global-power-plants
Data license: CC Attribution 4.0 License · Data source: World Resources Institute · About: global-power-plants-datasette
137 rows where country_long = "Indonesia", estimated_generation_note_2014 = "NO-ESTIMATION" and estimated_generation_note_2016 = "NO-ESTIMATION"
This data as json, CSV (advanced)
Suggested facets: commissioning_year, source, url, geolocation_source, estimated_generation_note_2017
owner >30
- PLN 8
- PT. Indonesia Power 8
- PLN-South Sumatera Generation Unit 7
- PLN – Indonesia Power 5
- PLN – Java Bali Generation Unit / PT. PJB 5
- PLN-South&South East Sulawesi Regional Unit 5
- PT PLN Persero 5
- PT. PJB 4
- PLN / KITSUMBAGUT 3
- Anggreko International - rental 2
- PLN - Java Bali Generation Unit / PT. PJB 2
- PLN - PT. Indonesia Power 2
- PLN-Nth & Ctrl Sulawesi & Gorontalo Reg Unit 2
- PT. Energy Sengkang 2
- BPPT + Pertamina 1
- INDONESIA POWER UNIT 1
- Indonesia Power 1
- PLN (EPC : PT. Bagus Karya Guangdong Power Engineering PT. Nincec Multi Dimensi) 1
- PLN (EPC : Sinohydro Co. Ltd) 1
- PLN (EPC: CNTIC (China National Tecnical Import Corporation)) 1
- PLN + China National Electric Engineering Co. Ltd. (CNEEC) 1
- PLN + Dongfang Electrik Corp PT Dalle Energy 1
- PLN + Pertamina Geothermal Energy 1
- PLN - East Kalimantan Regional Unit 1
- PLN - East Nusa Tenggara Regional Unit/NTT 1
- PLN - Maluku Regional Unit 1
- PLN - North Sumatera Generation Unit 1
- PLN - Rental 1
- PLN - South Kalimantan Regional Unit 1
- PLN - West Nusa Tenggara Regional Unit/NTB 1
- …
primary_fuel 4
- Coal 70
- Gas 41
- Oil 16
- Geothermal 10
country_long 1
- Indonesia · 137 ✖
Link | rowid ▼ | country | country_long | name | gppd_idnr | capacity_mw | latitude | longitude | primary_fuel | other_fuel1 | other_fuel2 | other_fuel3 | commissioning_year | owner | source | url | geolocation_source | wepp_id | year_of_capacity_data | generation_gwh_2013 | generation_gwh_2014 | generation_gwh_2015 | generation_gwh_2016 | generation_gwh_2017 | generation_gwh_2018 | generation_gwh_2019 | generation_data_source | estimated_generation_gwh_2013 | estimated_generation_gwh_2014 | estimated_generation_gwh_2015 | estimated_generation_gwh_2016 | estimated_generation_gwh_2017 | estimated_generation_note_2013 | estimated_generation_note_2014 | estimated_generation_note_2015 | estimated_generation_note_2016 | estimated_generation_note_2017 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
15642 | 15642 | IDN | Indonesia | Amamapare Port power station | WRI1075798 | 195.0 | -4.8278 | 136.8391 | Coal | 1998.0 | PT Puncakjaya Power | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 1061.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15643 | 15643 | IDN | Indonesia | Ampenan | WRI1000736 | 56.284 | -8.5667 | 116.0667 | Oil | PLN - West Nusa Tenggara Regional Unit/NTB | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026032 | 101.59 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15644 | 15644 | IDN | Indonesia | Amurang power station | WRI1075799 | 60.0 | 1.1825 | 124.4806 | Coal | 2012.0 | PLN | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 326.51 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15648 | 15648 | IDN | Indonesia | Banten Serang power station | WRI1075800 | 660.0 | -5.883 | 106.0459 | Coal | 2017.0 | PT Lestari Baten Energi (LBE) | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 3591.7 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15649 | 15649 | IDN | Indonesia | Batu Hijau power station | WRI1075801 | 124.0 | -8.9012 | 116.7382 | Coal | 1999.0 | Pt Newmont Nusa Tenggara | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 674.8 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15653 | 15653 | IDN | Indonesia | Bitung - Menado | WRI1000746 | 56.62 | 1.4451 | 125.1824 | Oil | PLN-Nth & Ctrl Sulawesi & Gorontalo Reg Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 102.2 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15654 | 15654 | IDN | Indonesia | Celukan Bawang power station | WRI1075802 | 381.0 | -8.1963 | 114.8516 | Coal | 2015.0 | PT General Energy Bali | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 2073.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15656 | 15656 | IDN | Indonesia | Cikarang Babelan power station | WRI1075803 | 280.0 | -6.1161 | 107.052 | Coal | 2017.0 | PT Cikarang Listrindo | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 1523.75 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15657 | 15657 | IDN | Indonesia | Cilacap Sumber power station | WRI1075804 | 1260.0 | -7.6832 | 109.0964 | Coal | 2011.0 | Sumber Segara Primadaya | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 6856.89 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15659 | 15659 | IDN | Indonesia | Darajat 1 | WRI1000750 | 55.0 | -7.2173 | 107.7394 | Geothermal | PLN – Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | |||||||||||||||||||
