15683 | 15683 | IDN | Indonesia | Larona | WRI1000780 | 165.0 | -2.8194 | 121.5783 | Hydro | PT. Inco | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1025949 | 487.39 | 423.65 | 445.46 | 510.49 | 460.54 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15684 | 15684 | IDN | Indonesia | Lau Renun | WRI1000781 | 82.0 | 3.0824 | 98.065 | Hydro | PLN - Pandan Sector | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026134 | 281.58 | 231.76 | 248.79 | 271.47 | 271.06 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15685 | 15685 | IDN | Indonesia | Lodoyo - Brantas | WRI1000783 | 4.5 | -8.1613 | 112.2173 | Hydro | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026092 | 17.16 | 12.97 | 15.44 | 18.26 | 17.08 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15686 | 15686 | IDN | Indonesia | Maninjau III | WRI1000785 | 123.0 | -0.2923 | 100.152 | Hydro | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026095 | 319.89 | 238.5 | 290.43 | 325.76 | 335.29 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15688 | 15688 | IDN | Indonesia | Mendalan - Brantas | WRI1000788 | 23.0 | -7.854 | 112.3316 | Hydro | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026099 | 89.18 | 64.91 | 69.64 | 87.87 | 83.64 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15690 | 15690 | IDN | Indonesia | Minahasa - rental | WRI1000791 | 35.0 | -1.4789 | 122.3858 | Oil | PLN - rental | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026100 | 63.17 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15692 | 15692 | IDN | Indonesia | Ngebel - Pamekasan | WRI1000793 | 2.2 | -7.7891 | 111.6167 | Hydro | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026106 | 7.89 | 7.12 | 8.26 | 8.38 | 7.91 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15695 | 15695 | IDN | Indonesia | PLTG (ex PLTD Sunyaragi) | WRI1000809 | 18.0 | -7.4064 | 109.5842 | Gas | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026057 | 75.0 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15696 | 15696 | IDN | Indonesia | PLTG Belawan | WRI1000817 | 260.0 | 3.5833 | 98.6667 | Gas | PLN / KITSUMBAGUT | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026045 | 1083.34 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15697 | 15697 | IDN | Indonesia | PLTG Belawan TTF | WRI1000818 | 105.0 | 3.5833 | 98.6667 | Gas | PLN / KITSUMBAGUT | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026045 | 437.5 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15698 | 15698 | IDN | Indonesia | PLTG Cikarang Listrindo | WRI1000821 | 150.0 | -6.1133 | 106.7788 | Gas | PT. Cikarang Listrindo | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 625.0 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15699 | 15699 | IDN | Indonesia | PLTG Cilacap | WRI1000822 | 55.0 | -7.7264 | 109.0094 | Gas | PLN – Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 229.17 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15700 | 15700 | IDN | Indonesia | PLTG Duri ex PLTG Sunyaragi Cent Java | WRI1000824 | 20.0 | -7.4064 | 109.5842 | Gas | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026057 | 83.33 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15701 | 15701 | IDN | Indonesia | PLTG Gilimanuk | WRI1000825 | 133.0 | -8.1716 | 114.4344 | Gas | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1050217 | 554.17 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15704 | 15704 | IDN | Indonesia | PLTG Keramasan | WRI1000833 | 145.0 | -2.9167 | 104.7458 | Gas | PT Asta Keramasan Energy (AKE) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026111 | 604.17 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15705 | 15705 | IDN | Indonesia | PLTG Keramasan #1 2 3 4 | WRI1000834 | 65.0 | -2.9167 | 104.7458 | Gas | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026111 | 270.83 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15709 | 15709 | IDN | Indonesia | PLTG Pemaron | WRI1000844 | 97.0 | -8.1189 | 115.0887 | Gas | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1054581 | 404.17 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15710 | 15710 | IDN | Indonesia | PLTG Pesanggaran | WRI1000845 | 122.0 | -8.7157 | 115.214 | Gas | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026037 | 508.34 