global-power-plants
Data license: CC Attribution 4.0 License · Data source: World Resources Institute · About: global-power-plants-datasette
178 rows where country_long = "Indonesia" sorted by owner
This data as json, CSV (advanced)
owner >30
- PT. Indonesia Power 8
- PT PLN Persero 5
- PT. PJB 4
- PT. Energy Sengkang 2
- PT. Inco 2
- PT. Indonesia Asahan aluminium 2
- PLT – rented from PT. Krista Inti Persada 1
- PT Asta Keramasan Energy (AKE) 1
- PT BA for own use 1
- PT Bajradaya Sentranusa (China Huadian Corporation 70% + PJB 26.5%+Nusa Konstruksi Engineering 3.5%) 1
- PT Bosowa Energy 1
- PT Cikarang Listrindo 1
- PT Gahapi Nisco Steel 1
- PT General Energy Bali 1
- PT Indah Kiat Pulp & Paper 1
- PT Indorama Synthetics Tbk 1
- PT Lestari Baten Energi (LBE) 1
- PT Mandau Cipta Tenaga Nusanatara (subsidiary of Chevron) 1
- PT Merak Energi 1
- PT Primanaya Energi 1
- PT Puncakjaya Power 1
- PT Well Harvest Winning Alumina Refinery 1
- PT. Bekasi Power/PT. Kawasan Industri Jababeka Tbk 1
- PT. Bukit Pembangkit Inovatif (PT BA 59.75% PT PJB 29.15% dan PT Navigate Innovative Indonesia (PT NII) 11.1%) 1
- PT. Cahaya Fajar Kaltim 1
- PT. Cahaya Sakti 1
- PT. Central Java Power 1
- PT. Central Java Power (EPC : Korea Midland Power Co) 1
- PT. Chevron Geothermal Darajat Ltd 1
- PT. Chevron Geothermal Salak Ltd 1
- …
primary_fuel 5
- Coal 41
- Gas 23
- Geothermal 6
- Hydro 6
- Oil 2
country_long 1
- Indonesia · 78 ✖
Link | rowid | country | country_long | name | gppd_idnr | capacity_mw | latitude | longitude | primary_fuel | other_fuel1 | other_fuel2 | other_fuel3 | commissioning_year | owner ▼ | source | url | geolocation_source | wepp_id | year_of_capacity_data | generation_gwh_2013 | generation_gwh_2014 | generation_gwh_2015 | generation_gwh_2016 | generation_gwh_2017 | generation_gwh_2018 | generation_gwh_2019 | generation_data_source | estimated_generation_gwh_2013 | estimated_generation_gwh_2014 | estimated_generation_gwh_2015 | estimated_generation_gwh_2016 | estimated_generation_gwh_2017 | estimated_generation_note_2013 | estimated_generation_note_2014 | estimated_generation_note_2015 | estimated_generation_note_2016 | estimated_generation_note_2017 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
15716 | 15716 | IDN | Indonesia | PLTGB Singkawang | WRI1000867 | 9.0 | 0.9 | 109.0 | Gas | PLT – rented from PT. Krista Inti Persada | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1041391 | 37.5 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15704 | 15704 | IDN | Indonesia | PLTG Keramasan | WRI1000833 | 145.0 | -2.9167 | 104.7458 | Gas | PT Asta Keramasan Energy (AKE) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026111 | 604.17 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15743 | 15743 | IDN | Indonesia | PLTU Bukit Asam | WRI1000919 | 30.0 | -3.7316 | 103.7975 | Coal | PT BA for own use | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026052 | 163.25 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15645 | 15645 | IDN | Indonesia | Asahan I | WRI1000737 | 180.0 | 2.5113 | 99.259 | Hydro | PT Bajradaya Sentranusa (China Huadian Corporation 70% + PJB 26.5%+Nusa Konstruksi Engineering 3.5%) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1076093 | 614.23 | 443.82 | 523.3 | 555.94 | 592.43 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15736 | 15736 | IDN | Indonesia | PLTU -Jeneponto I & II | WRI1000907 | 250.0 | -5.6184 | 119.5506 | Coal | PT Bosowa Energy | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1360.49 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15656 | 15656 | IDN | Indonesia | Cikarang Babelan power station | WRI1075803 | 280.0 | -6.1161 | 107.052 | Coal | 2017.0 | PT Cikarang Listrindo | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 1523.75 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15687 | 15687 | IDN | Indonesia | Medan Steel Mill Power Plant | WRI1075810 | 60.0 | 3.6676 | 98.6654 | Coal | 2017.0 | PT Gahapi Nisco Steel | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 326.51 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15654 | 15654 | IDN | Indonesia | Celukan Bawang power station | WRI1075802 | 381.0 | -8.1963 | 114.8516 | Coal | 2015.0 | PT General Energy Bali | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 2073.