15660 | 15660 | IDN | Indonesia | Darajat 2 3 | WRI1000751 | 215.0 | -7.2173 | 107.7394 | Geothermal | PT. Chevron Geothermal Darajat Ltd | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | |||||||||||||||||||
15661 | 15661 | IDN | Indonesia | Dieng | WRI1000752 | 60.0 | -7.2061 | 109.9119 | Geothermal | PT. Geo Dipa Energy | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1018473 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15664 | 15664 | IDN | Indonesia | Gunung Malang | WRI1000758 | 25.536 | -6.7409 | 106.673 | Oil | PLN-East Kalimantan Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 46.09 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15665 | 15665 | IDN | Indonesia | Gunung Salak | WRI1000759 | 375.0 | -6.7416 | 106.648 | Geothermal | PT. Chevron Geothermal Salak Ltd | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026072 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15667 | 15667 | IDN | Indonesia | Kalteng-1 Pulang Pisau power station | WRI1075805 | 120.0 | -2.8226 | 114.2088 | Coal | 2015.0 | PT PLN Persero | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 653.03 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15668 | 15668 | IDN | Indonesia | Kaltim Teluk Balikpapan power station | WRI1075806 | 220.0 | -1.1704 | 116.7887 | Coal | 2015.0 | PLN | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 1197.23 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15669 | 15669 | IDN | Indonesia | Kamojang 1 2 3 | WRI1000764 | 140.0 | -6.4239 | 107.4553 | Geothermal | PLN – Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026079 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15670 | 15670 | IDN | Indonesia | Kamojang 4 | WRI1000765 | 60.0 | -6.4239 | 107.4553 | Geothermal | PT. Pertamina Geothermal Energy | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026079 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15671 | 15671 | IDN | Indonesia | Kayu Merah - Ternate | WRI1000769 | 21.084 | 0.8 | 127.4 | Oil | PLN - Maluku Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1093482 | 38.05 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15672 | 15672 | IDN | Indonesia | Keban Agung power station | WRI1075807 | 270.0 | -3.7515 | 103.6481 | Coal | 2015.0 | PT Primanaya Energi | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 1469.33 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15673 | 15673 | IDN | Indonesia | Kendari - Rental | WRI1000771 | 36.3 | 1.0591 | 120.798 | Oil | PLN - Rental | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026082 | 65.52 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15674 | 15674 | IDN | Indonesia | Ketapang Smelter power station | WRI1075808 | 80.0 | -2.3662 | 110.1573 | Coal | 2016.0 | PT Well Harvest Winning Alumina Refinery | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 435.35 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15679 | 15679 | IDN | Indonesia | Lahendong (Binary Cycle) | WRI1000777 | 20.0 | 1.3346 | 124.8392 | Geothermal | BPPT + Pertamina | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026087 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15680 | 15680 | IDN | Indonesia | Lahendong IV | WRI1000778 | 80.0 | 1.2542 | 124.8225 | Geothermal | PLN + Pertamina Geothermal Energy | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1087858 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15682 | 15682 | IDN | Indonesia | Lampung Sebalang power station | WRI1075809 | 200.0 | -5.5859 | 105.3872 | Coal | 2015.0 | PT PLN Persero | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 1088.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15687 | 15687 | IDN | Indonesia | Medan Steel Mill Power Plant | WRI1075810 | 60.0 | 3.6676 | 98.6654 | Coal | 2017.0 | PT Gahapi Nisco Steel | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 326.51 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15689 | 15689 | IDN | Indonesia | Merak power station | WRI1075811 | 120.0 | -5.884 | 106.0642 | Coal | 2014.0 | PT Merak Energi | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 653.03 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15690 | 15690 | IDN | Indonesia | Minahasa - rental | WRI1000791 | 35.0 | -1.4789 | 122.3858 | Oil | PLN - rental | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026100 | 63.17 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15693 | 15693 | IDN | Indonesia | North Duri Cogeneration Plant | WRI1000794 | 300.0 | 1.3722 | 101.226 | Gas | PT Mandau Cipta Tenaga Nusanatara (subsidiary of Chevron) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1092378 | 1250.01 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15695 | 15695 | IDN | Indonesia | PLTG (ex PLTD Sunyaragi) | WRI1000809 | 18.0 | -7.4064 | 109.5842 | Gas | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026057 | 75.0 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15696 | 15696 | IDN | Indonesia | PLTG Belawan | WRI1000817 | 260.0 | 3.5833 | 98.6667 | Gas | PLN / KITSUMBAGUT | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026045 | 1083.34 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15697 | 15697 | IDN | Indonesia | PLTG Belawan TTF | WRI1000818 | 105.0 | 3.5833 | 98.6667 | Gas | PLN / KITSUMBAGUT | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026045 | 437.5 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15698 | 15698 | IDN | Indonesia | PLTG Cikarang Listrindo | WRI1000821 | 150.0 | -6.1133 | 106.7788 | Gas | PT. Cikarang Listrindo | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 625.0 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15699 | 15699 | IDN | Indonesia | PLTG Cilacap | WRI1000822 | 55.0 | -7.7264 | 109.0094 | Gas | PLN – Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 229.17 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15700 | 15700 | IDN | Indonesia | PLTG Duri ex PLTG Sunyaragi Cent Java | WRI1000824 | 20.0 | -7.4064 | 109.5842 | Gas | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026057 | 83.33 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15701 | 15701 | IDN | Indonesia | PLTG Gilimanuk | WRI1000825 | 133.0 | -8.1716 | 114.4344 | Gas | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1050217 | 554.17 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15702 | 15702 | IDN | Indonesia | PLTG Grati | WRI1000829 | 302.0 | -7.6517 | 113.0244 | Gas | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026069 | 1258.35 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15703 | 15703 | IDN | Indonesia | PLTG Gresik | WRI1000830 | 80.0 | -7.1633 | 112.6615 | Gas | PLN – Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026070 | 333.33 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15704 | 15704 | IDN | Indonesia | PLTG Keramasan | WRI1000833 | 145.0 | -2.9167 | 104.7458 | Gas | PT Asta Keramasan Energy (AKE) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026111 | 604.17 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15705 | 15705 | IDN | Indonesia | PLTG Keramasan #1 2 3 4 | WRI1000834 | 65.0 | -2.9167 | 104.7458 | Gas | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026111 | 270.83 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15706 | 15706 | IDN | Indonesia | PLTG Krakatau Posco Energy | WRI1000835 | 200.0 | -6.0048 | 105.9961 | Gas | PT. Krakatau Posco Energy (JV : Korea Posco Energy (70%) + PT. Krakatau Daya Listrik (30%)) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 833.34 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15707 | 15707 | IDN | Indonesia | PLTG Muara Tawar B-3 | WRI1000836 | 420.0 | -6.0867 | 106.9987 | Gas | PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026103 | 1750.02 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15708 | 15708 | IDN | Indonesia | PLTG Muara Tawar Block 4 | WRI1000837 | 420.0 | -6.0867 | 106.9987 | Gas | PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026103 | 1750.02 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15709 | 15709 | IDN | Indonesia | PLTG Pemaron | WRI1000844 | 97.0 | -8.1189 | 115.0887 | Gas | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1054581 | 404.17 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15710 | 15710 | IDN | Indonesia | PLTG Pesanggaran | WRI1000845 | 122.0 | -8.7157 | 115.214 | Gas | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026037 | 508.34 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15711 | 15711 | IDN | Indonesia | PLTG Priok | WRI1000846 | 52.0 | -6.1071 | 106.8716 | Gas | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 216.66 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15712 | 15712 | IDN | Indonesia | PLTG Sengkang/Wajo | WRI1000849 | 180.0 | -5.14 | 119.4221 | Gas | PT. Energy Sengkang | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1025923 | 750.01 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15713 | 15713 | IDN | Indonesia | PLTG Sunyaragi 1 2 3 4 | WRI1000855 | 80.0 | -7.4064 | 109.5842 | Gas | PLN – Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026057 | 333.33 