global-power-plants
Data license: CC Attribution 4.0 License · Data source: World Resources Institute · About: global-power-plants-datasette
1,068 rows where primary_fuel = "Waste"
This data as json, CSV (advanced)
owner >30
- WM Renewable Energy LLC 59
- Waste Recycling Group 45
- Biffa 28
- EDL Inc 23
- SITA UK 18
- Natural Power 15
- Wheelabrator Environmental Systems 15
- EPP Renewable Energy 12
- Veolia 12
- Industrial Power Generating Company LLC 11
- Viridor 11
- Cube District Energy LLC 8
- NOVERA 8
- Wabash Valley Power Assn Inc 8
- Combined Landfill Projects (CLP) 7
- Innovative Energy Systems Inc 7
- LES Project Holdings LLC 7
- Sierra Pacific Industries Inc 7
- ENERGY DEVELOPMENTS (UK) LTD 6
- East Kentucky Power Coop Inc 6
- FCC Environment 6
- Renewable Power Generation Ltd 6
- South Carolina Public Service Authority 6
- Thames Water Utilities 6
- WM Illinois Renewable Energy LLC 6
- Cory Environmental 4
- Frontier Operation Services 4
- Gas Recovery Systems Inc 4
- Haul Waste Disposal Ltd 4
- North American Natural Res 4
- …
country_long 9
- United States of America 541
- United Kingdom 329
- Portugal 24
- Spain 15
- South Africa 6
- South Korea 4
- Singapore 3
- Nicaragua 2
- Rwanda 1
geolocation_source 7 ✖
primary_fuel 1
- Waste · 925 ✖
Link | rowid ▼ | country | country_long | name | gppd_idnr | capacity_mw | latitude | longitude | primary_fuel | other_fuel1 | other_fuel2 | other_fuel3 | commissioning_year | owner | source | url | geolocation_source | wepp_id | year_of_capacity_data | generation_gwh_2013 | generation_gwh_2014 | generation_gwh_2015 | generation_gwh_2016 | generation_gwh_2017 | generation_gwh_2018 | generation_gwh_2019 | generation_data_source | estimated_generation_gwh_2013 | estimated_generation_gwh_2014 | estimated_generation_gwh_2015 | estimated_generation_gwh_2016 | estimated_generation_gwh_2017 | estimated_generation_note_2013 | estimated_generation_note_2014 | estimated_generation_note_2015 | estimated_generation_note_2016 | estimated_generation_note_2017 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
17811 | 17811 | NIC | Nicaragua | Monte Rosa Cogen Power Plant Nicaragua | GEODB0043599 | 56.5 | 12.7058 | -87.2351 | Waste | GEODB | http://globalenergyobservatory.org | GEODB | 2017 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | |||||||||||||||||||
17812 | 17812 | NIC | Nicaragua | Nicaragua Sugar Estates Cogen Power Plant Nicaragua | GEODB0043600 | 59.3 | 12.531 | -87.0474 | Waste | GEODB | http://globalenergyobservatory.org | GEODB | 2017 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | |||||||||||||||||||
18629 | 18629 | PRT | Portugal | Abrunheira (Ecoparque) | WRI1022519 | 2.8 | 38.937 | -9.2859 | Waste | 2012.0 | Energias Endogenas de Portugal | http://e2p.inegi.up.pt/index.asp | Energias Endogenas de Portugal | 11.05 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
18670 | 18670 | PRT | Portugal | Aveiro (Aterro Sanitário) | WRI1022523 | 1.2 | 40.6566 | -8.5973 | Waste | 2007.0 | Energias Endogenas de Portugal | http://e2p.inegi.up.pt/index.asp | Energias Endogenas de Portugal | 4.73 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
18671 | 18671 | PRT | Portugal | Aveiro (CITVRSU) | WRI1022524 | 3.2 | 40.5983 | -8.5601 | Waste | 2012.0 | Energias Endogenas de Portugal | http://e2p.inegi.up.pt/index.asp | Energias Endogenas de Portugal | 12.62 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
18678 | 18678 | PRT | Portugal | Barlavento (Aterro Sanitário) | WRI1022527 | 1.7 | 37.2122 | -8.5278 | Waste | 2004.0 | Energias Endogenas de Portugal | http://e2p.inegi.up.pt/index.asp | Energias Endogenas de Portugal | 6.7 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
18695 | 18695 | PRT | Portugal | Braval (Ecoparque) | WRI1022528 | 1.1 | 41.5807 | -8.3141 | Waste | 2011.0 | Energias Endogenas de Portugal | http://e2p.inegi.up.pt/index.asp | Energias Endogenas de Portugal | 1080828 | 4.34 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