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15789 | 15789 | IDN | Indonesia | Perawang Mill power station | WRI1075814 | 755.0 | 0.6893 | 101.6191 | Coal | 2009.0 | PT Indah Kiat Pulp & Paper | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 4108.69 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15794 | 15794 | IDN | Indonesia | Purwakarta Indorama Power Station | WRI1075815 | 60.0 | -6.5539 | 107.4137 | Coal | 2006.0 | PT Indorama Synthetics Tbk | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 326.51 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15648 | 15648 | IDN | Indonesia | Banten Serang power station | WRI1075800 | 660.0 | -5.883 | 106.0459 | Coal | 2017.0 | PT Lestari Baten Energi (LBE) | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 3591.7 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15693 | 15693 | IDN | Indonesia | North Duri Cogeneration Plant | WRI1000794 | 300.0 | 1.3722 | 101.226 | Gas | PT Mandau Cipta Tenaga Nusanatara (subsidiary of Chevron) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1092378 | 1250.01 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15689 | 15689 | IDN | Indonesia | Merak power station | WRI1075811 | 120.0 | -5.884 | 106.0642 | Coal | 2014.0 | PT Merak Energi | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 653.03 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15667 | 15667 | IDN | Indonesia | Kalteng-1 Pulang Pisau power station | WRI1075805 | 120.0 | -2.8226 | 114.2088 | Coal | 2015.0 | PT PLN Persero | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 653.03 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15682 | 15682 | IDN | Indonesia | Lampung Sebalang power station | WRI1075809 | 200.0 | -5.5859 | 105.3872 | Coal | 2015.0 | PT PLN Persero | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 1088.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15785 | 15785 | IDN | Indonesia | Pacitan power station | WRI1075812 | 630.0 | -8.2578 | 111.3736 | Coal | 2011.0 | PT PLN Persero | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 3428.44 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15787 | 15787 | IDN | Indonesia | Pekanbaru Tenayan power station | WRI1075813 | 220.0 | 0.5644 | 101.5234 | Coal | 2016.0 | PT PLN Persero | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 1197.23 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15809 | 15809 | IDN | Indonesia | Tanjung Awar-Awar power station | WRI1075817 | 700.0 | -6.8105 | 111.9955 | Coal | 2012.0 | PT PLN Persero | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 3809.38 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15672 | 15672 | IDN | Indonesia | Keban Agung power station | WRI1075807 | 270.0 | -3.7515 | 103.6481 | Coal | 2015.0 | PT Primanaya Energi | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 1469.33 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15642 | 15642 | IDN | Indonesia | Amamapare Port power station | WRI1075798 | 195.0 | -4.8278 | 136.8391 | Coal | 1998.0 | PT Puncakjaya Power | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 1061.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15674 | 15674 | IDN | Indonesia | Ketapang Smelter power station | WRI1075808 | 80.0 | -2.3662 | 110.1573 | Coal | 2016.0 | PT Well Harvest Winning Alumina Refinery | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 435.35 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15718 | 15718 | IDN | Indonesia | PLTGU Bekasi Power | WRI1000870 | 130.0 | -6.2611 | 107.1528 | Gas | PT. Bekasi Power/PT. Kawasan Industri Jababeka Tbk | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1075035 | 541.67 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15738 | 15738 | IDN | Indonesia | PLTU Banjarsari/Merapi Timur-Lahat | WRI1000913 | 220.0 | -3.7241 | 103.6894 | Coal | PT. Bukit Pembangkit Inovatif (PT BA 59.75% PT PJB 29.15% dan PT Navigate Innovative Indonesia (PT NII) 11.1%) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1057264 | 1197.23 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15746 | 15746 | IDN | Indonesia | PLTU Embalut - Tanjung Batu | WRI1000925 | 50.0 | -0.5 | 117.15 | Coal | PT. Cahaya Fajar Kaltim | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1058260 | 272.09 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15714 | 15714 | IDN | Indonesia | PLTG Tarakan | WRI1000858 | 23.0 | 3.3 | 117.6333 | Gas | PT. Cahaya Sakti | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1064213 | 95.83 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15778 | 15778 | IDN | Indonesia | PLTU Tanjung Jati B | WRI1000990 | 1320.0 | -6.446 | 110.7423 | Coal | PT. Central Java Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1052927 | 7183.4 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15779 | 15779 | IDN | Indonesia | PLTU Tanjung Jati B - expansion | WRI1000991 | 1324.0 | -6.446 | 110.7423 | Coal | PT. Central Java Power (EPC : Korea Midland Power Co) | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1052927 | 7205.17 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15660 | 15660 | IDN | Indonesia | Darajat 2 3 | WRI1000751 | 215.0 | -7.2173 | 107.7394 | Geothermal | PT. Chevron Geothermal Darajat Ltd | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | |||||||||||||||||||