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15714 | 15714 | IDN | Indonesia | PLTG Tarakan | WRI1000858 | 23.0 | 3.3 | 117.6333 | Gas | PT. Cahaya Sakti | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1064213 | 95.83 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15715 | 15715 | IDN | Indonesia | PLTG Tello | WRI1000859 | 123.0 | -5.14 | 119.4221 | Gas | PLN-South&South East Sulawesi Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026174 | 512.5 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15716 | 15716 | IDN | Indonesia | PLTGB Singkawang | WRI1000867 | 9.0 | 0.9 | 109.0 | Gas | PLT – rented from PT. Krista Inti Persada | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1041391 | 37.5 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15717 | 15717 | IDN | Indonesia | PLTGB Tanjung Batu | WRI1000868 | 2.0 | -0.5 | 117.15 | Gas | PLN – sewa | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1050072 | 8.33 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15718 | 15718 | IDN | Indonesia | PLTGU Bekasi Power | WRI1000870 | 130.0 | -6.2611 | 107.1528 | Gas | PT. Bekasi Power/PT. Kawasan Industri Jababeka Tbk | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1075035 | 541.67 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15719 | 15719 | IDN | Indonesia | PLTGU Belawan – Sicanang | WRI1000871 | 817.0 | 3.7715 | 98.6687 | Gas | PLN / KITSUMBAGUT | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026045 | 3404.21 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15720 | 15720 | IDN | Indonesia | PLTGU Cilegon | WRI1000874 | 903.0 | -5.9306 | 106.1042 | Gas | PLN Cilegon Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 3762.55 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15721 | 15721 | IDN | Indonesia | PLTGU Grati | WRI1000875 | 461.0 | -7.6517 | 113.0244 | Gas | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026069 | 1920.86 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15722 | 15722 | IDN | Indonesia | PLTGU Gresik | WRI1000876 | 1579.0 | -7.1633 | 112.6615 | Gas | PLN – Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026070 | 6579.26 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15723 | 15723 | IDN | Indonesia | PLTGU Krakatau Daya Listrik (KDL) | WRI1000878 | 400.0 | -5.9924 | 105.9849 | Gas | PT. Krakatau Daya Listrik | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1666.69 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15724 | 15724 | IDN | Indonesia | PLTGU Muara Karang Block I | WRI1000879 | 509.0 | -6.1087 | 106.7877 | Gas | PLN – Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026102 | 2120.86 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15725 | 15725 | IDN | Indonesia | PLTGU Muara Karang repowering | WRI1000880 | 753.0 | -6.1087 | 106.7877 | Gas | PLN – Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026102 | 3137.54 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15726 | 15726 | IDN | Indonesia | PLTGU Muara Karang repowering Blok 2 | WRI1000881 | 210.0 | -6.1087 | 106.7877 | Gas | PLN – Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026102 | 875.01 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15727 | 15727 | IDN | Indonesia | PLTGU Muara Tawar Block 1 &2 | WRI1000882 | 920.0 | -6.0867 | 106.9987 | Gas | PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026103 | 3833.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15728 | 15728 | IDN | Indonesia | PLTGU Muara Tawar Block 5 | WRI1000883 | 384.0 | -6.0867 | 106.9987 | Gas | PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026103 | 1600.02 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15729 | 15729 | IDN | Indonesia | PLTGU Priok Block 1 2 | WRI1000885 | 1180.0 | -6.1102 | 106.8671 | Gas | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 4916.73 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15730 | 15730 | IDN | Indonesia | PLTGU Sengkang/Wajo | WRI1000886 | 135.0 | -5.14 | 119.4221 | Gas | PT. Energy Sengkang | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1025923 | 562.5 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15731 | 15731 | IDN | Indonesia | PLTGU Tambak Lorok | WRI1000887 | 1034.0 | -6.9505 | 110.434 | Gas | PLN – Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026156 | 4308.