18750 | 18750 | PRT | Portugal | Coimbra (CITVRSU) | WRI1022530 | 3.2 | 40.2878 | -8.4725 | Waste | 2012.0 | Energias Endogenas de Portugal | http://e2p.inegi.up.pt/index.asp | Energias Endogenas de Portugal | 12.62 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
18810 | 18810 | PRT | Portugal | Incineradora da Terceira | WRI1022582 | 2.8 | 38.6818 | -27.1806 | Waste | 2016.0 | Energias Endogenas de Portugal | http://e2p.inegi.up.pt/index.asp | Energias Endogenas de Portugal | 11.05 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
18815 | 18815 | PRT | Portugal | LIPOR II | WRI1022583 | 29.0 | 41.2285 | -8.6498 | Waste | 1999.0 | Energias Endogenas de Portugal | http://e2p.inegi.up.pt/index.asp | Energias Endogenas de Portugal | 1049807 | 114.45 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
18821 | 18821 | PRT | Portugal | Leiria (Central de Valorização Orgânica) | WRI1022535 | 1.7 | 39.7321 | -8.8828 | Waste | 2011.0 | Energias Endogenas de Portugal | http://e2p.inegi.up.pt/index.asp | Energias Endogenas de Portugal | 6.7 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
18824 | 18824 | PRT | Portugal | Lipor - Valongo | WRI1022537 | 2.6 | 41.1995 | -8.5458 | Waste | 2009.0 | Energias Endogenas de Portugal | http://e2p.inegi.up.pt/index.asp | Energias Endogenas de Portugal | 10.26 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
18857 | 18857 | PRT | Portugal | Mato da Cruz (Aterro Sanitário) | WRI1022539 | 1.7 | 38.9186 | -9.0712 | Waste | 2011.0 | Energias Endogenas de Portugal | http://e2p.inegi.up.pt/index.asp | Energias Endogenas de Portugal | 6.7 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
18859 | 18859 | PRT | Portugal | Meia Serra (Estação de Tratamento de Resíduos) | WRI1022584 | 8.0 | 32.6507 | -16.9046 | Waste | 2003.0 | Energias Endogenas de Portugal | http://e2p.inegi.up.pt/index.asp | Energias Endogenas de Portugal | 31.57 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
18880 | 18880 | PRT | Portugal | Norte (ETAR) | WRI1022540 | 1.4 | 39.8952 | -8.9101 | Waste | 2009.0 | Energias Endogenas de Portugal | http://e2p.inegi.up.pt/index.asp | Energias Endogenas de Portugal | 5.52 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
18883 | 18883 | PRT | Portugal | Oeste (Aterro Sanitário) | WRI1022541 | 1.1 | 39.1119 | -9.0854 | Waste | 2011.0 | Energias Endogenas de Portugal | http://e2p.inegi.up.pt/index.asp | Energias Endogenas de Portugal | 4.34 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
18893 | 18893 | PRT | Portugal | Palmela (Ecoparque) | WRI1022542 | 2.4 | 38.616 | -8.9804 | Waste | 2011.0 | Energias Endogenas de Portugal | http://e2p.inegi.up.pt/index.asp | Energias Endogenas de Portugal | 9.47 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
18909 | 18909 | PRT | Portugal | Penafiel (Aterro Sanitário) | WRI1022544 | 1.0 | 41.0714 | -8.3522 | Waste | 2009.0 | Energias Endogenas de Portugal | http://e2p.inegi.up.pt/index.asp | Energias Endogenas de Portugal | 3.94 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
18923 | 18923 | PRT | Portugal | Planalto Beirão (Aterro Sanitário) | WRI1022545 | 3.9 | 40.4708 | -8.157 | Waste | 2010.0 | Energias Endogenas de Portugal | http://e2p.inegi.up.pt/index.asp | Energias Endogenas de Portugal | 15.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
18943 | 18943 | PRT | Portugal | Raposa (Aterro Sanitário) | WRI1022546 | 1.1 | 39.1192 | -8.6007 | Waste | 2011.0 | Energias Endogenas de Portugal | http://e2p.inegi.up.pt/index.asp | Energias Endogenas de Portugal | 4.34 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
18970 | 18970 | PRT | Portugal | Seixal (Ecoparque) | WRI1022548 | 1.9 | 38.6105 | -9.1477 | Waste | 2004.0 | Energias Endogenas de Portugal | http://e2p.inegi.up.pt/index.asp | Energias Endogenas de Portugal | 7.49 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