15665 | 15665 | IDN | Indonesia | Gunung Salak | WRI1000759 | 375.0 | -6.7416 | 106.648 | Geothermal | PT. Chevron Geothermal Salak Ltd | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026072 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15698 | 15698 | IDN | Indonesia | PLTG Cikarang Listrindo | WRI1000821 | 150.0 | -6.1133 | 106.7788 | Gas | PT. Cikarang Listrindo | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 625.0 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15745 | 15745 | IDN | Indonesia | PLTU Cirebon | WRI1000921 | 660.0 | -6.7704 | 108.6151 | Coal | PT. Cirebon Electric Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1066870 | 3591.7 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15788 | 15788 | IDN | Indonesia | Pemaron BOO | WRI1000802 | 45.0 | -8.1189 | 115.0887 | Oil | PT. Cogindo DayaBersama - rental | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1054581 | 81.23 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15763 | 15763 | IDN | Indonesia | PLTU Pangkalan Bun | WRI1000966 | 14.0 | -2.6833 | 111.6167 | Coal | PT. Energi Listrik Indonesia (subsidiary of PT. Eksploitasi Energi Indonesia) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026115 | 76.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15712 | 15712 | IDN | Indonesia | PLTG Sengkang/Wajo | WRI1000849 | 180.0 | -5.14 | 119.4221 | Gas | PT. Energy Sengkang | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1025923 | 750.01 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15730 | 15730 | IDN | Indonesia | PLTGU Sengkang/Wajo | WRI1000886 | 135.0 | -5.14 | 119.4221 | Gas | PT. Energy Sengkang | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1025923 | 562.5 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15661 | 15661 | IDN | Indonesia | Dieng | WRI1000752 | 60.0 | -7.2061 | 109.9119 | Geothermal | PT. Geo Dipa Energy | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1018473 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15769 | 15769 | IDN | Indonesia | PLTU Simpang Belimbing | WRI1000978 | 227.0 | -3.4 | 104.1158 | Coal | PT. Guo Hua Energy Musi Makmur | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1075907 | 1235.32 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15748 | 15748 | IDN | Indonesia | PLTU Hendratna | WRI1000932 | 5.0 | -2.5213 | 121.357 | Coal | PT. Hendratna Plywood | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 27.2 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15647 | 15647 | IDN | Indonesia | Balambano | WRI1000739 | 130.0 | -2.5213 | 121.357 | Hydro | PT. Inco | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1025948 | 338.09 | 252.07 | 306.96 | 344.3 | 354.37 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15683 | 15683 | IDN | Indonesia | Larona | WRI1000780 | 165.0 | -2.8194 | 121.5783 | Hydro | PT. Inco | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1025949 | 487.39 | 423.65 | 445.46 | 510.49 | 460.54 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15800 | 15800 | IDN | Indonesia | Sigura gura (asahan II) | WRI1001014 | 286.0 | 2.5196 | 99.2793 | Hydro | PT. Indonesia Asahan aluminium | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 870.63 | 615.78 | 742.08 | 800.14 | 835.99 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | ||||||||||||||
15808 | 15808 | IDN | Indonesia | Tangga (asahan II) | WRI1001024 | 317.0 | 2.5479 | 99.3028 | Hydro | PT. Indonesia Asahan aluminium | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1025945 | 965.0 | 682.53 | 822.52 | 886.87 | 926.6 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15701 | 15701 | IDN | Indonesia | PLTG Gilimanuk | WRI1000825 | 133.0 | -8.1716 | 114.4344 | Gas | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1050217 | 554.17 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15702 | 15702 | IDN | Indonesia | PLTG Grati | WRI1000829 | 302.0 | -7.6517 | 113.0244 | Gas | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026069 | 1258.35 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15709 | 15709 | IDN | Indonesia | PLTG Pemaron | WRI1000844 | 97.0 | -8.1189 | 115.0887 | Gas | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1054581 | 404.17 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15710 | 15710 | IDN | Indonesia | PLTG Pesanggaran | WRI1000845 | 122.0 | -8.7157 | 115.214 | Gas | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026037 | 508.34 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15711 | 15711 | IDN | Indonesia | PLTG Priok | WRI1000846 | 52.0 | -6.1071 | 106.8716 | Gas | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 216.66 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15721 | 15721 | IDN | Indonesia | PLTGU Grati | WRI1000875 | 461.0 | -7.6517 | 113.0244 | Gas | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026069 | 1920.86 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15729 | 15729 | IDN | Indonesia | PLTGU Priok Block 1 2 | WRI1000885 | 1180.0 | -6.1102 | 106.8671 | Gas | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 4916.73 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15766 | 15766 | IDN | Indonesia | PLTU Priok 3 & 4 | WRI1000972 | 100.0 | -6.1071 | 106.8716 | Coal | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 544.19 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15754 | 15754 | IDN | Indonesia | PLTU Kupang | WRI1000947 | 30.0 | -2.5213 | 121.357 | Coal | PT. Indonesia Power & electrindo Perkasa Utama | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026086 | 163.25 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15767 | 15767 | IDN | Indonesia | PLTU Rancong | WRI1000974 | 30.0 | -2.5213 | 121.357 | Coal | PT. Jorindo Aceh Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 163.25 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15723 | 15723 | IDN | Indonesia | PLTGU Krakatau Daya Listrik (KDL) | WRI1000878 | 400.0 | -5.9924 | 105.9849 | Gas | PT. Krakatau Daya Listrik | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1666.69 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15706 | 15706 | IDN | Indonesia | PLTG Krakatau Posco Energy | WRI1000835 | 200.0 | -6.0048 | 105.9961 | Gas | PT. Krakatau Posco Energy (JV : Korea Posco Energy (70%) + PT. Krakatau Daya Listrik (30%)) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 833.34 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15757 | 15757 | IDN | Indonesia | PLTU Listrindo | WRI1000950 | 2.5 | -2.5213 | 121.357 | Coal | PT. Listrindo (IPP) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 13.6 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15805 | 15805 | IDN | Indonesia | Suppa - Pare pare | WRI1001020 | 60.0 | -4.0135 | 119.6255 | Oil | PT. Makasar Power (Alsons Power Holdings Corp + Toyota Tsusho Corp/Tomen + Singapore Power) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026118 | 108.3 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15774 | 15774 | IDN | Indonesia | PLTU Tabalong | WRI1000983 | 60.0 | -2.5213 | 121.357 | Coal | PT. Makmur Sejahtera Wisesa (owned by PT. Adaro) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 326.51 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15707 | 15707 | IDN | Indonesia | PLTG Muara Tawar B-3 | WRI1000836 | 420.0 | -6.0867 | 106.9987 | Gas | PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026103 | 1750.02 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15708 | 15708 | IDN | Indonesia | PLTG Muara Tawar Block 4 | WRI1000837 | 420.0 | -6.0867 | 106.9987 | Gas | PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026103 | 1750.02 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15727 | 15727 | IDN | Indonesia | PLTGU Muara Tawar Block 1 &2 | WRI1000882 | 920.0 | -6.0867 | 106.9987 | Gas | PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026103 | 3833.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15728 | 15728 | IDN | Indonesia | PLTGU Muara Tawar Block 5 | WRI1000883 | 384.0 | -6.0867 | 106.9987 | Gas | PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026103 | 1600.02 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15816 | 15816 | IDN | Indonesia | Ulubelu 1 & 2 | WRI1001040 | 110.0 | -5.3096 | 104.5733 | Geothermal | PT. PLN | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1011547 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15761 | 15761 | IDN | Indonesia | PLTU Paiton I Unit 7 & 8 | WRI1000941 | 5355.0 | -7.7184 | 113.5827 | Coal | PT. Paiton Energy Corp | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026016 | 29141.78 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15762 | 15762 | IDN | Indonesia | PLTU Pakerin | WRI1000965 | 34.0 | -2.5213 | 121.357 | Coal | PT. Pakerin (pulp industry) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 185.02 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15670 | 15670 | IDN | Indonesia | Kamojang 4 | WRI1000765 | 60.0 | -6.4239 | 107.4553 | Geothermal | PT. Pertamina Geothermal