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15732 | 15732 | IDN | Indonesia | PLTMG Panaran | WRI1000894 | 24.0 | 0.1807 | 101.8444 | Gas | bright PLN Batam | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1060287 | 100.0 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15733 | 15733 | IDN | Indonesia | PLTMG Pulau Bunyu | WRI1000898 | 2.0 | 3.5 | 117.8333 | Gas | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 8.33 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15734 | 15734 | IDN | Indonesia | PLTMG Tj. Jabung | WRI1000904 | 8.0 | -1.0167 | 104.3667 | Gas | PT. Tanjung Jabung Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 33.33 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15735 | 15735 | IDN | Indonesia | PLTU - Palu - Mpanau - Tawaeli | WRI1000906 | 30.0 | -0.8917 | 119.8707 | Coal | PT. Pusaka Jaya Palu Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 163.25 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15736 | 15736 | IDN | Indonesia | PLTU -Jeneponto I & II | WRI1000907 | 250.0 | -5.6184 | 119.5506 | Coal | PT Bosowa Energy | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1360.49 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15737 | 15737 | IDN | Indonesia | PLTU Asam-asam 1 & 2 | WRI1000910 | 260.0 | -3.9253 | 115.1043 | Coal | PLN - South Kalimantan Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1414.91 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15738 | 15738 | IDN | Indonesia | PLTU Banjarsari/Merapi Timur-Lahat | WRI1000913 | 220.0 | -3.7241 | 103.6894 | Coal | PT. Bukit Pembangkit Inovatif (PT BA 59.75% PT PJB 29.15% dan PT Navigate Innovative Indonesia (PT NII) 11.1%) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1057264 | 1197.23 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15739 | 15739 | IDN | Indonesia | PLTU Banten 1 - Suralaya unit 8 | WRI1000914 | 625.0 | -6.0585 | 106.4646 | Coal | PLN -.PT Indonesia Power - 2010 | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026152 | 3401.23 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15740 | 15740 | IDN | Indonesia | PLTU Banten 2 - Labuhan | WRI1000915 | 600.0 | -6.3919 | 105.8288 | Coal | PLN / 2010 | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 3265.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15741 | 15741 | IDN | Indonesia | PLTU Banten 3 - Teluk Naga/Lontar | WRI1000916 | 945.0 | -6.0585 | 106.4646 | Coal | PLN + Dongfang Electrik Corp PT Dalle Energy | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 5142.66 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15742 | 15742 | IDN | Indonesia | PLTU Bilibili | WRI1000918 | 2.0 | -2.5213 | 121.357 | Coal | PLN-South&South East Sulawesi Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 10.88 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15743 | 15743 | IDN | Indonesia | PLTU Bukit Asam | WRI1000919 | 30.0 | -3.7316 | 103.7975 | Coal | PT BA for own use | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026052 | 163.25 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15744 | 15744 | IDN | Indonesia | PLTU Cilacap 1 & 2 | WRI1000920 | 600.0 | -7.7513 | 109.0186 | Coal | PT. Sumber Segara Primadaya | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1050225 | 3265.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15745 | 15745 | IDN | Indonesia | PLTU Cirebon | WRI1000921 | 660.0 | -6.7704 | 108.6151 | Coal | PT. Cirebon Electric Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1066870 | 3591.7 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15746 | 15746 | IDN | Indonesia | PLTU Embalut - Tanjung Batu | WRI1000925 | 50.0 | -0.5 | 117.15 | Coal | PT. Cahaya Fajar Kaltim | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1058260 | 272.09 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15747 | 15747 | IDN | Indonesia | PLTU Gresik | WRI1000929 | 600.0 | -7.1633 | 112.6615 | Coal | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026070 | 3265.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15748 | 15748 | IDN | Indonesia | PLTU Hendratna | WRI1000932 | 5.0 | -2.5213 | 121.357 | Coal | PT. Hendratna Plywood | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 27.2 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15749 | 15749 | IDN | Indonesia | PLTU Jabar Selatan - Pelabuhan Ratu | WRI1000938 | 1050.0 | -7.0242 | 106.5464 | Coal | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1066867 | 5714.07 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15750 | 15750 | IDN | Indonesia | PLTU Jawa Barat - Indramayu | WRI1000939 | 990.0 | -6.2747 | 107.9704 | Coal | PLN + China National Electric Engineering Co. Ltd. (CNEEC) | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1071378 | 5387.55 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15751 | 15751 | IDN | Indonesia | PLTU Jawa Tengah 1 - Rembang | WRI1000940 | 630.0 | -6.636 | 111.4749 | Coal | PLN(EPC : Zeland-Priamanaya-Tronoh) | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1065762 | 3428.44 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15752 | 15752 | IDN | Indonesia | PLTU Kaur | WRI1000943 | 200.0 | -2.5213 | 121.357 | Coal | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1088.