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15712 | 15712 | IDN | Indonesia | PLTG Sengkang/Wajo | WRI1000849 | 180.0 | -5.14 | 119.4221 | Gas | PT. Energy Sengkang | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1025923 | 750.01 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15713 | 15713 | IDN | Indonesia | PLTG Sunyaragi 1 2 3 4 | WRI1000855 | 80.0 | -7.4064 | 109.5842 | Gas | PLN – Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026057 | 333.33 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15714 | 15714 | IDN | Indonesia | PLTG Tarakan | WRI1000858 | 23.0 | 3.3 | 117.6333 | Gas | PT. Cahaya Sakti | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1064213 | 95.83 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15715 | 15715 | IDN | Indonesia | PLTG Tello | WRI1000859 | 123.0 | -5.14 | 119.4221 | Gas | PLN-South&South East Sulawesi Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026174 | 512.5 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15716 | 15716 | IDN | Indonesia | PLTGB Singkawang | WRI1000867 | 9.0 | 0.9 | 109.0 | Gas | PLT – rented from PT. Krista Inti Persada | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1041391 | 37.5 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15717 | 15717 | IDN | Indonesia | PLTGB Tanjung Batu | WRI1000868 | 2.0 | -0.5 | 117.15 | Gas | PLN – sewa | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1050072 | 8.33 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15718 | 15718 | IDN | Indonesia | PLTGU Bekasi Power | WRI1000870 | 130.0 | -6.2611 | 107.1528 | Gas | PT. Bekasi Power/PT. Kawasan Industri Jababeka Tbk | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1075035 | 541.67 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15730 | 15730 | IDN | Indonesia | PLTGU Sengkang/Wajo | WRI1000886 | 135.0 | -5.14 | 119.4221 | Gas | PT. Energy Sengkang | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1025923 | 562.5 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15732 | 15732 | IDN | Indonesia | PLTMG Panaran | WRI1000894 | 24.0 | 0.1807 | 101.8444 | Gas | bright PLN Batam | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1060287 | 100.0 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15733 | 15733 | IDN | Indonesia | PLTMG Pulau Bunyu | WRI1000898 | 2.0 | 3.5 | 117.8333 | Gas | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 8.33 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15734 | 15734 | IDN | Indonesia | PLTMG Tj. Jabung | WRI1000904 | 8.0 | -1.0167 | 104.3667 | Gas | PT. Tanjung Jabung Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 33.33 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15735 | 15735 | IDN | Indonesia | PLTU - Palu - Mpanau - Tawaeli | WRI1000906 | 30.0 | -0.8917 | 119.8707 | Coal | PT. Pusaka Jaya Palu Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 163.25 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15742 | 15742 | IDN | Indonesia | PLTU Bilibili | WRI1000918 | 2.0 | -2.5213 | 121.357 | Coal | PLN-South&South East Sulawesi Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 10.88 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15746 | 15746 | IDN | Indonesia | PLTU Embalut - Tanjung Batu | WRI1000925 | 50.0 | -0.5 | 117.15 | Coal | PT. Cahaya Fajar Kaltim | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1058260 | 272.09 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15748 | 15748 | IDN | Indonesia | PLTU Hendratna | WRI1000932 | 5.0 | -2.5213 | 121.357 | Coal | PT. Hendratna Plywood | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 27.2 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15752 | 15752 | IDN | Indonesia | PLTU Kaur | WRI1000943 | 200.0 | -2.5213 | 121.357 | Coal | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1088.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15753 | 15753 | IDN | Indonesia | PLTU Keramasan | WRI1000945 | 25.0 | -2.5213 | 121.357 | Coal | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026111 | 136.04 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15754 | 15754 | IDN | Indonesia | PLTU Kupang | WRI1000947 | 30.0 | -2.5213 | 121.357 | Coal | PT. Indonesia Power & electrindo Perkasa Utama | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026086 | 163.25 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15755 | 15755 | IDN | Indonesia | PLTU Labuhan Angin | WRI1000948 | 230.0 | 1.7176 | 98.7265 | Coal | PLN - North Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1066585 | 1251.65 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15756 | 15756 | IDN | Indonesia | PLTU Lati | WRI1000949 | 14.0 | -2.5213 | 121.357 | Coal | PLN - East Kalimantan Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1088444 | 76.