18983 | 18983 | PRT | Portugal | Sermonde (Aterro Sanitário) | WRI1022549 | 4.5 | 41.0461 | -8.5913 | Waste | 2004.0 | Energias Endogenas de Portugal | http://e2p.inegi.up.pt/index.asp | Energias Endogenas de Portugal | 17.76 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
19020 | 19020 | PRT | Portugal | Sotavento (Aterro Sanitário) | WRI1022551 | 1.2 | 37.1605 | -7.5836 | Waste | 2011.0 | Energias Endogenas de Portugal | http://e2p.inegi.up.pt/index.asp | Energias Endogenas de Portugal | 4.73 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
19073 | 19073 | PRT | Portugal | Valorsul (Central de Tratamento de Resíduos) | WRI1022585 | 50.6 | 38.8277 | -9.0826 | Waste | 1998.0 | Energias Endogenas de Portugal | http://e2p.inegi.up.pt/index.asp | Energias Endogenas de Portugal | 1032702 | 199.7 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
19074 | 19074 | PRT | Portugal | Valorsul (Central de Valorização Orgânica) | WRI1022555 | 1.7 | 38.7834 | -9.2405 | Waste | 2005.0 | Energias Endogenas de Portugal | http://e2p.inegi.up.pt/index.asp | Energias Endogenas de Portugal | 6.7 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
19079 | 19079 | PRT | Portugal | Viana do Castelo (Aterro Sanitário) | WRI1022556 | 2.0 | 41.6467 | -8.7682 | Waste | 2010.0 | Energias Endogenas de Portugal | http://e2p.inegi.up.pt/index.asp | Energias Endogenas de Portugal | 7.89 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
19721 | 19721 | RWA | Rwanda | Gisenyi | WRI1061143 | 3.78 | -1.727 | 29.256 | Waste | 2010.0 | Global Power Systems | http://www.globalpowersystems.eu/en/project-detail/gisenyi-power-plant-gas-bio-methane/ | KTH | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | |||||||||||||||||||
19850 | 19850 | SGP | Singapore | Keppel Seghers Tuas WTE Plant Singapore | GEODB0003828 | 22.0 | 1.2987 | 103.6215 | Waste | GEODB | http://globalenergyobservatory.org | GEODB | 1085144 | 2017 | 17.71 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
19858 | 19858 | SGP | Singapore | Senoko WTE Incineration Plant Singapore | GEODB0005333 | 56.0 | 1.4624 | 103.795 | Waste | GEODB | http://globalenergyobservatory.org | GEODB | 1022783 | 2017 | 45.08 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
19861 | 19861 | SGP | Singapore | Tuas South WTE Incineration Plant Singapore | GEODB0005797 | 80.0 | 1.2959 | 103.6205 | Waste | GEODB | http://globalenergyobservatory.org | GEODB | 1080323 | 2017 | 64.4 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
19908 | 19908 | ZAF | South Africa | Bisasar Road Landfill | WRI1026015 | 6.5 | -29.813 | 30.9821 | Waste | 2008.0 | Ethekwini Municipality | Ethekwini Municipality | http://www.cityenergy.org.za/uploads/resource_340.pdf | WRI | 1066856 | 0.0 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
19925 | 19925 | ZAF | South Africa | Dundee Biogas | WRI1026020 | 2.22 | -28.119 | 30.3584 | Waste | 2016.0 | Dundee Biogas Power | CDM | https://cdm.unfccc.int/filestorage/7/u/KG1M94TCPARQIYH3ZWD6J2LXOF8E0S.pdf/8047-PDD-6%20Nov%2012.pdf?t=YlJ8b2pkN2E0fDBhziM8O2VZh573GujB0TQQ | WRI | 0.0 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
19927 | 19927 | ZAF | South Africa | Ferro Waste Heat Plant | WRI1026031 | 2.2 | -25.725 | 27.6115 | Waste | International Ferro Metals SA | CDM | https://cdm.unfccc.int/filestorage/x/f/K7G8Q0O29ETDPLRIYMJWUH31AXZN6S.pdf/130320_PDD_v16_vvs.pdf?t=Q2t8b2pkOWY5fDBfprezsoFIxaE2NOr8UhEG | WRI | 0.0 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
19937 | 19937 | ZAF | South Africa | Hernic Waste Heat Plant | WRI1026032 | 25.47 | -25.662 | 27.837 | Waste | 2013.0 | Hernic Ferrochrome | CDM | https://cdm.unfccc.int/filestorage/u/6/NXTI6RW85GJYOVD7L31F9CPM04SKQZ.pdf/pdd_8956.pdf?t=V1N8b2pkOWpqfDD5qnFqM5wMEN5sEfTla-ss | WRI | 0.0 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
