global-power-plants
Data license: CC Attribution 4.0 License · Data source: World Resources Institute · About: global-power-plants-datasette
178 rows where country_long = "Indonesia" sorted by longitude descending
This data as json, CSV (advanced)
Suggested facets: commissioning_year, source, url, geolocation_source, estimated_generation_note_2013, estimated_generation_note_2014, estimated_generation_note_2015, estimated_generation_note_2016, estimated_generation_note_2017
owner >30
- PLN - PT. Indonesia Power 16
- PLN - Java Bali Generation Unit / PT. PJB 13
- PLN 11
- PLN-South Sumatera Generation Unit 11
- PT. Indonesia Power 8
- PLN-South&South East Sulawesi Regional Unit 6
- PLN – Indonesia Power 5
- PLN – Java Bali Generation Unit / PT. PJB 5
- PT PLN Persero 5
- PT. PJB 4
- PLN / KITSUMBAGUT 3
- Anggreko International - rental 2
- PLN - North Sumatera Generation Unit 2
- PLN-Nth & Ctrl Sulawesi & Gorontalo Reg Unit 2
- PT. Energy Sengkang 2
- PT. Inco 2
- PT. Indonesia Asahan aluminium 2
- BPPT + Pertamina 1
- INDONESIA POWER UNIT 1
- Indonesia Power 1
- PLN (EPC : PT. Bagus Karya Guangdong Power Engineering PT. Nincec Multi Dimensi) 1
- PLN (EPC : Sinohydro Co. Ltd) 1
- PLN (EPC: CNTIC (China National Tecnical Import Corporation)) 1
- PLN + China National Electric Engineering Co. Ltd. (CNEEC) 1
- PLN + Dongfang Electrik Corp PT Dalle Energy 1
- PLN + Pertamina Geothermal Energy 1
- PLN - East Kalimantan Regional Unit 1
- PLN - East Nusa Tenggara Regional Unit/NTT 1
- PLN - Maluku Regional Unit 1
- PLN - Pandan Sector 1
- …
primary_fuel 5
- Coal 70
- Gas 41
- Hydro 41
- Oil 16
- Geothermal 10
country_long 1
- Indonesia · 178 ✖
Link | rowid | country | country_long | name | gppd_idnr | capacity_mw | latitude | longitude ▲ | primary_fuel | other_fuel1 | other_fuel2 | other_fuel3 | commissioning_year | owner | source | url | geolocation_source | wepp_id | year_of_capacity_data | generation_gwh_2013 | generation_gwh_2014 | generation_gwh_2015 | generation_gwh_2016 | generation_gwh_2017 | generation_gwh_2018 | generation_gwh_2019 | generation_data_source | estimated_generation_gwh_2013 | estimated_generation_gwh_2014 | estimated_generation_gwh_2015 | estimated_generation_gwh_2016 | estimated_generation_gwh_2017 | estimated_generation_note_2013 | estimated_generation_note_2014 | estimated_generation_note_2015 | estimated_generation_note_2016 | estimated_generation_note_2017 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
15642 | 15642 | IDN | Indonesia | Amamapare Port power station | WRI1075798 | 195.0 | -4.8278 | 136.8391 | Coal | 1998.0 | PT Puncakjaya Power | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 1061.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15671 | 15671 | IDN | Indonesia | Kayu Merah - Ternate | WRI1000769 | 21.084 | 0.8 | 127.4 | Oil | PLN - Maluku Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1093482 | 38.05 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15653 | 15653 | IDN | Indonesia | Bitung - Menado | WRI1000746 | 56.62 | 1.4451 | 125.1824 | Oil | PLN-Nth & Ctrl Sulawesi & Gorontalo Reg Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 102.2 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15679 | 15679 | IDN | Indonesia | Lahendong (Binary Cycle) | WRI1000777 | 20.0 | 1.3346 | 124.8392 | Geothermal | BPPT + Pertamina | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026087 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15680 | 15680 | IDN | Indonesia | Lahendong IV | WRI1000778 | 80.0 | 1.2542 | 124.8225 | Geothermal | PLN + Pertamina Geothermal Energy | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1087858 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15644 | 15644 | IDN | Indonesia | Amurang power station | WRI1075799 | 60.0 | 1.1825 | 124.4806 | Coal | 2012.0 | PLN | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 326.51 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15812 | 15812 | IDN | Indonesia | Tenau Kupang | WRI1001033 | 34.73 | -10.1667 | 123.5833 | Oil | PLN - East Nusa Tenggara Regional Unit/NTT | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026086 | 62.69 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15690 | 15690 | IDN | Indonesia | Minahasa - rental | WRI1000791 | 35.0 | -1.4789 | 122.3858 | Oil | PLN - rental | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026100 | 63.17 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15804 | 15804 | IDN | Indonesia | Sulawesi Mining power station | WRI1075816 | 280.0 | -2.8274 | 122.1553 | Coal | 2016.0 | Sulawesi Mining Investment | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 1523.75 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15683 | 15683 | IDN | Indonesia | Larona | WRI1000780 | 165.0 | -2.8194 | 121.5783 | Hydro | PT. Inco | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1025949 | 487.39 | 423.65 | 445.46 | 510.49 | 460.54 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15647 | 15647 | IDN | Indonesia | Balambano | WRI1000739 | 130.0 | -2.5213 | 121.357 | Hydro | PT. Inco | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1025948 | 338.09 | 252.07 | 306.96 | 344.3 | 354.37 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15742 | 15742 | IDN | Indonesia | PLTU Bilibili | WRI1000918 | 2.0 | -2.5213 | 121.357 | Coal | PLN-South&South East Sulawesi Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 10.88 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15748 | 15748 | IDN | Indonesia | PLTU Hendratna | WRI1000932 | 5.0 | -2.5213 | 121.357 | Coal | PT. Hendratna Plywood | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 27.2 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15752 | 15752 | IDN | Indonesia | PLTU Kaur | WRI1000943 | 200.0 | -2.5213 | 121.357 | Coal | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1088.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15753 | 15753 | IDN | Indonesia | PLTU Keramasan | WRI1000945 | 25.0 | -2.5213 | 121.357 | Coal | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026111 | 136.04 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15754 | 15754 | IDN | Indonesia | PLTU Kupang | WRI1000947 | 30.0 | -2.5213 | 121.357 | Coal | PT. Indonesia Power & electrindo Perkasa Utama | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026086 | 163.25 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15756 | 15756 | IDN | Indonesia | PLTU Lati | WRI1000949 | 14.0 | -2.5213 | 121.357 | Coal | PLN - East Kalimantan Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1088444 | 76.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15757 | 15757 | IDN | Indonesia | PLTU Listrindo | WRI1000950 | 2.5 | -2.5213 | 121.357 | Coal | PT. Listrindo (IPP) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 13.6 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15762 | 15762 | IDN | Indonesia | PLTU Pakerin | WRI1000965 | 34.0 | -2.5213 | 121.357 | Coal | PT. Pakerin (pulp industry) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 185.02 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15767 | 15767 | IDN | Indonesia | PLTU Rancong | WRI1000974 | 30.0 | -2.5213 | 121.357 | Coal | PT. Jorindo Aceh Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 163.25 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15768 | 15768 | IDN | Indonesia | PLTU Sanggau | WRI1000975 | 14.0 | -2.5213 | 121.357 | Coal | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1102412 | 76.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15772 | 15772 | IDN | Indonesia | PLTU Suparma | WRI1000981 | 27.0 | -2.5213 | 121.357 | Coal | PT. Suparma (pulp industry) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 146.93 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15774 | 15774 | IDN | Indonesia | PLTU Tabalong | WRI1000983 | 60.0 | -2.5213 | 121.357 | Coal | PT. Makmur Sejahtera Wisesa (owned by PT. Adaro) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 326.51 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15776 | 15776 | IDN | Indonesia | PLTU Tanjung Alam Perkasa | WRI1000985 | 7.5 | -2.5213 | 121.357 | Coal | PT. Tanjung Alam Perkasa | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 40.81 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15673 | 15673 | IDN | Indonesia | Kendari - Rental | WRI1000771 | 36.3 | 1.0591 | 120.798 | Oil | PLN - Rental | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026082 | 65.52 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15735 | 15735 | IDN | Indonesia | PLTU - Palu - Mpanau - Tawaeli | WRI1000906 | 30.0 | -0.8917 | 119.8707 | Coal | PT. Pusaka Jaya Palu Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 163.25 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15801 | 15801 | IDN | Indonesia | Silae | WRI1001015 | 43.7 | -0.8917 | 119.8707 | Oil | PLN-Nth & Ctrl Sulawesi & Gorontalo Reg Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026112 | 78.88 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15770 | 15770 | IDN | Indonesia | PLTU Sulawesi Selatan - Barru/FTP1 | WRI1000979 | 100.0 | -4.2931 | 119.6326 | Coal | PLN-South&South East Sulawesi Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 544.19 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15805 | 15805 | IDN | Indonesia | Suppa - Pare pare | WRI1001020 | 60.0 | -4.0135 | 119.6255 | Oil | PT. Makasar Power (Alsons Power Holdings Corp + Toyota