global-power-plants
Data license: CC Attribution 4.0 License · Data source: World Resources Institute · About: global-power-plants-datasette
178 rows where country_long = "Indonesia" sorted by longitude
This data as json, CSV (advanced)
Suggested facets: capacity_mw, latitude, longitude, commissioning_year, source, url, geolocation_source, wepp_id, estimated_generation_gwh_2013, estimated_generation_gwh_2017, estimated_generation_note_2013, estimated_generation_note_2015, estimated_generation_note_2016, estimated_generation_note_2017
owner 96
- PLN - PT. Indonesia Power 16
- PLN - Java Bali Generation Unit / PT. PJB 13
- PLN 11
- PLN-South Sumatera Generation Unit 11
- PT. Indonesia Power 8
- PLN-South&South East Sulawesi Regional Unit 6
- PLN – Indonesia Power 5
- PLN – Java Bali Generation Unit / PT. PJB 5
- PT PLN Persero 5
- PT. PJB 4
- PLN / KITSUMBAGUT 3
- Anggreko International - rental 2
- PLN - North Sumatera Generation Unit 2
- PLN-Nth & Ctrl Sulawesi & Gorontalo Reg Unit 2
- PT. Energy Sengkang 2
- PT. Inco 2
- PT. Indonesia Asahan aluminium 2
- BPPT + Pertamina 1
- INDONESIA POWER UNIT 1
- Indonesia Power 1
- PLN (EPC : PT. Bagus Karya Guangdong Power Engineering PT. Nincec Multi Dimensi) 1
- PLN (EPC : Sinohydro Co. Ltd) 1
- PLN (EPC: CNTIC (China National Tecnical Import Corporation)) 1
- PLN + China National Electric Engineering Co. Ltd. (CNEEC) 1
- PLN + Dongfang Electrik Corp PT Dalle Energy 1
- PLN + Pertamina Geothermal Energy 1
- PLN - East Kalimantan Regional Unit 1
- PLN - East Nusa Tenggara Regional Unit/NTT 1
- PLN - Maluku Regional Unit 1
- PLN - Pandan Sector 1
- PLN - Rental 1
- PLN - South Kalimantan Regional Unit 1
- PLN - West Nusa Tenggara Regional Unit/NTB 1
- PLN - rental 1
- PLN -.PT Indonesia Power 1
- PLN -.PT Indonesia Power - 2010 1
- PLN / 2010 1
- PLN Cilegon Generation Unit 1
- PLN – sewa 1
- PLN(EPC : Zeland-Priamanaya-Tronoh) 1
- PLN-East Kalimantan Regional Unit 1
- PLT – rented from PT. Krista Inti Persada 1
- PT Asta Keramasan Energy (AKE) 1
- PT BA for own use 1
- PT Bajradaya Sentranusa (China Huadian Corporation 70% + PJB 26.5%+Nusa Konstruksi Engineering 3.5%) 1
- PT Bosowa Energy 1
- PT Cikarang Listrindo 1
- PT Gahapi Nisco Steel 1
- PT General Energy Bali 1
- PT Indah Kiat Pulp & Paper 1
- PT Indorama Synthetics Tbk 1
- PT Lestari Baten Energi (LBE) 1
- PT Mandau Cipta Tenaga Nusanatara (subsidiary of Chevron) 1
- PT Merak Energi 1
- PT Primanaya Energi 1
- PT Puncakjaya Power 1
- PT Well Harvest Winning Alumina Refinery 1
- PT. Bekasi Power/PT. Kawasan Industri Jababeka Tbk 1
- PT. Bukit Pembangkit Inovatif (PT BA 59.75% PT PJB 29.15% dan PT Navigate Innovative Indonesia (PT NII) 11.1%) 1
- PT. Cahaya Fajar Kaltim 1
- PT. Cahaya Sakti 1
- PT. Central Java Power 1
- PT. Central Java Power (EPC : Korea Midland Power Co) 1
- PT. Chevron Geothermal Darajat Ltd 1
- PT. Chevron Geothermal Salak Ltd 1
- PT. Cikarang Listrindo 1
- PT. Cirebon Electric Power 1
- PT. Cogindo DayaBersama - rental 1
- PT. Energi Listrik Indonesia (subsidiary of PT. Eksploitasi Energi Indonesia) 1
- PT. Geo Dipa Energy 1
- PT. Guo Hua Energy Musi Makmur 1
- PT. Hendratna Plywood 1
- PT. Indonesia Power & electrindo Perkasa Utama 1
- PT. Jorindo Aceh Power 1
- PT. Krakatau Daya Listrik 1
- PT. Krakatau Posco Energy (JV : Korea Posco Energy (70%) + PT. Krakatau Daya Listrik (30%)) 1
- PT. Listrindo (IPP) 1
- PT. Makasar Power (Alsons Power Holdings Corp + Toyota Tsusho Corp/Tomen + Singapore Power) 1
- PT. Makmur Sejahtera Wisesa (owned by PT. Adaro) 1
- PT. PLN 1
- PT. Paiton Energy Corp 1
- PT. Pakerin (pulp industry) 1
- PT. Pertamina Geothermal Energy 1
- PT. Pusaka Jaya Palu Power 1
- PT. Semen Gresik Tbk/PT. Semen Indonesia 1
- PT. Star Energy 1
- PT. Sumber Segara Primadaya 1
- PT. Suparma (pulp industry) 1
- PT. Tanjung Alam Perkasa 1
- PT. Tanjung Jabung Power 1
- PT. Tanjung Kasam Power Batam (PT. TJK Power) 1