19967 | 19967 | ZAF | South Africa | Mariannhill Landfill | WRI1026013 | 2.0 | -29.848 | 30.8359 | Waste | Mariannhill Landfill | CDM | https://cdm.unfccc.int/filestorage/S/8/O/S8OFI0NDPKJB7E63VQAMHL94WGU21R/Durban%20PDD_v4-Clean_12Aug15%20ver2.pdf?t=a2F8b2pkNWpvfDA-631GBbgfn6Ka-mgOoj8a | WRI | 0.0 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
19976 | 19976 | ZAF | South Africa | PetroSA Biogas Plant | WRI1026012 | 4.2 | -34.145 | 22.1045 | Waste | 2007.0 | The Petroleum Oil and Gas Corporation of South Africa | CDM | https://cdm.unfccc.int/filestorage/M/V/B/MVB35TXGKH9S86MMWF1WMYV9LHQJC6.2/PetroSA%20biogas%20to%20energy%20project%20-%20PDD%20final.doc?t=bjh8b2pkNXBrfDCJrEDoqVQN88AILH3Ohy5c | WRI | 0.0 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
20048 | 20048 | KOR | South Korea | Gwangju | WRI1029926 | 2.0 | 35.0886 | 126.8863 | Waste | CDM | https://cdm.unfccc.int/Projects/DB/emc1293168061.78/view | WRI | 1069108 | 0.17 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
20068 | 20068 | KOR | South Korea | Jinju Landfill Gas | WRI1029927 | 15.0 | 35.1195 | 128.017 | Waste | CDM | https://cdm.unfccc.int/Projects/DB/Korean%20Standards%20Association1343973964.79/view | WRI | 1.3 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||||
20075 | 20075 | KOR | South Korea | Mokpo | WRI1029925 | 2.12 | 34.8328 | 126.4096 | Waste | CDM | https://cdm.unfccc.int/Projects/DB/emc1249265030.9/view | WRI | 0.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||||
20109 | 20109 | KOR | South Korea | Sudokwon | WRI1029924 | 50.0 | 37.5813 | 126.6464 | Waste | Sudokwon Landfill site management Corporation | CDM | https://cdm.unfccc.int/Projects/DB/DNV-CUK1171534717.86/view | WRI | 1058570 | 4.34 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
20138 | 20138 | ESP | Spain | ADS JUNEDA 2 | WRI1006161 | 15.0 | 41.5485 | 0.8245 | Waste | 2004.0 | VALORITZACIONS AGRORAMADERES LES GARRIGUES S.L. | Red Eléctrica de España | http://www.ree.es/en/statistical-data-of-spanish-electrical-system/annual-report/preliminary-report-spanish-electricity-system-2015 | CARMA | 1053781 | 5.22 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
20140 | 20140 | ESP | Spain | AGREDA | WRI1006163 | 16.334 | 41.8559 | -1.9224 | Waste | 2000.0 | INTEVER S.A. | Red Eléctrica de España | http://www.ree.es/en/statistical-data-of-spanish-electrical-system/annual-report/preliminary-report-spanish-electricity-system-2015 | CARMA | 1053787 | 5.68 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
20352 | 20352 | ESP | Spain | FUENTE ALAMO III | WRI1006489 | 75.0 | 37.7 | -1.1 | Waste | CARDENAL BELLUGA S.L. | Red Eléctrica de España | http://www.ree.es/en/statistical-data-of-spanish-electrical-system/annual-report/preliminary-report-spanish-electricity-system-2015 | CARMA | 26.12 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
20370 | 20370 | ESP | Spain | GRUPO TURBO-GENERADOR 2 TIRME-SON REUS | WRI1006520 | 74.80000000000001 | 39.5694 | 2.6502 | Waste | 2010.0 | TIRME S.A | Red Eléctrica de España | http://www.ree.es/en/statistical-data-of-spanish-electrical-system/annual-report/preliminary-report-spanish-electricity-system-2015 | CARMA | 1046533 | 26.05 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
20382 | 20382 | ESP | Spain | HORTA MEDIO AMBIENTE | WRI1006533 | 14.94 | 42.8561 | -7.1636 | Waste | HORTA MEDIO AMBIENTE S.A. | Red Eléctrica de España | http://www.ree.es/en/statistical-data-of-spanish-electrical-system/annual-report/preliminary-report-spanish-electricity-system-2015 | CARMA | 5.2 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
20398 | 20398 | ESP | Spain | LA ALJORRA-CARTAGENA | WRI1006574 | 27.17 | 37.4955 | -1.4802 | Waste | BECOSA ENERGIAS RENOVABLES S.A. | Red Eléctrica de España | http://www.ree.es/en/statistical-data-of-spanish-electrical-system/annual-report/preliminary-report-spanish-electricity-system-2015 | CARMA | 9.46 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