Energy | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026079 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15735 | 15735 | IDN | Indonesia | PLTU - Palu - Mpanau - Tawaeli | WRI1000906 | 30.0 | -0.8917 | 119.8707 | Coal | PT. Pusaka Jaya Palu Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 163.25 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15784 | 15784 | IDN | Indonesia | PLTU Tonasa II (Boiler Turbine Generator) | WRI1000999 | 70.0 | -4.7846 | 119.6163 | Coal | PT. Semen Gresik Tbk/PT. Semen Indonesia | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 380.93 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15817 | 15817 | IDN | Indonesia | Wayang Windu | WRI1001044 | 227.0 | -7.1966 | 107.6258 | Geothermal | PT. Star Energy | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1010414 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15744 | 15744 | IDN | Indonesia | PLTU Cilacap 1 & 2 | WRI1000920 | 600.0 | -7.7513 | 109.0186 | Coal | PT. Sumber Segara Primadaya | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1050225 | 3265.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15772 | 15772 | IDN | Indonesia | PLTU Suparma | WRI1000981 | 27.0 | -2.5213 | 121.357 | Coal | PT. Suparma (pulp industry) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 146.93 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15776 | 15776 | IDN | Indonesia | PLTU Tanjung Alam Perkasa | WRI1000985 | 7.5 | -2.5213 | 121.357 | Coal | PT. Tanjung Alam Perkasa | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 40.81 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15734 | 15734 | IDN | Indonesia | PLTMG Tj. Jabung | WRI1000904 | 8.0 | -1.0167 | 104.3667 | Gas | PT. Tanjung Jabung Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 33.33 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15780 | 15780 | IDN | Indonesia | PLTU Tanjung Kasam | WRI1000992 | 110.0 | 1.0455 | 104.133 | Coal | PT. Tanjung Kasam Power Batam (PT. TJK Power) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1060288 | 598.61 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15666 | 15666 | IDN | Indonesia | Jatiluhur | WRI1000762 | 186.0 | -6.523 | 107.389 | Hydro | Perum Jasa Tirta II | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 670.77 | 452.3 | 524.85 | 671.81 | 664.17 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | ||||||||||||||
15649 | 15649 | IDN | Indonesia | Batu Hijau power station | WRI1075801 | 124.0 | -8.9012 | 116.7382 | Coal | 1999.0 | Pt Newmont Nusa Tenggara | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 674.8 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15804 | 15804 | IDN | Indonesia | Sulawesi Mining power station | WRI1075816 | 280.0 | -2.8274 | 122.1553 | Coal | 2016.0 | Sulawesi Mining Investment | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 1523.75 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15657 | 15657 | IDN | Indonesia | Cilacap Sumber power station | WRI1075804 | 1260.0 | -7.6832 | 109.0964 | Coal | 2011.0 | Sumber Segara Primadaya | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 6856.89 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15732 | 15732 | IDN | Indonesia | PLTMG Panaran | WRI1000894 | 24.0 | 0.1807 | 101.8444 | Gas | bright PLN Batam | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1060287 | 100.0 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 |
Advanced export
JSON shape: default, array, newline-delimited
CREATE TABLE "global-power-plants" ( "country" TEXT, "country_long" TEXT, "name" TEXT, "gppd_idnr" TEXT, "capacity_mw" REAL, "latitude" REAL, "longitude" REAL, "primary_fuel" TEXT, "other_fuel1" TEXT, "other_fuel2" TEXT, "other_fuel3" TEXT, "commissioning_year" REAL, "owner" TEXT, "source" TEXT, "url" TEXT, "geolocation_source" TEXT, "wepp_id" TEXT, "year_of_capacity_data" INTEGER, "generation_gwh_2013" REAL, "generation_gwh_2014" REAL, "generation_gwh_2015" REAL, "generation_gwh_2016" REAL, "generation_gwh_2017" REAL, "generation_gwh_2018" REAL, "generation_gwh_2019" REAL, "generation_data_source" TEXT, "estimated_generation_gwh_2013" REAL, "estimated_generation_gwh_2014" REAL, "estimated_generation_gwh_2015" REAL, "estimated_generation_gwh_2016" REAL, "estimated_generation_gwh_2017" REAL, "estimated_generation_note_2013" TEXT, "estimated_generation_note_2014" TEXT, "estimated_generation_note_2015" TEXT, "estimated_generation_note_2016" TEXT, "estimated_generation_note_2017" TEXT ); CREATE INDEX ["global-power-plants_country_long"] ON [global-power-plants]("country_long"); CREATE INDEX ["global-power-plants_owner"] ON [global-power-plants]("owner");