global-power-plants
Data license: CC Attribution 4.0 License · Data source: World Resources Institute · About: global-power-plants-datasette
178 rows where country_long = "Indonesia" sorted by estimated_generation_note_2013
This data as json, CSV (advanced)
owner >30
- PLN 5
- PLN-South Sumatera Generation Unit 5
- PLN-South&South East Sulawesi Regional Unit 4
- PT PLN Persero 3
- Anggreko International - rental 2
- PLN - Java Bali Generation Unit / PT. PJB 2
- PLN - PT. Indonesia Power 2
- PLN – Java Bali Generation Unit / PT. PJB 2
- PT. Indonesia Power 2
- PT. PJB 2
- INDONESIA POWER UNIT 1
- Indonesia Power 1
- PLN (EPC : PT. Bagus Karya Guangdong Power Engineering PT. Nincec Multi Dimensi) 1
- PLN (EPC : Sinohydro Co. Ltd) 1
- PLN (EPC: CNTIC (China National Tecnical Import Corporation)) 1
- PLN + China National Electric Engineering Co. Ltd. (CNEEC) 1
- PLN + Dongfang Electrik Corp PT Dalle Energy 1
- PLN - East Kalimantan Regional Unit 1
- PLN - East Nusa Tenggara Regional Unit/NTT 1
- PLN - North Sumatera Generation Unit 1
- PLN - South Kalimantan Regional Unit 1
- PLN -.PT Indonesia Power 1
- PLN -.PT Indonesia Power - 2010 1
- PLN / 2010 1
- PLN – Indonesia Power 1
- PLN(EPC : Zeland-Priamanaya-Tronoh) 1
- PLN-Nth & Ctrl Sulawesi & Gorontalo Reg Unit 1
- PT BA for own use 1
- PT Bosowa Energy 1
- PT Indah Kiat Pulp & Paper 1
- …
primary_fuel 4
- Coal 56
- Gas 10
- Oil 10
- Geothermal 2
country_long 1
- Indonesia · 78 ✖
Link | rowid | country | country_long | name | gppd_idnr | capacity_mw | latitude | longitude | primary_fuel | other_fuel1 | other_fuel2 | other_fuel3 | commissioning_year | owner | source | url | geolocation_source | wepp_id | year_of_capacity_data | generation_gwh_2013 | generation_gwh_2014 | generation_gwh_2015 | generation_gwh_2016 | generation_gwh_2017 | generation_gwh_2018 | generation_gwh_2019 | generation_data_source | estimated_generation_gwh_2013 | estimated_generation_gwh_2014 | estimated_generation_gwh_2015 | estimated_generation_gwh_2016 | estimated_generation_gwh_2017 | estimated_generation_note_2013 ▼ | estimated_generation_note_2014 | estimated_generation_note_2015 | estimated_generation_note_2016 | estimated_generation_note_2017 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
15725 | 15725 | IDN | Indonesia | PLTGU Muara Karang repowering | WRI1000880 | 753.0 | -6.1087 | 106.7877 | Gas | PLN – Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026102 | 3137.54 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15726 | 15726 | IDN | Indonesia | PLTGU Muara Karang repowering Blok 2 | WRI1000881 | 210.0 | -6.1087 | 106.7877 | Gas | PLN – Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026102 | 875.01 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15727 | 15727 | IDN | Indonesia | PLTGU Muara Tawar Block 1 &2 | WRI1000882 | 920.0 | -6.0867 | 106.9987 | Gas | PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026103 | 3833.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15728 | 15728 | IDN | Indonesia | PLTGU Muara Tawar Block 5 | WRI1000883 | 384.0 | -6.0867 | 106.9987 | Gas | PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026103 | 1600.02 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15729 | 15729 | IDN | Indonesia | PLTGU Priok Block 1 2 | WRI1000885 | 1180.0 | -6.1102 | 106.8671 | Gas | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 4916.73 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15730 | 15730 | IDN | Indonesia | PLTGU Sengkang/Wajo | WRI1000886 | 135.0 | -5.14 | 119.4221 | Gas | PT. Energy Sengkang | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1025923 | 562.5 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15731 | 15731 | IDN | Indonesia | PLTGU Tambak Lorok | WRI1000887 | 1034.0 | -6.9505 | 110.434 | Gas | PLN – Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026156 | 4308.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15732 | 15732 | IDN | Indonesia | PLTMG Panaran | WRI1000894 | 24.0 | 0.1807 | 101.8444 | Gas | bright PLN Batam | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1060287 | 100.0 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15733 | 15733 | IDN | Indonesia | PLTMG Pulau Bunyu | WRI1000898 | 2.0 | 3.5 | 117.8333 | Gas | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 8.33 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15734 | 15734 | IDN | Indonesia | PLTMG Tj. Jabung | WRI1000904 | 8.0 | -1.0167 | 104.3667 | Gas | PT. Tanjung Jabung Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 33.33 