20498 | 20498 | ESP | Spain | OLEXTRA | WRI1006712 | 16.647 | 42.069 | 1.3135 | Waste | OLEXTRA S.A. | Red Eléctrica de España | http://www.ree.es/en/statistical-data-of-spanish-electrical-system/annual-report/preliminary-report-spanish-electricity-system-2015 | CARMA | 1083569 | 5.79 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
20812 | 20812 | ESP | Spain | PLANTA COGENERACION BECOSA -FUENTE PIEDRA | WRI1007749 | 16.434 | 37.1353 | -4.73 | Waste | 2003.0 | NEOELECTRA SC FUENTE DE PIEDRA GESTION S.L.U. | Red Eléctrica de España | http://www.ree.es/en/statistical-data-of-spanish-electrical-system/annual-report/preliminary-report-spanish-electricity-system-2015 | CARMA | 5.72 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
20813 | 20813 | ESP | Spain | PLANTA DDP GUARDO | WRI1007752 | 14.685 | 42.8261 | -4.8463 | Waste | DESIMPACTO DE PURINES GUARDO S.A. | Red Eléctrica de España | http://www.ree.es/en/statistical-data-of-spanish-electrical-system/annual-report/preliminary-report-spanish-electricity-system-2015 | CARMA | 5.11 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
20826 | 20826 | ESP | Spain | PROCESOS ECOLOGICOS CARMONA 1 | WRI1007808 | 45.0 | 37.4712 | -5.6461 | Waste | PROCESOS ECOLOGICOS CARMONA 1 S.A. | Red Eléctrica de España | http://www.ree.es/en/statistical-data-of-spanish-electrical-system/annual-report/preliminary-report-spanish-electricity-system-2015 | CARMA | 15.67 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
20827 | 20827 | ESP | Spain | PROCESOS ECOLOGICOS VILCHES | WRI1007810 | 15.0 | 38.207 | -3.5102 | Waste | 2001.0 | PROCESOS ECOLOGICOS VILCHES S.A. | Red Eléctrica de España | http://www.ree.es/en/statistical-data-of-spanish-electrical-system/annual-report/preliminary-report-spanish-electricity-system-2015 | CARMA | 5.22 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
20837 | 20837 | ESP | Spain | PURINARSA TRATAMIENTO DE PURINES | WRI1007837 | 15.0 | 42.4496 | -6.9476 | Waste | PURINARSA S.L. | Red Eléctrica de España | http://www.ree.es/en/statistical-data-of-spanish-electrical-system/annual-report/preliminary-report-spanish-electricity-system-2015 | CARMA | 5.22 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
20920 | 20920 | ESP | Spain | TRATAMIENTO DE PURINES | WRI1007981 | 15.0 | 41.5667 | 0.5167 | Waste | 2005.0 | NEOELECTRA SC ECONERGIA NAVARRA S.L. | Red Eléctrica de España | http://www.ree.es/en/statistical-data-of-spanish-electrical-system/annual-report/preliminary-report-spanish-electricity-system-2015 | CARMA | 5.22 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
20921 | 20921 | ESP | Spain | TRATAMIENTO DE PURINES OSA DE LA VEGA | WRI1007989 | 14.6 | 39.6598 | -2.76 | Waste | DEPURACION Y COGENERACION INTEGRAL SAL. | Red Eléctrica de España | http://www.ree.es/en/statistical-data-of-spanish-electrical-system/annual-report/preliminary-report-spanish-electricity-system-2015 | CARMA | 5.08 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
20936 | 20936 | ESP | Spain | VERTEDERO DEL GARRAF | WRI1008026 | 12.444 | 41.3888 | 2.159 | Waste | ENDESA COG. RENOV.S.A. Y CLP ENVIROGAS | Red Eléctrica de España | http://www.ree.es/en/statistical-data-of-spanish-electrical-system/annual-report/preliminary-report-spanish-electricity-system-2015 | CARMA | 4.33 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
21997 | 21997 | GBR | United Kingdom | Albury Landfill | GBR0000767 | 1.5 | 51.2242 | -0.4906 | Waste | SITA UK | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1011533 | 1.45 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
22003 | 22003 | GBR | United Kingdom | Allerton Waste Recovery Park (EfW) | GBR2001017 | 27.0 | 54.0326 | -1.3805 | Waste | AmeyCespa | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 26.14 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22005 | 22005 | GBR | United Kingdom | Allington EFW | GBR0000886 | 51.0 | 51.2865 | 0.4904 | Waste | Kent Enviropower (FCC Environment) | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1059836 | 49.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