- Perum Jasa Tirta II 1
- Pt Newmont Nusa Tenggara 1
- Sulawesi Mining Investment 1
- Sumber Segara Primadaya 1
- bright PLN Batam 1
primary_fuel 5
- Coal 70
- Gas 41
- Hydro 41
- Oil 16
- Geothermal 10
estimated_generation_note_2014 2 ✖
- NO-ESTIMATION 137
- HYDRO-V1 41
country_long 1
- Indonesia · 178 ✖
Link | rowid | country | country_long | name | gppd_idnr | capacity_mw | latitude | longitude ▼ | primary_fuel | other_fuel1 | other_fuel2 | other_fuel3 | commissioning_year | owner | source | url | geolocation_source | wepp_id | year_of_capacity_data | generation_gwh_2013 | generation_gwh_2014 | generation_gwh_2015 | generation_gwh_2016 | generation_gwh_2017 | generation_gwh_2018 | generation_gwh_2019 | generation_data_source | estimated_generation_gwh_2013 | estimated_generation_gwh_2014 | estimated_generation_gwh_2015 | estimated_generation_gwh_2016 | estimated_generation_gwh_2017 | estimated_generation_note_2013 | estimated_generation_note_2014 | estimated_generation_note_2015 | estimated_generation_note_2016 | estimated_generation_note_2017 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
15759 | 15759 | IDN | Indonesia | PLTU NAD-Nagan Raya | WRI1000956 | 220.0 | 4.1089 | 96.1972 | Coal | PLN (EPC : Sinohydro Co. Ltd) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1073026 | 1197.23 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15684 | 15684 | IDN | Indonesia | Lau Renun | WRI1000781 | 82.0 | 3.0824 | 98.065 | Hydro | PLN - Pandan Sector | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026134 | 281.58 | 231.76 | 248.79 | 271.47 | 271.06 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15764 | 15764 | IDN | Indonesia | PLTU Pangkalan Susu 1 & 2 | WRI1000967 | 400.0 | 4.1196 | 98.2555 | Coal | PLN (EPC : PT. Bagus Karya Guangdong Power Engineering PT. Nincec Multi Dimensi) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1079188 | 2176.79 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15687 | 15687 | IDN | Indonesia | Medan Steel Mill Power Plant | WRI1075810 | 60.0 | 3.6676 | 98.6654 | Coal | 2017.0 | PT Gahapi Nisco Steel | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 326.51 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15696 | 15696 | IDN | Indonesia | PLTG Belawan | WRI1000817 | 260.0 | 3.5833 | 98.6667 | Gas | PLN / KITSUMBAGUT | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026045 | 1083.34 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15697 | 15697 | IDN | Indonesia | PLTG Belawan TTF | WRI1000818 | 105.0 | 3.5833 | 98.6667 | Gas | PLN / KITSUMBAGUT | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026045 | 437.5 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15719 | 15719 | IDN | Indonesia | PLTGU Belawan – Sicanang | WRI1000871 | 817.0 | 3.7715 | 98.6687 | Gas | PLN / KITSUMBAGUT | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026045 | 3404.21 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15755 | 15755 | IDN | Indonesia | PLTU Labuhan Angin | WRI1000948 | 230.0 | 1.7176 | 98.7265 | Coal | PLN - North Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1066585 | 1251.65 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15803 | 15803 | IDN | Indonesia | Sipansihaporas | WRI1001018 | 50.0 | 1.7427 | 98.7792 | Hydro | PLN - North Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1055420 | 160.65 | 122.7 | 148.67 | 163.59 | 167.37 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15645 | 15645 | IDN | Indonesia | Asahan I | WRI1000737 | 180.0 | 2.5113 | 99.259 | Hydro | PT Bajradaya Sentranusa (China Huadian Corporation 70% + PJB 26.5%+Nusa Konstruksi Engineering 3.5%) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1076093 | 614.23 | 443.82 | 523.3 | 555.94 | 592.43 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15800 | 15800 | IDN | Indonesia | Sigura gura (asahan II) | WRI1001014 | 286.0 | 2.5196 | 99.2793 | Hydro | PT. Indonesia Asahan aluminium | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 870.63 | 615.78 | 742.08 | 800.14 | 835.99 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | ||||||||||||||