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15735 | 15735 | IDN | Indonesia | PLTU - Palu - Mpanau - Tawaeli | WRI1000906 | 30.0 | -0.8917 | 119.8707 | Coal | PT. Pusaka Jaya Palu Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 163.25 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15736 | 15736 | IDN | Indonesia | PLTU -Jeneponto I & II | WRI1000907 | 250.0 | -5.6184 | 119.5506 | Coal | PT Bosowa Energy | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1360.49 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15737 | 15737 | IDN | Indonesia | PLTU Asam-asam 1 & 2 | WRI1000910 | 260.0 | -3.9253 | 115.1043 | Coal | PLN - South Kalimantan Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1414.91 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15738 | 15738 | IDN | Indonesia | PLTU Banjarsari/Merapi Timur-Lahat | WRI1000913 | 220.0 | -3.7241 | 103.6894 | Coal | PT. Bukit Pembangkit Inovatif (PT BA 59.75% PT PJB 29.15% dan PT Navigate Innovative Indonesia (PT NII) 11.1%) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1057264 | 1197.23 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15739 | 15739 | IDN | Indonesia | PLTU Banten 1 - Suralaya unit 8 | WRI1000914 | 625.0 | -6.0585 | 106.4646 | Coal | PLN -.PT Indonesia Power - 2010 | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026152 | 3401.23 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15740 | 15740 | IDN | Indonesia | PLTU Banten 2 - Labuhan | WRI1000915 | 600.0 | -6.3919 | 105.8288 | Coal | PLN / 2010 | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 3265.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15741 | 15741 | IDN | Indonesia | PLTU Banten 3 - Teluk Naga/Lontar | WRI1000916 | 945.0 | -6.0585 | 106.4646 | Coal | PLN + Dongfang Electrik Corp PT Dalle Energy | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 5142.66 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15742 | 15742 | IDN | Indonesia | PLTU Bilibili | WRI1000918 | 2.0 | -2.5213 | 121.357 | Coal | PLN-South&South East Sulawesi Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 10.88 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15743 | 15743 | IDN | Indonesia | PLTU Bukit Asam | WRI1000919 | 30.0 | -3.7316 | 103.7975 | Coal | PT BA for own use | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026052 | 163.25 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15744 | 15744 | IDN | Indonesia | PLTU Cilacap 1 & 2 | WRI1000920 | 600.0 | -7.7513 | 109.0186 | Coal | PT. Sumber Segara Primadaya | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1050225 | 3265.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15745 | 15745 | IDN | Indonesia | PLTU Cirebon | WRI1000921 | 660.0 | -6.7704 | 108.6151 | Coal | PT. Cirebon Electric Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1066870 | 3591.7 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15746 | 15746 | IDN | Indonesia | PLTU Embalut - Tanjung Batu | WRI1000925 | 50.0 | -0.5 | 117.15 | Coal | PT. Cahaya Fajar Kaltim | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1058260 | 272.09 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15747 | 15747 | IDN | Indonesia | PLTU Gresik | WRI1000929 | 600.0 | -7.1633 | 112.6615 | Coal | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026070 | 3265.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15748 | 15748 | IDN | Indonesia | PLTU Hendratna | WRI1000932 | 5.0 | -2.5213 | 121.357 | Coal | PT. Hendratna Plywood | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 27.2 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15749 | 15749 | IDN | Indonesia | PLTU Jabar Selatan - Pelabuhan Ratu | WRI1000938 | 1050.0 | -7.0242 | 106.5464 | Coal | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1066867 | 5714.07 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15750 | 15750 | IDN | Indonesia | PLTU Jawa Barat - Indramayu | WRI1000939 | 990.0 | -6.2747 | 107.9704 | Coal | PLN + China National Electric Engineering Co. Ltd. (CNEEC) | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1071378 | 5387.55 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15751 | 15751 | IDN | Indonesia | PLTU Jawa Tengah 1 - Rembang | WRI1000940 | 630.0 | -6.636 | 111.4749 | Coal | PLN(EPC : Zeland-Priamanaya-Tronoh) | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1065762 | 3428.44 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15752 | 15752 | IDN | Indonesia | PLTU Kaur | WRI1000943 | 200.0 | -2.5213 | 121.357 | Coal | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1088.