22024 | 22024 | GBR | United Kingdom | Arden Quarry Landfill | GBR0000783 | 3.1 | 53.3718 | -1.9681 | Waste | Natural Power | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1049493 | 3.0 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
22025 | 22025 | GBR | United Kingdom | Ardley EfW | GBR0000962 | 26.0 | 51.8813 | -1.2304 | Waste | Viridor | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1084310 | 25.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
22026 | 22026 | GBR | United Kingdom | Ardley Fields Farm Landfill Site | GBR0000587 | 1.8 | 51.9433 | -1.2086 | Waste | Haul Waste Limited | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1041726 | 1.74 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
22033 | 22033 | GBR | United Kingdom | Ardwick Railway Goods Yard Incinerator (Newhaven EFW Plant) | GBR0000897 | 33.5 | 53.474 | -2.2079 | Waste | Associated Energy Projects plc | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1076355 | 32.44 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
22038 | 22038 | GBR | United Kingdom | Arlesey Landfill Gas (Extension) | GBR0000774 | 2.3 | 52.003 | -0.2703 | Waste | Waste Recycling Group | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1043067 | 2.22 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
22039 | 22039 | GBR | United Kingdom | Arlesey Landfill Site | GBR0000664 | 1.1 | 52.0017 | -0.2767 | Waste | Waste Recycling Group | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1.06 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22043 | 22043 | GBR | United Kingdom | Arpley Landfill Scheme 'A' | GBR0000547 | 7.9 | 53.3718 | -2.6432 | Waste | NOVERA | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1053941 | 7.65 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
22044 | 22044 | GBR | United Kingdom | Arpley Landfill Scheme 'B' | GBR0000549 | 7.9 | 53.3718 | -2.6432 | Waste | NOVERA | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1053941 | 7.65 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
22057 | 22057 | GBR | United Kingdom | Attlebridge Landfill Site | GBR0000509 | 1.3 | 52.6999 | 1.1776 | Waste | Renewable Power Generation Ltd | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1039922 | 1.25 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
22059 | 22059 | GBR | United Kingdom | Auchencarroch Landfill | GBR0000688 | 2.1 | 55.9968 | -4.5334 | Waste | Auchencarroch Energy Ltd / CLP | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 2.03 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22060 | 22060 | GBR | United Kingdom | Auchencarroch Landfill Extension | GBR0000786 | 2.0 | 55.9972 | -4.5326 | Waste | Auchencarroch Energy Ltd/CLP | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1.93 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22062 | 22062 | GBR | United Kingdom | Auchinlea Landfill Site | GBR0000716 | 2.3 | 55.8096 | -3.9004 | Waste | Natural Power | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 2.22 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22065 | 22065 | GBR | United Kingdom | Aveley | GBR0000514 | 1.2 | 51.504 | 0.2333 | Waste | Waste Recycling Group | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1.16 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22066 | 22066 | GBR | United Kingdom | Aveley Landfill Scheme | GBR0000510 | 2.1 | 51.5039 | 0.2348 | Waste | Waste Recycling Group | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 2.03 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22069 | 22069 | GBR | United Kingdom | Avondale | GBR0000639 | 4.0 | 55.905 | -3.945 | Waste | Shanks Avondale | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 3.87 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22098 | 22098 | GBR | United Kingdom | Baldovie | GBR0000874 | 8.3 | 56.4867 | -2.9028 | Waste | Dundee Energy Recycling | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1013880 | 8.03 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