15808 | 15808 | IDN | Indonesia | Tangga (asahan II) | WRI1001024 | 317.0 | 2.5479 | 99.3028 | Hydro | PT. Indonesia Asahan aluminium | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1025945 | 965.0 | 682.53 | 822.52 | 886.87 | 926.6 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15686 | 15686 | IDN | Indonesia | Maninjau III | WRI1000785 | 123.0 | -0.2923 | 100.152 | Hydro | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026095 | 319.89 | 238.5 | 290.43 | 325.76 | 335.29 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15807 | 15807 | IDN | Indonesia | Talang Padang | WRI1001023 | 12.5 | -0.9492 | 100.3543 | Oil | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1093596 | 22.56 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15771 | 15771 | IDN | Indonesia | PLTU Sumbar - Teluk sirih Unit 1 | WRI1000980 | 112.0 | -1.0772 | 100.3727 | Coal | PLN (EPC: CNTIC (China National Tecnical Import Corporation)) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1066878 | 609.5 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15802 | 15802 | IDN | Indonesia | Singkarak | WRI1001017 | 175.0 | -0.6909 | 100.6034 | Hydro | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026146 | 551.31 | 462.3 | 484.64 | 533.52 | 559.21 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15760 | 15760 | IDN | Indonesia | PLTU Ombilin - Sijantang - Sawahlunto | WRI1000960 | 200.0 | -0.6094 | 100.7535 | Coal | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026107 | 1088.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15677 | 15677 | IDN | Indonesia | Koto Panjang Kampar | WRI1000775 | 114.0 | 0.2905 | 100.8814 | Hydro | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 419.08 | 310.21 | 359.57 | 397.38 | 420.15 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | ||||||||||||||
15693 | 15693 | IDN | Indonesia | North Duri Cogeneration Plant | WRI1000794 | 300.0 | 1.3722 | 101.226 | Gas | PT Mandau Cipta Tenaga Nusanatara (subsidiary of Chevron) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1092378 | 1250.01 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15787 | 15787 | IDN | Indonesia | Pekanbaru Tenayan power station | WRI1075813 | 220.0 | 0.5644 | 101.5234 | Coal | 2016.0 | PT PLN Persero | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 1197.23 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15789 | 15789 | IDN | Indonesia | Perawang Mill power station | WRI1075814 | 755.0 | 0.6893 | 101.6191 | Coal | 2009.0 | PT Indah Kiat Pulp & Paper | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 4108.69 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15732 | 15732 | IDN | Indonesia | PLTMG Panaran | WRI1000894 | 24.0 | 0.1807 | 101.8444 | Gas | bright PLN Batam | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1060287 | 100.0 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15691 | 15691 | IDN | Indonesia | Musi | WRI1000792 | 215.475 | -3.766 | 102.435 | Hydro | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026105 | 561.45 | 422.24 | 513.22 | 571.75 | 588.43 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15672 | 15672 | IDN | Indonesia | Keban Agung power station | WRI1075807 | 270.0 | -3.7515 | 103.6481 | Coal | 2015.0 | PT Primanaya Energi | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 1469.33 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15738 | 15738 | IDN | Indonesia | PLTU Banjarsari/Merapi Timur-Lahat | WRI1000913 | 220.0 | -3.7241 | 103.6894 | Coal | PT. Bukit Pembangkit Inovatif (PT BA 59.75% PT PJB 29.15% dan PT Navigate Innovative Indonesia (PT NII) 11.1%) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1057264 | 1197.23 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15743 | 15743 | IDN | Indonesia | PLTU Bukit Asam | WRI1000919 | 30.0 | -3.7316 | 103.7975 | Coal | PT BA for own use | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026052 | 163.25 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15777 | 15777 | IDN | Indonesia | PLTU Tanjung Enim -Bukit Asam | WRI1000988 | 260.0 | -3.7316 | 103.7975 | Coal | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1076783 | 1414.91 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15769 | 15769 | IDN | Indonesia | PLTU Simpang Belimbing | WRI1000978 | 227.0 | -3.4 | 104.1158 | Coal | PT. Guo Hua Energy Musi Makmur | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1075907 | 1235.32 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15780 | 15780 | IDN | Indonesia | PLTU Tanjung Kasam | WRI1000992 | 110.0 | 1.0455 | 104.133 | Coal | PT. Tanjung Kasam Power Batam (PT. TJK Power) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1060288 | 598.61 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15734 | 15734 | IDN | Indonesia | PLTMG Tj. Jabung | WRI1000904 | 8.0 | -1.0167 | 104.3667 | Gas | PT. Tanjung Jabung Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 33.33 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15816 | 15816 | IDN | Indonesia | Ulubelu 1 & 2 | WRI1001040 | 110.0 | -5.3096 | 104.5733 | Geothermal | PT. PLN | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1011547 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15704 | 15704 | IDN | Indonesia | PLTG Keramasan | WRI1000833 | 145.0 | -2.9167 | 104.7458 | Gas | PT Asta Keramasan Energy (AKE) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026111 | 604.17 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15705 | 15705 | IDN | Indonesia | PLTG Keramasan #1 2 3 4 | WRI1000834 | 65.0 | -2.9167 | 104.7458 | Gas | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026111 | 270.83 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15810 | 15810 | IDN | Indonesia | Tegineneng | WRI1001028 | 28.2 | -5.6015 | 104.7988 | Oil | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026165 | 50.9 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15651 | 15651 | IDN | Indonesia | Besai - Way Kanan | WRI1000744 | 92.8 | -4.9822 | 104.8051 | Hydro | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026048 | 268.15 | 244.77 | 253.6 | 273.52 | 280.63 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15781 | 15781 | IDN | Indonesia | PLTU Tarahan # 1 2 | WRI1000994 | 200.0 | -5.518 | 105.35 | Coal | Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026163 | 1088.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15782 | 15782 | IDN | Indonesia | PLTU Tarahan 3 & 4 - Sebalang | WRI1000995 | 200.0 | -5.518 | 105.35 | Coal | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1088.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15682 | 15682 | IDN | Indonesia | Lampung Sebalang power station | WRI1075809 | 200.0 | -5.5859 | 105.3872 | Coal | 2015.0 | PT PLN Persero | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 1088.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15740 | 15740 | IDN | Indonesia | PLTU Banten 2 - Labuhan | WRI1000915 | 600.0 | -6.3919 | 105.8288 | Coal | PLN / 2010 | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 3265.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15723 | 15723 | IDN | Indonesia | PLTGU Krakatau Daya Listrik (KDL) | WRI1000878 | 400.0 | -5.9924 | 105.9849 | Gas | PT. Krakatau Daya Listrik | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1666.69 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15706 | 15706 | IDN | Indonesia | PLTG Krakatau Posco Energy | WRI1000835 | 200.0 | -6.0048 | 105.9961 | Gas | PT. Krakatau Posco Energy (JV : Korea Posco Energy (70%) + PT. Krakatau Daya Listrik (30%)) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 833.34 