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15753 | 15753 | IDN | Indonesia | PLTU Keramasan | WRI1000945 | 25.0 | -2.5213 | 121.357 | Coal | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026111 | 136.04 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15754 | 15754 | IDN | Indonesia | PLTU Kupang | WRI1000947 | 30.0 | -2.5213 | 121.357 | Coal | PT. Indonesia Power & electrindo Perkasa Utama | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026086 | 163.25 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15755 | 15755 | IDN | Indonesia | PLTU Labuhan Angin | WRI1000948 | 230.0 | 1.7176 | 98.7265 | Coal | PLN - North Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1066585 | 1251.65 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15756 | 15756 | IDN | Indonesia | PLTU Lati | WRI1000949 | 14.0 | -2.5213 | 121.357 | Coal | PLN - East Kalimantan Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1088444 | 76.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15757 | 15757 | IDN | Indonesia | PLTU Listrindo | WRI1000950 | 2.5 | -2.5213 | 121.357 | Coal | PT. Listrindo (IPP) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 13.6 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15758 | 15758 | IDN | Indonesia | PLTU Muara Karang | WRI1000954 | 400.0 | -6.1069 | 106.7882 | Coal | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026102 | 2176.79 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15759 | 15759 | IDN | Indonesia | PLTU NAD-Nagan Raya | WRI1000956 | 220.0 | 4.1089 | 96.1972 | Coal | PLN (EPC : Sinohydro Co. Ltd) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1073026 | 1197.23 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15760 | 15760 | IDN | Indonesia | PLTU Ombilin - Sijantang - Sawahlunto | WRI1000960 | 200.0 | -0.6094 | 100.7535 | Coal | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026107 | 1088.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15761 | 15761 | IDN | Indonesia | PLTU Paiton I Unit 7 & 8 | WRI1000941 | 5355.0 | -7.7184 | 113.5827 | Coal | PT. Paiton Energy Corp | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026016 | 29141.78 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15762 | 15762 | IDN | Indonesia | PLTU Pakerin | WRI1000965 | 34.0 | -2.5213 | 121.357 | Coal | PT. Pakerin (pulp industry) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 185.02 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15763 | 15763 | IDN | Indonesia | PLTU Pangkalan Bun | WRI1000966 | 14.0 | -2.6833 | 111.6167 | Coal | PT. Energi Listrik Indonesia (subsidiary of PT. Eksploitasi Energi Indonesia) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026115 | 76.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15764 | 15764 | IDN | Indonesia | PLTU Pangkalan Susu 1 & 2 | WRI1000967 | 400.0 | 4.1196 | 98.2555 | Coal | PLN (EPC : PT. Bagus Karya Guangdong Power Engineering PT. Nincec Multi Dimensi) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1079188 | 2176.79 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15765 | 15765 | IDN | Indonesia | PLTU Perak | WRI1000970 | 100.0 | -7.2492 | 112.7508 | Coal | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 544.19 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15766 | 15766 | IDN | Indonesia | PLTU Priok 3 & 4 | WRI1000972 | 100.0 | -6.1071 | 106.8716 | Coal | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 544.19 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15767 | 15767 | IDN | Indonesia | PLTU Rancong | WRI1000974 | 30.0 | -2.5213 | 121.357 | Coal | PT. Jorindo Aceh Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 163.25 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15768 | 15768 | IDN | Indonesia | PLTU Sanggau | WRI1000975 | 14.0 | -2.5213 | 121.357 | Coal | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1102412 | 76.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15769 | 15769 | IDN | Indonesia | PLTU Simpang Belimbing | WRI1000978 | 227.0 | -3.4 | 104.1158 | Coal | PT. Guo Hua Energy Musi Makmur | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1075907 | 1235.32 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15770 | 15770 | IDN | Indonesia | PLTU Sulawesi Selatan - Barru/FTP1 | WRI1000979 | 100.0 | -4.2931 | 119.6326 | Coal | PLN-South&South East Sulawesi Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 544.19 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15771 | 15771 | IDN | Indonesia | PLTU Sumbar - Teluk sirih Unit 1 | WRI1000980 | 112.0 | -1.0772 | 100.3727 | Coal | PLN (EPC: CNTIC (China National Tecnical Import Corporation)) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1066878 | 609.5 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15772 | 15772 | IDN | Indonesia | PLTU Suparma | WRI1000981 | 27.0 | -2.5213 | 121.357 | Coal | PT. Suparma (pulp industry) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 146.93 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15773 | 15773 | IDN | Indonesia | PLTU Suralaya | WRI1000982 | 3400.0 | -5.892 | 106.03 | Coal | PLN -.PT Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026152 | 18502.72 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15774 | 15774 | IDN | Indonesia | PLTU Tabalong | WRI1000983 | 60.0 | -2.5213 | 121.357 | Coal | PT. Makmur Sejahtera Wisesa (owned by PT. Adaro) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 326.51 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15775 | 15775 | IDN | Indonesia | PLTU Tambak Lorok | WRI1000984 | 300.0 | -6.9507 | 110.4304 | Coal | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026156 | 1632.59 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15776 | 15776 | IDN | Indonesia | PLTU Tanjung Alam Perkasa | WRI1000985 | 7.5 | -2.5213 | 121.357 | Coal | PT. Tanjung Alam Perkasa | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 40.81 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15777 | 15777 | IDN | Indonesia | PLTU Tanjung Enim -Bukit Asam | WRI1000988 | 260.0 | -3.7316 | 103.7975 | Coal | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1076783 | 1414.91 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15778 | 15778 | IDN | Indonesia | PLTU Tanjung Jati B | WRI1000990 | 1320.0 | -6.446 | 110.7423 | Coal | PT. Central Java Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1052927 | 7183.4 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15779 | 15779 | IDN | Indonesia | PLTU Tanjung Jati B - expansion | WRI1000991 | 1324.0 | -6.446 | 110.7423 | Coal | PT. Central Java Power (EPC : Korea Midland Power Co) | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1052927 | 7205.17 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15780 | 15780 | IDN | Indonesia | PLTU Tanjung Kasam | WRI1000992 | 110.0 | 1.0455 | 104.133 | Coal | PT. Tanjung Kasam Power Batam (PT. TJK Power) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1060288 | 598.61 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15781 | 15781 | IDN | Indonesia | PLTU Tarahan # 1 2 | WRI1000994 | 200.0 | -5.518 | 105.35 | Coal | Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026163 | 1088.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15782 | 15782 | IDN | Indonesia | PLTU Tarahan 3 & 4 - Sebalang | WRI1000995 | 200.0 | -5.518 | 105.35 | Coal | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1088.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15783 | 15783 | IDN | Indonesia | PLTU Tello | WRI1000997 | 25.0 | -5.14 | 119.4221 | Coal | PLN-South&South East Sulawesi Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 136.04 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15784 | 15784 | IDN | Indonesia | PLTU Tonasa II (Boiler Turbine Generator) | WRI1000999 | 70.0 | -4.7846 | 119.6163 | Coal | PT. Semen Gresik Tbk/PT. Semen Indonesia | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 380.93 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15785 | 15785 | IDN | Indonesia | Pacitan power station | WRI1075812 | 630.0 | -8.2578 | 111.3736 | Coal | 2011.0 | PT PLN Persero | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 3428.44 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15787 | 15787 | IDN | Indonesia | Pekanbaru Tenayan power station | WRI1075813 | 220.0 | 0.5644 | 101.5234 | Coal | 2016.0 | PT PLN Persero | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 1197.23 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15788 | 15788 | IDN | Indonesia | Pemaron BOO | WRI1000802 | 45.0 | -8.1189 | 115.0887 | Oil | PT. Cogindo DayaBersama - rental | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1054581 | 81.23 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15789 | 15789 | IDN | Indonesia | Perawang Mill power station | WRI1075814 | 755.0 | 0.6893 | 101.6191 | Coal | 2009.0 | PT Indah Kiat Pulp & Paper | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 4108.69 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15790 | 15790 | IDN | Indonesia | Pesanggaran | WRI1000803 | 75.78 | -8.7157 | 115.214 | Oil | INDONESIA POWER UNIT | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026037 | 136.79 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15791 | 15791 | IDN | Indonesia | Pesanggaran BOO | WRI1000804 | 75.0 | -8.7157 | 115.214 | Oil | Anggreko International - rental | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026037 | 135.38 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15792 | 15792 | IDN | Indonesia | Pesanggaran BOT | WRI1000805 | 51.0 | -8.7157 | 115.214 | Oil | Anggreko International - rental | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026037 | 92.06 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15794 | 15794 | IDN | Indonesia | Purwakarta Indorama Power Station | WRI1075815 | 60.0 | -6.5539 | 107.4137 | Coal | 2006.0 | PT Indorama Synthetics Tbk | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 326.51 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15801 | 15801 | IDN | Indonesia | Silae | WRI1001015 | 43.7 | -0.8917 | 119.8707 | Oil | PLN-Nth & Ctrl Sulawesi & Gorontalo Reg Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026112 | 78.88 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15804 | 15804 | IDN | Indonesia | Sulawesi Mining power station | WRI1075816 | 280.0 | -2.8274 | 122.1553 | Coal | 2016.0 | Sulawesi Mining Investment | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 1523.75 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15805 | 15805 | IDN | Indonesia | Suppa - Pare pare | WRI1001020 | 60.0 | -4.0135 | 119.6255 | Oil | PT. Makasar Power (Alsons Power Holdings Corp + Toyota Tsusho Corp/Tomen + Singapore Power) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026118 | 108.3 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15807 | 15807 | IDN | Indonesia | Talang Padang | WRI1001023 | 12.5 | -0.9492 | 100.3543 | Oil | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1093596 | 22.56 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15809 | 15809 | IDN | Indonesia | Tanjung Awar-Awar power station | WRI1075817 | 700.0 | -6.8105 | 111.9955 | Coal | 2012.0 | PT PLN Persero | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 3809.38 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15810 | 15810 | IDN | Indonesia | Tegineneng | WRI1001028 | 28.2 | -5.6015 | 104.7988 | Oil | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026165 | 50.9 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15811 | 15811 | IDN | Indonesia | Tello | WRI1001031 | 50.092 | -5.14 | 119.4221 | Oil | PLN-South&South East Sulawesi Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026174 | 90.42 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15812 | 15812 | IDN | Indonesia | Tenau Kupang | WRI1001033 | 34.73 | -10.1667 | 123.5833 | Oil | PLN - East Nusa Tenggara Regional Unit/NTT | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026086 | 62.69 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15816 | 15816 | IDN | Indonesia | Ulubelu 1 & 2 | WRI1001040 | 110.0 | -5.3096 | 104.5733 | Geothermal | PT. PLN | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1011547 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15817 | 15817 | IDN | Indonesia | Wayang Windu | WRI1001044 | 227.0 | -7.1966 | 107.6258 | Geothermal | PT. Star Energy | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1010414 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION |
Advanced export
JSON shape: default, array, newline-delimited
CREATE TABLE "global-power-plants" ( "country" TEXT, "country_long" TEXT, "name" TEXT, "gppd_idnr" TEXT, "capacity_mw" REAL, "latitude" REAL, "longitude" REAL, "primary_fuel" TEXT, "other_fuel1" TEXT, "other_fuel2" TEXT, "other_fuel3" TEXT, "commissioning_year" REAL, "owner" TEXT, "source" TEXT, "url" TEXT, "geolocation_source" TEXT, "wepp_id" TEXT, "year_of_capacity_data" INTEGER, "generation_gwh_2013" REAL, "generation_gwh_2014" REAL, "generation_gwh_2015" REAL, "generation_gwh_2016" REAL, "generation_gwh_2017" REAL, "generation_gwh_2018" REAL, "generation_gwh_2019" REAL, "generation_data_source" TEXT, "estimated_generation_gwh_2013" REAL, "estimated_generation_gwh_2014" REAL, "estimated_generation_gwh_2015" REAL, "estimated_generation_gwh_2016" REAL, "estimated_generation_gwh_2017" REAL, "estimated_generation_note_2013" TEXT, "estimated_generation_note_2014" TEXT, "estimated_generation_note_2015" TEXT, "estimated_generation_note_2016" TEXT, "estimated_generation_note_2017" TEXT ); CREATE INDEX ["global-power-plants_country_long"] ON [global-power-plants]("country_long"); CREATE INDEX ["global-power-plants_owner"] ON [global-power-plants]("owner");