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15753 | 15753 | IDN | Indonesia | PLTU Keramasan | WRI1000945 | 25.0 | -2.5213 | 121.357 | Coal | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026111 | 136.04 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15754 | 15754 | IDN | Indonesia | PLTU Kupang | WRI1000947 | 30.0 | -2.5213 | 121.357 | Coal | PT. Indonesia Power & electrindo Perkasa Utama | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026086 | 163.25 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15755 | 15755 | IDN | Indonesia | PLTU Labuhan Angin | WRI1000948 | 230.0 | 1.7176 | 98.7265 | Coal | PLN - North Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1066585 | 1251.65 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15756 | 15756 | IDN | Indonesia | PLTU Lati | WRI1000949 | 14.0 | -2.5213 | 121.357 | Coal | PLN - East Kalimantan Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1088444 | 76.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15757 | 15757 | IDN | Indonesia | PLTU Listrindo | WRI1000950 | 2.5 | -2.5213 | 121.357 | Coal | PT. Listrindo (IPP) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 13.6 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15758 | 15758 | IDN | Indonesia | PLTU Muara Karang | WRI1000954 | 400.0 | -6.1069 | 106.7882 | Coal | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026102 | 2176.79 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15759 | 15759 | IDN | Indonesia | PLTU NAD-Nagan Raya | WRI1000956 | 220.0 | 4.1089 | 96.1972 | Coal | PLN (EPC : Sinohydro Co. Ltd) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1073026 | 1197.23 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15760 | 15760 | IDN | Indonesia | PLTU Ombilin - Sijantang - Sawahlunto | WRI1000960 | 200.0 | -0.6094 | 100.7535 | Coal | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026107 | 1088.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15761 | 15761 | IDN | Indonesia | PLTU Paiton I Unit 7 & 8 | WRI1000941 | 5355.0 | -7.7184 | 113.5827 | Coal | PT. Paiton Energy Corp | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026016 | 29141.78 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15762 | 15762 | IDN | Indonesia | PLTU Pakerin | WRI1000965 | 34.0 | -2.5213 | 121.357 | Coal | PT. Pakerin (pulp industry) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 185.02 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15763 | 15763 | IDN | Indonesia | PLTU Pangkalan Bun | WRI1000966 | 14.0 | -2.6833 | 111.6167 | Coal | PT. Energi Listrik Indonesia (subsidiary of PT. Eksploitasi Energi Indonesia) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026115 | 76.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15764 | 15764 | IDN | Indonesia | PLTU Pangkalan Susu 1 & 2 | WRI1000967 | 400.0 | 4.1196 | 98.2555 | Coal | PLN (EPC : PT. Bagus Karya Guangdong Power Engineering PT. Nincec Multi Dimensi) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1079188 | 2176.79 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15765 | 15765 | IDN | Indonesia | PLTU Perak | WRI1000970 | 100.0 | -7.2492 | 112.7508 | Coal | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 544.19 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 |
Advanced export
JSON shape: default, array, newline-delimited
CREATE TABLE "global-power-plants" ( "country" TEXT, "country_long" TEXT, "name" TEXT, "gppd_idnr" TEXT, "capacity_mw" REAL, "latitude" REAL, "longitude" REAL, "primary_fuel" TEXT, "other_fuel1" TEXT, "other_fuel2" TEXT, "other_fuel3" TEXT, "commissioning_year" REAL, "owner" TEXT, "source" TEXT, "url" TEXT, "geolocation_source" TEXT, "wepp_id" TEXT, "year_of_capacity_data" INTEGER, "generation_gwh_2013" REAL, "generation_gwh_2014" REAL, "generation_gwh_2015" REAL, "generation_gwh_2016" REAL, "generation_gwh_2017" REAL, "generation_gwh_2018" REAL, "generation_gwh_2019" REAL, "generation_data_source" TEXT, "estimated_generation_gwh_2013" REAL, "estimated_generation_gwh_2014" REAL, "estimated_generation_gwh_2015" REAL, "estimated_generation_gwh_2016" REAL, "estimated_generation_gwh_2017" REAL, "estimated_generation_note_2013" TEXT, "estimated_generation_note_2014" TEXT, "estimated_generation_note_2015" TEXT, "estimated_generation_note_2016" TEXT, "estimated_generation_note_2017" TEXT ); CREATE INDEX ["global-power-plants_country_long"] ON [global-power-plants]("country_long"); CREATE INDEX ["global-power-plants_owner"] ON [global-power-plants]("owner");