Tsusho Corp/Tomen + Singapore Power) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026118 | 108.3 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15784 | 15784 | IDN | Indonesia | PLTU Tonasa II (Boiler Turbine Generator) | WRI1000999 | 70.0 | -4.7846 | 119.6163 | Coal | PT. Semen Gresik Tbk/PT. Semen Indonesia | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 380.93 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15646 | 15646 | IDN | Indonesia | Bakaru | WRI1000738 | 126.0 | -3.1141 | 119.6042 | Hydro | PLN-South&South East Sulawesi Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026035 | 423.6 | 334.58 | 350.67 | 415.34 | 424.69 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15652 | 15652 | IDN | Indonesia | Bili bili | WRI1000745 | 20.1 | -5.2779 | 119.5817 | Hydro | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1092163 | 60.04 | 44.78 | 55.22 | 61.21 | 62.74 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15736 | 15736 | IDN | Indonesia | PLTU -Jeneponto I & II | WRI1000907 | 250.0 | -5.6184 | 119.5506 | Coal | PT Bosowa Energy | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1360.49 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15712 | 15712 | IDN | Indonesia | PLTG Sengkang/Wajo | WRI1000849 | 180.0 | -5.14 | 119.4221 | Gas | PT. Energy Sengkang | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1025923 | 750.01 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15715 | 15715 | IDN | Indonesia | PLTG Tello | WRI1000859 | 123.0 | -5.14 | 119.4221 | Gas | PLN-South&South East Sulawesi Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026174 | 512.5 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15730 | 15730 | IDN | Indonesia | PLTGU Sengkang/Wajo | WRI1000886 | 135.0 | -5.14 | 119.4221 | Gas | PT. Energy Sengkang | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1025923 | 562.5 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15783 | 15783 | IDN | Indonesia | PLTU Tello | WRI1000997 | 25.0 | -5.14 | 119.4221 | Coal | PLN-South&South East Sulawesi Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 136.04 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15811 | 15811 | IDN | Indonesia | Tello | WRI1001031 | 50.092 | -5.14 | 119.4221 | Oil | PLN-South&South East Sulawesi Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026174 | 90.42 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15733 | 15733 | IDN | Indonesia | PLTMG Pulau Bunyu | WRI1000898 | 2.0 | 3.5 | 117.8333 | Gas | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 8.33 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15714 | 15714 | IDN | Indonesia | PLTG Tarakan | WRI1000858 | 23.0 | 3.3 | 117.6333 | Gas | PT. Cahaya Sakti | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1064213 | 95.83 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15717 | 15717 | IDN | Indonesia | PLTGB Tanjung Batu | WRI1000868 | 2.0 | -0.5 | 117.15 | Gas | PLN – sewa | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1050072 | 8.33 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15746 | 15746 | IDN | Indonesia | PLTU Embalut - Tanjung Batu | WRI1000925 | 50.0 | -0.5 | 117.15 | Coal | PT. Cahaya Fajar Kaltim | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1058260 | 272.09 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15668 | 15668 | IDN | Indonesia | Kaltim Teluk Balikpapan power station | WRI1075806 | 220.0 | -1.1704 | 116.7887 | Coal | 2015.0 | PLN | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 1197.23 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15649 | 15649 | IDN | Indonesia | Batu Hijau power station | WRI1075801 | 124.0 | -8.9012 | 116.7382 | Coal | 1999.0 | Pt Newmont Nusa Tenggara | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 674.8 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15643 | 15643 | IDN | Indonesia | Ampenan | WRI1000736 | 56.284 | -8.5667 | 116.0667 | Oil | PLN - West Nusa Tenggara Regional Unit/NTB | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026032 | 101.59 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15710 | 15710 | IDN | Indonesia | PLTG Pesanggaran | WRI1000845 | 122.0 | -8.7157 | 115.214 | Gas | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026037 | 508.34 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15790 | 15790 | IDN | Indonesia | Pesanggaran | WRI1000803 | 75.78 | -8.7157 | 115.214 | Oil | INDONESIA POWER UNIT | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026037 | 136.79 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15791 | 15791 | IDN | Indonesia | Pesanggaran BOO | WRI1000804 | 75.0 | -8.7157 | 115.214 | Oil | Anggreko International - rental | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026037 | 135.38 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15792 | 15792 | IDN | Indonesia | Pesanggaran BOT | WRI1000805 | 51.0 | -8.7157 | 115.214 | Oil | Anggreko International - rental | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026037 | 92.06 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15737 | 15737 | IDN | Indonesia | PLTU Asam-asam 1 & 2 | WRI1000910 | 260.0 | -3.9253 | 115.1043 | Coal | PLN - South Kalimantan Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1414.91 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15709 | 15709 | IDN | Indonesia | PLTG Pemaron | WRI1000844 | 97.0 | -8.1189 | 115.0887 | Gas | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1054581 | 404.17 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15788 | 15788 | IDN | Indonesia | Pemaron BOO | WRI1000802 | 45.0 | -8.1189 | 115.0887 | Oil | PT. Cogindo DayaBersama - rental | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1054581 | 81.23 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15795 | 15795 | IDN | Indonesia | Riam Kanan/pangeran Muhamad Nur | WRI1001004 | 30.0 | -3.5156 | 115.0074 | Hydro | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 102.63 | 81.56 | 87.65 | 97.75 | 102.52 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | ||||||||||||||
15654 | 15654 | IDN | Indonesia | Celukan Bawang power station | WRI1075802 | 381.0 | -8.1963 | 114.8516 | Coal | 2015.0 | PT General Energy Bali | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 2073.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15701 | 15701 | IDN | Indonesia | PLTG Gilimanuk | WRI1000825 | 133.0 | -8.1716 | 114.4344 | Gas | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1050217 | 554.17 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15667 | 15667 | IDN | Indonesia | Kalteng-1 Pulang Pisau power station | WRI1075805 | 120.0 | -2.8226 | 114.2088 | Coal | 2015.0 | PT PLN Persero | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 653.03 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15761 | 15761 | IDN | Indonesia | PLTU Paiton I Unit 7 & 8 | WRI1000941 | 5355.0 | -7.7184 | 113.5827 | Coal | PT. Paiton Energy Corp | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026016 | 29141.78 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15702 | 15702 | IDN | Indonesia | PLTG Grati | WRI1000829 | 302.0 | -7.6517 | 113.0244 | Gas | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026069 | 1258.35 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15721 | 15721 | IDN | Indonesia | PLTGU Grati | WRI1000875 | 461.0 | -7.6517 | 113.0244 | Gas | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026069 | 1920.86 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15765 | 15765 | IDN | Indonesia | PLTU Perak | WRI1000970 | 100.0 | -7.2492 | 112.7508 | Coal | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 544.19 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15703 | 15703 | IDN | Indonesia | PLTG Gresik | WRI1000830 | 80.0 | -7.1633 | 112.6615 | Gas | PLN – Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026070 | 333.33 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15722 | 15722 | IDN | Indonesia | PLTGU Gresik | WRI1000876 | 1579.0 | -7.1633 | 112.6615 | Gas | PLN – Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026070 | 6579.26 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15747 | 15747 | IDN | Indonesia | PLTU Gresik | WRI1000929 | 600.0 | -7.1633 | 112.6615 | Coal | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026070 | 3265.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15798 | 15798 | IDN | Indonesia | Sengguruh - Brantas | WRI1001010 | 29.0 | -8.1764 | 112.551 | Hydro | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026143 | 99.96 | 68.14 | 80.5 | 104.17 | 99.98 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15806 | 15806 | IDN | Indonesia | Sutami / Karangkates - Brantas | WRI1001021 | 105.0 | -8.1606 | 112.4443 | Hydro | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026154 | 371.79 | 266.78 | 301.33 | 387.04 | 371.86 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15688 | 15688 | IDN | Indonesia | Mendalan - Brantas | WRI1000788 | 23.0 | -7.854 | 112.3316 | Hydro | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026099 | 89.18 | 64.91 | 69.64 | 87.87 | 83.64 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15818 | 15818 | IDN | Indonesia | Wlingi - Brantas | WRI1001045 | 54.0 | -8.0776 | 112.3311 | Hydro | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026178 | 158.18 | 138.62 | 149.71 | 161.31 | 165.44 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15819 | 15819 | IDN | Indonesia | Wonorejo - Pamekasan | WRI1001046 | 6.3 | -8.1136 | 112.2869 | Hydro | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1055424 | 24.89 | 17.37 | 21.45 | 26.43 | 24.77 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15685 | 15685 | IDN | Indonesia | Lodoyo - Brantas | WRI1000783 | 4.5 | -8.1613 | 112.2173 | Hydro | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026092 | 17.16 | 12.97 | 15.44 | 18.26 | 17.08 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15809 | 15809 | IDN | Indonesia | Tanjung Awar-Awar power station | WRI1075817 | 700.0 | -6.8105 | 111.9955 | Coal | 2012.0 | PT PLN Persero | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 3809.38 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15814 | 15814 | IDN | Indonesia | Tulungagung - Brantas | WRI1001038 | 36.0 | -8.0657 | 111.9025 | Hydro | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026172 | 125.46 | 98.39 | 106.37 | 124.04 | 132.82 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15662 | 15662 | IDN | Indonesia | Giringan - Pamekasan | WRI1000755 | 3.2 | -7.7201 | 111.6715 | Hydro | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026067 | 6.65 | 6.55 | 7.17 | 7.1 | 7.08 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15692 | 15692 | IDN | Indonesia | Ngebel - Pamekasan | WRI1000793 | 2.2 | -7.7891 | 111.6167 | Hydro | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026106 | 7.89 | 7.12 | 8.26 | 8.38 | 7.91 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15763 | 15763 | IDN | Indonesia | PLTU Pangkalan Bun | WRI1000966 | 14.0 | -2.6833 | 111.6167 | Coal | PT. Energi Listrik Indonesia (subsidiary of PT. Eksploitasi Energi Indonesia) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026115 | 76.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15751 | 15751 | IDN | Indonesia | PLTU Jawa Tengah 1 - Rembang | WRI1000940 | 630.0 | -6.636 | 111.4749 | Coal | PLN(EPC : Zeland-Priamanaya-Tronoh) | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1065762 | 3428.44 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15785 | 15785 | IDN | Indonesia | Pacitan power station | WRI1075812 | 630.0 | -8.2578 | 111.3736 | Coal | 2011.0 | PT PLN Persero | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 3428.44 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15663 | 15663 | IDN | Indonesia | Golang - Pamekasan | WRI1000756 | 2.7 | -8.1408 | 111.1317 | Hydro | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026068 | 9.34 | 6.6 | 8.09 | 9.68 | 9.64 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15676 | 15676 | IDN | Indonesia | Klambu/Mrica | WRI1000773 | 1.117 | -7.0069 | 110.7964 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 3.78 | 3.34 | 3.9 | 3.88 | 3.58 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | ||||||||||||||
15778 | 15778 | IDN | Indonesia | PLTU Tanjung Jati B | WRI1000990 | 1320.0 | -6.446 | 110.7423 | Coal | PT. Central Java Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1052927 | 7183.4 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15779 | 15779 | IDN | Indonesia | PLTU Tanjung Jati B - expansion | WRI1000991 | 1324.0 | -6.446 | 110.7423 | Coal | PT. Central Java Power (EPC : Korea Midland Power Co) | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1052927 | 7205.17 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15731 | 15731 | IDN | Indonesia | PLTGU Tambak Lorok | WRI1000887 | 1034.0 | -6.9505 | 110.434 | Gas | PLN – Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026156 | 4308.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15775 | 15775 | IDN | Indonesia | PLTU Tambak Lorok | WRI1000984 | 300.0 | -6.9507 | 110.4304 | Coal | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026156 | 1632.59 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15813 | 15813 | IDN | Indonesia | Timo / Mrica | WRI1001035 | 12.0 | -6.9485 | 110.4069 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026168 | 36.17 | 27.97 | 34.2 | 37.89 | 37.79 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15799 | 15799 | IDN | Indonesia | Sidorejo/Mrica | WRI1001013 | 1.4 | -7.4764 | 110.2622 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1050222 | 3.78 | 3.83 | 4.47 | 3.98 | 4.23 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15674 | 15674 | IDN | Indonesia | Ketapang Smelter power station | WRI1075808 | 80.0 | -2.3662 | 110.1573 | Coal | 2016.0 | PT Well Harvest Winning Alumina Refinery | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 435.35 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15661 | 15661 | IDN | Indonesia | Dieng | WRI1000752 | 60.0 | -7.2061 | 109.9119 | Geothermal | PT. Geo Dipa Energy | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1018473 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15786 | 15786 | IDN | Indonesia | Pejengkolan/Mrica | WRI1000801 | 1.4 | -7.5694 | 109.8006 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026121 | 2.83 | 2.23 | 2.96 | 3.02 | 3.01 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15694 | 15694 | IDN | Indonesia | PB. Sudirman/Mrica | WRI1000800 | 180.9 | -7.3927 | 109.6054 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026120 | 574.49 | 398.71 | 459.9 | 565.77 | 567.57 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15695 | 15695 | IDN | Indonesia | PLTG (ex PLTD Sunyaragi) | WRI1000809 | 18.0 | -7.4064 | 109.5842 | Gas | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026057 | 75.0 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15700 | 15700 | IDN | Indonesia | PLTG Duri ex PLTG Sunyaragi Cent Java | WRI1000824 | 20.0 | -7.4064 | 109.5842 | Gas | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026057 | 83.33 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15713 | 15713 | IDN | Indonesia | PLTG Sunyaragi 1 2 3 4 | WRI1000855 | 80.0 | -7.4064 | 109.5842 | Gas | PLN – Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026057 | 333.33 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15797 | 15797 | IDN | Indonesia | Sempor/Mrica | WRI1001009 | 1.0 | -7.4733 | 109.3331 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1050218 | 3.35 | 3.45 | 3.96 | 3.31 | 3.53 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15675 | 15675 | IDN | Indonesia | Ketenger / mrica | WRI1000772 | 8.04 | -7.5097 | 109.2778 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1050220 | 33.59 | 25.5 | 29.83 | 35.02 | 32.34 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15657 | 15657 | IDN | Indonesia | Cilacap Sumber power station | WRI1075804 | 1260.0 | -7.6832 | 109.0964 | Coal | 2011.0 | Sumber Segara Primadaya | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 6856.89 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15744 | 15744 | IDN | Indonesia | PLTU Cilacap 1 & 2 | WRI1000920 | 600.0 | -7.7513 | 109.0186 | Coal | PT. Sumber Segara Primadaya | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1050225 | 3265.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15699 | 15699 | IDN | Indonesia | PLTG Cilacap | WRI1000822 | 55.0 | -7.7264 | 109.0094 | Gas | PLN – Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 229.17 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15716 | 15716 | IDN | Indonesia | PLTGB Singkawang | WRI1000867 | 9.0 | 0.9 | 109.0 | Gas | PLT – rented from PT. Krista Inti Persada | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1041391 | 37.5 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15745 | 15745 | IDN | Indonesia | PLTU Cirebon | WRI1000921 | 660.0 | -6.7704 | 108.6151 | Coal | PT. Cirebon Electric Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1066870 | 3591.7 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15750 | 15750 | IDN | Indonesia | PLTU Jawa Barat - Indramayu | WRI1000939 | 990.0 | -6.2747 | 107.9704 | Coal | PLN + China National Electric Engineering Co. Ltd. (CNEEC) | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1071378 | 5387.55 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15659 | 15659 | IDN | Indonesia | Darajat 1 | WRI1000750 | 55.0 | -7.2173 | 107.7394 | Geothermal | PLN – Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION |
Advanced export
JSON shape: default, array, newline-delimited
CREATE TABLE "global-power-plants" ( "country" TEXT, "country_long" TEXT, "name" TEXT, "gppd_idnr" TEXT, "capacity_mw" REAL, "latitude" REAL, "longitude" REAL, "primary_fuel" TEXT, "other_fuel1" TEXT, "other_fuel2" TEXT, "other_fuel3" TEXT, "commissioning_year" REAL, "owner" TEXT, "source" TEXT, "url" TEXT, "geolocation_source" TEXT, "wepp_id" TEXT, "year_of_capacity_data" INTEGER, "generation_gwh_2013" REAL, "generation_gwh_2014" REAL, "generation_gwh_2015" REAL, "generation_gwh_2016" REAL, "generation_gwh_2017" REAL, "generation_gwh_2018" REAL, "generation_gwh_2019" REAL, "generation_data_source" TEXT, "estimated_generation_gwh_2013" REAL, "estimated_generation_gwh_2014" REAL, "estimated_generation_gwh_2015" REAL, "estimated_generation_gwh_2016" REAL, "estimated_generation_gwh_2017" REAL, "estimated_generation_note_2013" TEXT, "estimated_generation_note_2014" TEXT, "estimated_generation_note_2015" TEXT, "estimated_generation_note_2016" TEXT, "estimated_generation_note_2017" TEXT ); CREATE INDEX ["global-power-plants_country_long"] ON [global-power-plants]("country_long"); CREATE INDEX ["global-power-plants_owner"] ON [global-power-plants]("owner");