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15757 | 15757 | IDN | Indonesia | PLTU Listrindo | WRI1000950 | 2.5 | -2.5213 | 121.357 | Coal | PT. Listrindo (IPP) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 13.6 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15762 | 15762 | IDN | Indonesia | PLTU Pakerin | WRI1000965 | 34.0 | -2.5213 | 121.357 | Coal | PT. Pakerin (pulp industry) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 185.02 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15763 | 15763 | IDN | Indonesia | PLTU Pangkalan Bun | WRI1000966 | 14.0 | -2.6833 | 111.6167 | Coal | PT. Energi Listrik Indonesia (subsidiary of PT. Eksploitasi Energi Indonesia) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026115 | 76.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15765 | 15765 | IDN | Indonesia | PLTU Perak | WRI1000970 | 100.0 | -7.2492 | 112.7508 | Coal | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 544.19 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15767 | 15767 | IDN | Indonesia | PLTU Rancong | WRI1000974 | 30.0 | -2.5213 | 121.357 | Coal | PT. Jorindo Aceh Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 163.25 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15768 | 15768 | IDN | Indonesia | PLTU Sanggau | WRI1000975 | 14.0 | -2.5213 | 121.357 | Coal | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1102412 | 76.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15772 | 15772 | IDN | Indonesia | PLTU Suparma | WRI1000981 | 27.0 | -2.5213 | 121.357 | Coal | PT. Suparma (pulp industry) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 146.93 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15774 | 15774 | IDN | Indonesia | PLTU Tabalong | WRI1000983 | 60.0 | -2.5213 | 121.357 | Coal | PT. Makmur Sejahtera Wisesa (owned by PT. Adaro) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 326.51 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15776 | 15776 | IDN | Indonesia | PLTU Tanjung Alam Perkasa | WRI1000985 | 7.5 | -2.5213 | 121.357 | Coal | PT. Tanjung Alam Perkasa | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 40.81 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15783 | 15783 | IDN | Indonesia | PLTU Tello | WRI1000997 | 25.0 | -5.14 | 119.4221 | Coal | PLN-South&South East Sulawesi Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 136.04 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15786 | 15786 | IDN | Indonesia | Pejengkolan/Mrica | WRI1000801 | 1.4 | -7.5694 | 109.8006 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026121 | 2.83 | 2.23 | 2.96 | 3.02 | 3.01 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15788 | 15788 | IDN | Indonesia | Pemaron BOO | WRI1000802 | 45.0 | -8.1189 | 115.0887 | Oil | PT. Cogindo DayaBersama - rental | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1054581 | 81.23 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15790 | 15790 | IDN | Indonesia | Pesanggaran | WRI1000803 | 75.78 | -8.7157 | 115.214 | Oil | INDONESIA POWER UNIT | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026037 | 136.79 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15791 | 15791 | IDN | Indonesia | Pesanggaran BOO | WRI1000804 | 75.0 | -8.7157 | 115.214 | Oil | Anggreko International - rental | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026037 | 135.38 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15792 | 15792 | IDN | Indonesia | Pesanggaran BOT | WRI1000805 | 51.0 | -8.7157 | 115.214 | Oil | Anggreko International - rental | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026037 | 92.06 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15793 | 15793 | IDN | Indonesia | Plengan/Saguling | WRI1000806 | 6.87 | -6.9039 | 107.6186 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 24.7 | 24.04 | 23.47 | 26.71 | 23.28 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | ||||||||||||||