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15773 | 15773 | IDN | Indonesia | PLTU Suralaya | WRI1000982 | 3400.0 | -5.892 | 106.03 | Coal | PLN -.PT Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026152 | 18502.72 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15648 | 15648 | IDN | Indonesia | Banten Serang power station | WRI1075800 | 660.0 | -5.883 | 106.0459 | Coal | 2017.0 | PT Lestari Baten Energi (LBE) | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 3591.7 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15689 | 15689 | IDN | Indonesia | Merak power station | WRI1075811 | 120.0 | -5.884 | 106.0642 | Coal | 2014.0 | PT Merak Energi | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 653.03 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15720 | 15720 | IDN | Indonesia | PLTGU Cilegon | WRI1000874 | 903.0 | -5.9306 | 106.1042 | Gas | PLN Cilegon Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 3762.55 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15739 | 15739 | IDN | Indonesia | PLTU Banten 1 - Suralaya unit 8 | WRI1000914 | 625.0 | -6.0585 | 106.4646 | Coal | PLN -.PT Indonesia Power - 2010 | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026152 | 3401.23 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15741 | 15741 | IDN | Indonesia | PLTU Banten 3 - Teluk Naga/Lontar | WRI1000916 | 945.0 | -6.0585 | 106.4646 | Coal | PLN + Dongfang Electrik Corp PT Dalle Energy | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 5142.66 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15749 | 15749 | IDN | Indonesia | PLTU Jabar Selatan - Pelabuhan Ratu | WRI1000938 | 1050.0 | -7.0242 | 106.5464 | Coal | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1066867 | 5714.07 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15665 | 15665 | IDN | Indonesia | Gunung Salak | WRI1000759 | 375.0 | -6.7416 | 106.648 | Geothermal | PT. Chevron Geothermal Salak Ltd | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026072 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15664 | 15664 | IDN | Indonesia | Gunung Malang | WRI1000758 | 25.536 | -6.7409 | 106.673 | Oil | PLN-East Kalimantan Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 46.09 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15698 | 15698 | IDN | Indonesia | PLTG Cikarang Listrindo | WRI1000821 | 150.0 | -6.1133 | 106.7788 | Gas | PT. Cikarang Listrindo | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 625.0 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15724 | 15724 | IDN | Indonesia | PLTGU Muara Karang Block I | WRI1000879 | 509.0 | -6.1087 | 106.7877 | Gas | PLN – Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026102 | 2120.86 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15725 | 15725 | IDN | Indonesia | PLTGU Muara Karang repowering | WRI1000880 | 753.0 | -6.1087 | 106.7877 | Gas | PLN – Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026102 | 3137.54 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15726 | 15726 | IDN | Indonesia | PLTGU Muara Karang repowering Blok 2 | WRI1000881 | 210.0 | -6.1087 | 106.7877 | Gas | PLN – Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026102 | 875.01 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15758 | 15758 | IDN | Indonesia | PLTU Muara Karang | WRI1000954 | 400.0 | -6.1069 | 106.7882 | Coal | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026102 | 2176.79 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15729 | 15729 | IDN | Indonesia | PLTGU Priok Block 1 2 | WRI1000885 | 1180.0 | -6.1102 | 106.8671 | Gas | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 4916.73 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15711 | 15711 | IDN | Indonesia | PLTG Priok | WRI1000846 | 52.0 | -6.1071 | 106.8716 | Gas | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 216.66 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15766 | 15766 | IDN | Indonesia | PLTU Priok 3 & 4 | WRI1000972 | 100.0 | -6.1071 | 106.8716 | Coal | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 544.19 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15707 | 15707 | IDN | Indonesia | PLTG Muara Tawar B-3 | WRI1000836 | 420.0 | -6.0867 | 106.9987 | Gas | PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026103 | 1750.02 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15708 | 15708 | IDN | Indonesia | PLTG Muara Tawar Block 4 | WRI1000837 | 420.0 | -6.0867 | 106.9987 | Gas | PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026103 | 1750.02 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15727 | 15727 | IDN | Indonesia | PLTGU Muara Tawar Block 1 &2 | WRI1000882 | 920.0 | -6.0867 | 106.9987 | Gas | PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026103 | 3833.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15728 | 15728 | IDN | Indonesia | PLTGU Muara Tawar Block 5 | WRI1000883 | 384.0 | -6.0867 | 106.9987 | Gas | PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026103 | 1600.02 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15656 | 15656 | IDN | Indonesia | Cikarang Babelan power station | WRI1075803 | 280.0 | -6.1161 | 107.052 | Coal | 2017.0 | PT Cikarang Listrindo | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 1523.75 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15718 | 15718 | IDN | Indonesia | PLTGU Bekasi Power | WRI1000870 | 130.0 | -6.2611 | 107.1528 | Gas | PT. Bekasi Power/PT. Kawasan Industri Jababeka Tbk | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1075035 | 541.67 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15796 | 15796 | IDN | Indonesia | Saguling | WRI1001005 | 700.72 | -6.9126 | 107.3663 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026135 | 2110.52 | 1512.59 | 2024.74 | 2178.25 | 2110.52 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15658 | 15658 | IDN | Indonesia | CirataI & II | WRI1000748 | 1008.0 | -6.7004 | 107.3671 | Hydro | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026056 | 3426.09 | 2354.32 | 3099.69 | 3272.44 | 3205.36 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15666 | 15666 | IDN | Indonesia | Jatiluhur | WRI1000762 | 186.0 | -6.523 | 107.389 | Hydro | Perum Jasa Tirta II | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 670.77 | 452.3 | 524.85 | 671.81 | 664.17 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | ||||||||||||||
15794 | 15794 | IDN | Indonesia | Purwakarta Indorama Power Station | WRI1075815 | 60.0 | -6.5539 | 107.4137 | Coal | 2006.0 | PT Indorama Synthetics Tbk | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 326.51 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15669 | 15669 | IDN | Indonesia | Kamojang 1 2 3 | WRI1000764 | 140.0 | -6.4239 | 107.4553 | Geothermal | PLN – Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026079 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15670 | 15670 | IDN | Indonesia | Kamojang 4 | WRI1000765 | 60.0 | -6.4239 | 107.4553 | Geothermal | PT. Pertamina Geothermal Energy | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026079 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15650 | 15650 | IDN | Indonesia | Bengkok+Dago/saguling | WRI1000743 | 3.85 | -6.6247 | 107.5564 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 13.0 | 10.85 | 13.53 | 13.6 | 13.49 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | ||||||||||||||