22116 | 22116 | GBR | United Kingdom | Barkip Landfill Site | GBR0000682 | 1.2 | 55.7181 | -4.7186 | Waste | William Tracey Ltd | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1.16 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22118 | 22118 | GBR | United Kingdom | Barling Hall Farm | GBR0000735 | 2.4 | 51.5801 | 0.7928 | Waste | Cory Environmental | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 2.32 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22137 | 22137 | GBR | United Kingdom | Battlefield EfW | GBR0000910 | 8.0 | 52.7426 | -2.7272 | Waste | Veolia | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1102895 | 7.74 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
22139 | 22139 | GBR | United Kingdom | Beacon Hill | GBR0000723 | 3.0 | 50.7546 | -2.0297 | Waste | Combined Landfill Projects (CLP) / SITA UK | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 2.9 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22148 | 22148 | GBR | United Kingdom | Beckton STW Enhanced Sludge Digestion | GBR0006182 | 5.8 | 51.5256 | 0.0799 | Waste | Thames Water Utilities | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1031283 | 5.61 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
22151 | 22151 | GBR | United Kingdom | Beddingham 'B' Landfill Scheme | GBR0000579 | 7.5 | 50.849 | 0.0513 | Waste | Haul Waste Disposal Ltd | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1041727 | 7.26 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
22152 | 22152 | GBR | United Kingdom | Beddington EfW | GBR2001015 | 26.0 | 51.3805 | -0.1472 | Waste | Viridor | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 25.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22163 | 22163 | GBR | United Kingdom | Bellhouse Pit Landfill Scheme | GBR0000505 | 2.7 | 51.8753 | 0.8198 | Waste | Ex Waste Ltd/Combined Landfill Projects Ltd (CLP) | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1045085 | 2.61 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
22164 | 22164 | GBR | United Kingdom | Bellhouse South | GBR0000736 | 3.9 | 51.8643 | 0.8293 | Waste | Cory Environmental | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 3.77 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22170 | 22170 | GBR | United Kingdom | Bennett Bank Landfill Site (lfg) | GBR0000698 | 2.2 | 54.1603 | -3.2037 | Waste | Waste Recycling Group | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 2.13 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22185 | 22185 | GBR | United Kingdom | Betton Abbots | GBR0000701 | 1.3 | 52.6702 | -2.7201 | Waste | SITA UK / Natural Power | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1.25 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22190 | 22190 | GBR | United Kingdom | Bidston Moss Landfill Scheme | GBR0000551 | 2.3 | 53.4101 | -3.0756 | Waste | Bidston Methane Ltd | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1041728 | 2.22 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
22194 | 22194 | GBR | United Kingdom | Billinge Hill Quarry Landfill Scheme | GBR0000573 | 1.0 | 53.5062 | -2.7176 | Waste | Bidston Methane Ltd. | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 0.96 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22199 | 22199 | GBR | United Kingdom | Binn Landfill | GBR0000715 | 1.9 | 56.3103 | -3.3335 | Waste | SITA UK / Natural Power | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1.84 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22209 | 22209 | GBR | United Kingdom | Black Dog | GBR0000629 | 2.2 | 57.2205 | -2.0604 | Waste | FCC Environment | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 2.13 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22217 | 22217 | GBR | United Kingdom | Blackborough End Landfill Site | GBR0000729 | 1.5 | 52.7032 | 0.4732 | Waste | Combined Landfill Projects (CLP) | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1.45 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22230 | 22230 | GBR | United Kingdom | Bletchley Phase II | GBR0000536 | 2.2 | 51.9791 | -0.7653 | Waste | Waste Recycling Group | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 2.13 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22249 | 22249 | GBR | United Kingdom | Bolton EfW | GBR0000898 | 8.0 | 53.567 | -2.4076 | Waste | Viridor (GMWDA) | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1048249 | 7.74 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
22254 | 22254 | GBR | United Kingdom | Bonnyrigg | GBR0000747 | 2.2 | 55.8865 | -3.1255 | Waste | Natural Power | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 2.13 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22255 | 22255 | GBR | United Kingdom | Bootham Lane | GBR0000614 | 1.2 | 53.5861 | -1.0105 | Waste | Waste Recycling Group | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1.16 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22256 | 22256 | GBR | United Kingdom | Bootham Lane Landfill | GBR0000743 | 2.7 | 53.5897 | -1.0089 | Waste | Natural Power | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1052864 | 2.61 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
22257 | 22257 | GBR | United Kingdom | Bootham Lane Phase 2 | GBR0000630 | 1.4 | 53.5861 | -1.0105 | Waste | Waste Recycling Group | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1.35 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22259 | 22259 | GBR | United Kingdom | Boston Landfill Scheme | GBR0000752 | 1.3 | 52.9522 | 0.005 | Waste | Renewable Power Systems | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1047398 | 1.25 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
22276 | 22276 | GBR | United Kingdom | Bradgate Quarry Landfill Gas Scheme | GBR0000531 | 2.5 | 52.6727 | -1.2428 | Waste | Waste Recycling Group | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1044644 | 2.42 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
22285 | 22285 | GBR | United Kingdom | Brazier Landfill Scheme | GBR0000507 | 3.9 | 51.8157 | -0.056 | Waste | Pioneer Aggregates (UK) Ltd | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1041730 | 3.77 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
22289 | 22289 | GBR | United Kingdom | Brenkley Landfill | GBR0000704 | 1.9 | 55.069 | -1.6743 | Waste | SITA UK / Natural Power | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1.84 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 |
Advanced export
JSON shape: default, array, newline-delimited
CREATE TABLE "global-power-plants" ( "country" TEXT, "country_long" TEXT, "name" TEXT, "gppd_idnr" TEXT, "capacity_mw" REAL, "latitude" REAL, "longitude" REAL, "primary_fuel" TEXT, "other_fuel1" TEXT, "other_fuel2" TEXT, "other_fuel3" TEXT, "commissioning_year" REAL, "owner" TEXT, "source" TEXT, "url" TEXT, "geolocation_source" TEXT, "wepp_id" TEXT, "year_of_capacity_data" INTEGER, "generation_gwh_2013" REAL, "generation_gwh_2014" REAL, "generation_gwh_2015" REAL, "generation_gwh_2016" REAL, "generation_gwh_2017" REAL, "generation_gwh_2018" REAL, "generation_gwh_2019" REAL, "generation_data_source" TEXT, "estimated_generation_gwh_2013" REAL, "estimated_generation_gwh_2014" REAL, "estimated_generation_gwh_2015" REAL, "estimated_generation_gwh_2016" REAL, "estimated_generation_gwh_2017" REAL, "estimated_generation_note_2013" TEXT, "estimated_generation_note_2014" TEXT, "estimated_generation_note_2015" TEXT, "estimated_generation_note_2016" TEXT, "estimated_generation_note_2017" TEXT ); CREATE INDEX ["global-power-plants_country_long"] ON [global-power-plants]("country_long"); CREATE INDEX ["global-power-plants_owner"] ON [global-power-plants]("owner");