15797 | 15797 | IDN | Indonesia | Sempor/Mrica | WRI1001009 | 1.0 | -7.4733 | 109.3331 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1050218 | 3.35 | 3.45 | 3.96 | 3.31 | 3.53 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15798 | 15798 | IDN | Indonesia | Sengguruh - Brantas | WRI1001010 | 29.0 | -8.1764 | 112.551 | Hydro | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026143 | 99.96 | 68.14 | 80.5 | 104.17 | 99.98 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15799 | 15799 | IDN | Indonesia | Sidorejo/Mrica | WRI1001013 | 1.4 | -7.4764 | 110.2622 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1050222 | 3.78 | 3.83 | 4.47 | 3.98 | 4.23 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15801 | 15801 | IDN | Indonesia | Silae | WRI1001015 | 43.7 | -0.8917 | 119.8707 | Oil | PLN-Nth & Ctrl Sulawesi & Gorontalo Reg Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026112 | 78.88 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15802 | 15802 | IDN | Indonesia | Singkarak | WRI1001017 | 175.0 | -0.6909 | 100.6034 | Hydro | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026146 | 551.31 | 462.3 | 484.64 | 533.52 | 559.21 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15803 | 15803 | IDN | Indonesia | Sipansihaporas | WRI1001018 | 50.0 | 1.7427 | 98.7792 | Hydro | PLN - North Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1055420 | 160.65 | 122.7 | 148.67 | 163.59 | 167.37 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15805 | 15805 | IDN | Indonesia | Suppa - Pare pare | WRI1001020 | 60.0 | -4.0135 | 119.6255 | Oil | PT. Makasar Power (Alsons Power Holdings Corp + Toyota Tsusho Corp/Tomen + Singapore Power) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026118 | 108.3 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15807 | 15807 | IDN | Indonesia | Talang Padang | WRI1001023 | 12.5 | -0.9492 | 100.3543 | Oil | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1093596 | 22.56 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15810 | 15810 | IDN | Indonesia | Tegineneng | WRI1001028 | 28.2 | -5.6015 | 104.7988 | Oil | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026165 | 50.9 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15811 | 15811 | IDN | Indonesia | Tello | WRI1001031 | 50.092 | -5.14 | 119.4221 | Oil | PLN-South&South East Sulawesi Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026174 | 90.42 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15812 | 15812 | IDN | Indonesia | Tenau Kupang | WRI1001033 | 34.73 | -10.1667 | 123.5833 | Oil | PLN - East Nusa Tenggara Regional Unit/NTT | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026086 | 62.69 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15813 | 15813 | IDN | Indonesia | Timo / Mrica | WRI1001035 | 12.0 | -6.9485 | 110.4069 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026168 | 36.17 | 27.97 | 34.2 | 37.89 | 37.79 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15814 | 15814 | IDN | Indonesia | Tulungagung - Brantas | WRI1001038 | 36.0 | -8.0657 | 111.9025 | Hydro | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026172 | 125.46 | 98.39 | 106.37 | 124.04 | 132.82 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15815 | 15815 | IDN | Indonesia | Ubrug/saguling | WRI1001039 | 18.36 | -6.9039 | 107.6186 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 67.6 | 62.66 | 61.15 | 72.72 | 62.42 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | ||||||||||||||
15818 | 15818 | IDN | Indonesia | Wlingi - Brantas | WRI1001045 | 54.0 | -8.0776 | 112.3311 | Hydro | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026178 | 158.18 | 138.62 | 149.71 | 161.31 | 165.44 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15819 | 15819 | IDN | Indonesia | Wonorejo - Pamekasan | WRI1001046 | 6.3 | -8.1136 | 112.2869 | Hydro | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1055424 | 24.89 | 17.37 | 21.45 | 26.43 | 24.77 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15836 | 15836 | IRN | Iran | Chahbahar (Kenarak) | WRI1008126 | 64.0 | 25.2919 | 60.643 | Oil | 1978.0 | TAVANIR | http://www2.tavanir.org.ir/info/stat87/sanatlhtml/Links/j14%20-1/main.htm | CARMA | 1031063 | 176.41 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15839 | 15839 | IRN | Iran | Dorood Zan Dam | WRI1008130 | 10.0 | 27.0517 | 53.6208 | Hydro | 1989.0 | TAVANIR | http://www2.tavanir.org.ir/info/stat87/sanatlhtml/Links/j14%20-1/main.htm | CARMA | 18.41 | 18.33 | 18.41 | 19.57 | 19.77 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | ||||||||||||||