15655 | 15655 | IDN | Indonesia | Cikalong/saguling | WRI1000747 | 19.2 | -6.9039 | 107.6186 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026135 | 70.7 | 65.53 | 63.95 | 76.04 | 65.27 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15678 | 15678 | IDN | Indonesia | Kracak/saguling | WRI1000776 | 18.9 | -6.9039 | 107.6186 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026135 | 69.59 | 64.51 | 62.95 | 74.85 | 64.25 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15681 | 15681 | IDN | Indonesia | Lamajan/saguling | WRI1000779 | 19.56 | -6.9039 | 107.6186 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026135 | 72.02 | 65.75 | 64.14 | 77.47 | 66.5 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15793 | 15793 | IDN | Indonesia | Plengan/Saguling | WRI1000806 | 6.87 | -6.9039 | 107.6186 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 24.7 | 24.04 | 23.47 | 26.71 | 23.28 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | ||||||||||||||
15815 | 15815 | IDN | Indonesia | Ubrug/saguling | WRI1001039 | 18.36 | -6.9039 | 107.6186 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 67.6 | 62.66 | 61.15 | 72.72 | 62.42 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | ||||||||||||||
15817 | 15817 | IDN | Indonesia | Wayang Windu | WRI1001044 | 227.0 | -7.1966 | 107.6258 | Geothermal | PT. Star Energy | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1010414 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15659 | 15659 | IDN | Indonesia | Darajat 1 | WRI1000750 | 55.0 | -7.2173 | 107.7394 | Geothermal | PLN – Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | |||||||||||||||||||
15660 | 15660 | IDN | Indonesia | Darajat 2 3 | WRI1000751 | 215.0 | -7.2173 | 107.7394 | Geothermal | PT. Chevron Geothermal Darajat Ltd | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | |||||||||||||||||||
15750 | 15750 | IDN | Indonesia | PLTU Jawa Barat - Indramayu | WRI1000939 | 990.0 | -6.2747 | 107.9704 | Coal | PLN + China National Electric Engineering Co. Ltd. (CNEEC) | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1071378 | 5387.55 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15745 | 15745 | IDN | Indonesia | PLTU Cirebon | WRI1000921 | 660.0 | -6.7704 | 108.6151 | Coal | PT. Cirebon Electric Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1066870 | 3591.7 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15716 | 15716 | IDN | Indonesia | PLTGB Singkawang | WRI1000867 | 9.0 | 0.9 | 109.0 | Gas | PLT – rented from PT. Krista Inti Persada | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1041391 | 37.5 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15699 | 15699 | IDN | Indonesia | PLTG Cilacap | WRI1000822 | 55.0 | -7.7264 | 109.0094 | Gas | PLN – Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 229.17 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15744 | 15744 | IDN | Indonesia | PLTU Cilacap 1 & 2 | WRI1000920 | 600.0 | -7.7513 | 109.0186 | Coal | PT. Sumber Segara Primadaya | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1050225 | 3265.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15657 | 15657 | IDN | Indonesia | Cilacap Sumber power station | WRI1075804 | 1260.0 | -7.6832 | 109.0964 | Coal | 2011.0 | Sumber Segara Primadaya | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 6856.89 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15675 | 15675 | IDN | Indonesia | Ketenger / mrica | WRI1000772 | 8.04 | -7.5097 | 109.2778 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1050220 | 33.59 | 25.5 | 29.83 | 35.02 | 32.34 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15797 | 15797 | IDN | Indonesia | Sempor/Mrica | WRI1001009 | 1.0 | -7.4733 | 109.3331 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1050218 | 3.35 | 3.45 | 3.96 | 3.31 | 3.53 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15695 | 15695 | IDN | Indonesia | PLTG (ex PLTD Sunyaragi) | WRI1000809 | 18.0 | -7.4064 | 109.5842 | Gas | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026057 | 75.0 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15700 | 15700 | IDN | Indonesia | PLTG Duri ex PLTG Sunyaragi Cent Java | WRI1000824 | 20.0 | -7.4064 | 109.5842 | Gas | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026057 | 83.33 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15713 | 15713 | IDN | Indonesia | PLTG Sunyaragi 1 2 3 4 | WRI1000855 | 80.0 | -7.4064 | 109.5842 | Gas | PLN – Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026057 | 333.33 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15694 | 15694 | IDN | Indonesia | PB. Sudirman/Mrica | WRI1000800 | 180.9 | -7.3927 | 109.6054 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026120 | 574.49 | 398.71 | 459.9 | 565.77 | 567.57 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15786 | 15786 | IDN | Indonesia | Pejengkolan/Mrica | WRI1000801 | 1.4 | -7.5694 | 109.8006 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026121 | 2.83 | 2.23 | 2.96 | 3.02 | 3.01 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15661 | 15661 | IDN | Indonesia | Dieng | WRI1000752 | 60.0 | -7.2061 | 109.9119 | Geothermal | PT. Geo Dipa Energy | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1018473 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15674 | 15674 | IDN | Indonesia | Ketapang Smelter power station | WRI1075808 | 80.0 | -2.3662 | 110.1573 | Coal | 2016.0 | PT Well Harvest Winning Alumina Refinery | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 435.35 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15799 | 15799 | IDN | Indonesia | Sidorejo/Mrica | WRI1001013 | 1.4 | -7.4764 | 110.2622 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1050222 | 3.78 | 3.83 | 4.47 | 3.98 | 4.23 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15813 | 15813 | IDN | Indonesia | Timo / Mrica | WRI1001035 | 12.0 | -6.9485 | 110.4069 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026168 | 36.17 | 27.97 | 34.2 | 37.89 | 37.79 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15775 | 15775 | IDN | Indonesia | PLTU Tambak Lorok | WRI1000984 | 300.0 | -6.9507 | 110.4304 | Coal | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026156 | 1632.59 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15731 | 15731 | IDN | Indonesia | PLTGU Tambak Lorok | WRI1000887 | 1034.0 | -6.9505 | 110.434 | Gas | PLN – Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026156 | 4308.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15778 | 15778 | IDN | Indonesia | PLTU Tanjung Jati B | WRI1000990 | 1320.0 | -6.446 | 110.7423 | Coal | PT. Central Java Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1052927 | 7183.4 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15779 | 15779 | IDN | Indonesia | PLTU Tanjung Jati B - expansion | WRI1000991 | 1324.0 | -6.446 | 110.7423 | Coal | PT. Central Java Power (EPC : Korea Midland Power Co) | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1052927 | 7205.17 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 |
Advanced export
JSON shape: default, array, newline-delimited
CREATE TABLE "global-power-plants" ( "country" TEXT, "country_long" TEXT, "name" TEXT, "gppd_idnr" TEXT, "capacity_mw" REAL, "latitude" REAL, "longitude" REAL, "primary_fuel" TEXT, "other_fuel1" TEXT, "other_fuel2" TEXT, "other_fuel3" TEXT, "commissioning_year" REAL, "owner" TEXT, "source" TEXT, "url" TEXT, "geolocation_source" TEXT, "wepp_id" TEXT, "year_of_capacity_data" INTEGER, "generation_gwh_2013" REAL, "generation_gwh_2014" REAL, "generation_gwh_2015" REAL, "generation_gwh_2016" REAL, "generation_gwh_2017" REAL, "generation_gwh_2018" REAL, "generation_gwh_2019" REAL, "generation_data_source" TEXT, "estimated_generation_gwh_2013" REAL, "estimated_generation_gwh_2014" REAL, "estimated_generation_gwh_2015" REAL, "estimated_generation_gwh_2016" REAL, "estimated_generation_gwh_2017" REAL, "estimated_generation_note_2013" TEXT, "estimated_generation_note_2014" TEXT, "estimated_generation_note_2015" TEXT, "estimated_generation_note_2016" TEXT, "estimated_generation_note_2017" TEXT ); CREATE INDEX ["global-power-plants_country_long"] ON [global-power-plants]("country_long"); CREATE INDEX ["global-power-plants_owner"] ON [global-power-plants]("owner");