15841 | 15841 | IRN | Iran | Farg Darab | WRI1008133 | 4.0 | 28.7519 | 54.5444 | Oil | 2002.0 | TAVANIR | http://www2.tavanir.org.ir/info/stat87/sanatlhtml/Links/j14%20-1/main.htm | CARMA | 1064955 | 11.02 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15847 | 15847 | IRN | Iran | Ghaen | WRI1008137 | 73.5 | 28.2013 | 58.4917 | Oil | TAVANIR | http://www2.tavanir.org.ir/info/stat87/sanatlhtml/Links/j14%20-1/main.htm | CARMA | 1031071 | 202.6 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15854 | 15854 | IRN | Iran | Jiroft | WRI1008145 | 32.0 | 28.678 | 57.7406 | Hydro | 1977.0 | TAVANIR | http://www2.tavanir.org.ir/info/stat87/sanatlhtml/Links/j14%20-1/main.htm | CARMA | 1045228 | 45.95 | 43.57 | 46.99 | 70.35 | 51.22 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15857 | 15857 | IRN | Iran | Kangan | WRI1008149 | 164.0 | 28.8012 | 53.7733 | Gas | 1995.0 | TAVANIR | http://www2.tavanir.org.ir/info/stat87/sanatlhtml/Links/j14%20-1/main.htm | CARMA | 1031094 | 871.1 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15868 | 15868 | IRN | Iran | Kish | WRI1008156 | 159.0 | 26.5578 | 54.0194 | Gas | TAVANIR | http://www2.tavanir.org.ir/info/stat87/sanatlhtml/Links/j14%20-1/main.htm | CARMA | 1020919 | 844.54 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15871 | 15871 | IRN | Iran | Lousan (Shahid Beheshti) | WRI1008159 | 120.0 | 36.6206 | 49.5107 | Gas | 1977.0 | TAVANIR | http://www2.tavanir.org.ir/info/stat87/sanatlhtml/Links/j14%20-1/main.htm | CARMA | 1031089 | 637.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15873 | 15873 | IRN | Iran | Maroun | WRI1008161 | 75.0 | 30.5959 | 50.2417 | Hydro | 2004.0 | TAVANIR | http://www2.tavanir.org.ir/info/stat87/sanatlhtml/Links/j14%20-1/main.htm | CARMA | 1045389 | 139.26 | 84.82 | 139.26 | 150.17 | 100.93 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15876 | 15876 | IRN | Iran | Mess Sarcheshmeh | WRI1008164 | 154.0 | 29.2488 | 57.218 | Gas | 1977.0 | TAVANIR | http://www2.tavanir.org.ir/info/stat87/sanatlhtml/Links/j14%20-1/main.htm | CARMA | 1028087 | 817.99 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15888 | 15888 | IRN | Iran | Sabalan | WRI1008177 | 696.0 | 37.2928 | 48.3658 | Gas | TAVANIR | http://www2.tavanir.org.ir/info/stat87/sanatlhtml/Links/j14%20-1/main.htm | CARMA | 1010302 | 3696.89 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15892 | 15892 | IRN | Iran | Sefid Rood | WRI1008181 | 87.0 | 36.7434 | 49.4022 | Hydro | 1964.0 | TAVANIR | http://www2.tavanir.org.ir/info/stat87/sanatlhtml/Links/j14%20-1/main.htm | CARMA | 123.76 | 129.84 | 126.68 | 136.2 | 141.74 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 |
Advanced export
JSON shape: default, array, newline-delimited
CREATE TABLE "global-power-plants" ( "country" TEXT, "country_long" TEXT, "name" TEXT, "gppd_idnr" TEXT, "capacity_mw" REAL, "latitude" REAL, "longitude" REAL, "primary_fuel" TEXT, "other_fuel1" TEXT, "other_fuel2" TEXT, "other_fuel3" TEXT, "commissioning_year" REAL, "owner" TEXT, "source" TEXT, "url" TEXT, "geolocation_source" TEXT, "wepp_id" TEXT, "year_of_capacity_data" INTEGER, "generation_gwh_2013" REAL, "generation_gwh_2014" REAL, "generation_gwh_2015" REAL, "generation_gwh_2016" REAL, "generation_gwh_2017" REAL, "generation_gwh_2018" REAL, "generation_gwh_2019" REAL, "generation_data_source" TEXT, "estimated_generation_gwh_2013" REAL, "estimated_generation_gwh_2014" REAL, "estimated_generation_gwh_2015" REAL, "estimated_generation_gwh_2016" REAL, "estimated_generation_gwh_2017" REAL, "estimated_generation_note_2013" TEXT, "estimated_generation_note_2014" TEXT, "estimated_generation_note_2015" TEXT, "estimated_generation_note_2016" TEXT, "estimated_generation_note_2017" TEXT ); CREATE INDEX ["global-power-plants_country_long"] ON [global-power-plants]("country_long"); CREATE INDEX ["global-power-plants_owner"] ON [global-power-plants]("owner");