global-power-plants
Data license: CC Attribution 4.0 License · Data source: World Resources Institute · About: global-power-plants-datasette
1,191 rows where country_long = "United Kingdom" and estimated_generation_note_2017 = "CAPACITY-FACTOR-V1" sorted by wepp_id
This data as json, CSV (advanced)
Suggested facets: source, url, geolocation_source
owner >30
- Waste Recycling Group 45
- Biffa 28
- Scottish Power Renewables 20
- Scottish and Southern Energy (SSE) 20
- SITA UK 18
- Natural Power 17
- RWE npower 16
- Greencoat UK Wind 14
- Green Cat Renewables 13
- Ecotricity 12
- Veolia 12
- Orsted (formerly Dong Energy) 11
- Renewable Energy Systems (RES) 11
- Viridor 11
- Banks Renewables 10
- RWE Npower Plc 10
- Energia Renewables 9
- Fred Olsen Renewables 9
- Airvolution Energy 8
- British Energy (now part of EDF) 8
- E.On 8
- Gaelectric Developments/ CGN Europe Energy 8
- NOVERA 8
- Thames Water Utilities 8
- Uniper UK Limited 8
- Blue Energy 7
- Combined Landfill Projects (CLP) 7
- EDF Energy 7
- Falck Renewables 7
- Npower Renewables 7
- …
other_fuel1 2 ✖
- Biomass 1
- Cogeneration 1
country_long 1
- United Kingdom · 1,191 ✖
Link | rowid | country | country_long | name | gppd_idnr | capacity_mw | latitude | longitude | primary_fuel | other_fuel1 | other_fuel2 | other_fuel3 | commissioning_year | owner | source | url | geolocation_source | wepp_id ▼ | year_of_capacity_data | generation_gwh_2013 | generation_gwh_2014 | generation_gwh_2015 | generation_gwh_2016 | generation_gwh_2017 | generation_gwh_2018 | generation_gwh_2019 | generation_data_source | estimated_generation_gwh_2013 | estimated_generation_gwh_2014 | estimated_generation_gwh_2015 | estimated_generation_gwh_2016 | estimated_generation_gwh_2017 | estimated_generation_note_2013 | estimated_generation_note_2014 | estimated_generation_note_2015 | estimated_generation_note_2016 | estimated_generation_note_2017 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
21967 | 21967 | GBR | United Kingdom | ANP Newport Wind Turbine | GBR0005555 | 2.3 | 51.5559 | -2.9738 | Wind | Associated British Ports | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 5.79 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
21977 | 21977 | GBR | United Kingdom | Aberthaw GT | GBR1000375 | 51.0 | 51.3875 | -3.4068 | Gas | RWE Npower Plc | Department for Business Energy & Industrial Strategy | https://www.gov.uk/government/collections/digest-of-uk-energy-statistics-dukes | CARMA | 236.64 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
21980 | 21980 | GBR | United Kingdom | Achairn | GBR0003285 | 6.2 | 58.4385 | -3.2015 | Wind | James and Ronald Innes | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 15.62 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
21984 | 21984 | GBR | United Kingdom | Achlachan Wind Farm | GBR2001060 | 10.0 | 58.4489 | -3.4546 | Wind | Whirlwind Renewables | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 25.2 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
21985 | 21985 | GBR | United Kingdom | Advanced Manufacturing Research Centre | GBR0003028 | 2.6 | 53.3876 | -1.3779 | Wind | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 6.55 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||||
21986 | 21986 | GBR | United Kingdom | Afton Wind Farm | GBR2001058 | 50.0 | 55.3116 | -4.1743 | Wind | InfraRed Capital Partners/ E.on | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 126.04 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
21990 | 21990 | GBR | United Kingdom | Aikengall II Wester Dod Community Wind Farm | GBR0004332 | 60.8 | 55.9172 | -2.4901 | Wind | Community Windpower | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 153.27 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
21991 | 21991 | GBR | United Kingdom | Airfield Farm (Podington) (Resubmission) | GBR0004116 | 8.6 | 52.2363 | -0.6089 | Wind | Airvolution Energy | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 21.68 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
21993 | 21993 | GBR | United Kingdom | Airies Farm | GBR0004462 | 35.0 | 54.8021 | -4.6577 | Wind | NTR | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 88.23 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22003 | 22003 | GBR | United Kingdom | Allerton Waste Recovery Park (EfW) | GBR2001017 | 27.0 | 54.0326 | -1.3805 | Waste | AmeyCespa | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 26.14 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22013 | 22013 | GBR | United Kingdom | Altahullion | GBR0003244 | 26.0 | 54.9702 | -6.9996 | Wind | B9 Energy / RES | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 65.54 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22015 | 22015 | GBR | United Kingdom | Altamuskin | GBR0004139 | 7.1 | 54.5222 | -7.0946 | Wind | Altamuskin Windfarm (Energia) | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 17.89 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22016 | 22016 | GBR | United Kingdom | Altamuskin Extension | GBR0004557 | 7.1 | 54.5128 | -7.1113 | Wind | Altamuskin Windfarm (Energia) | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 17.89 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22017 | 22017 | GBR | United Kingdom | Altaveedan Wind Farm | GBR0003850 | 17.9 | 55.0847 | -6.2578 | Wind | NTR PLC | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 45.12 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22018 | 22018 | GBR | United Kingdom | Alveston Wind Park | GBR0004335 | 6.9 | 51.5723 | -2.4999 | Wind | Ecotricity | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 17.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22027 | 22027 | GBR | United Kingdom | Ardoch and Over Enoch Wind Farm (Ardoch) | GBR0003925 | 7.2 | 55.72 | -4.2537 | Wind | 2020 Renewables/ NTR | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 18.15 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22028 | 22028 | GBR | United Kingdom | Ardoch and Over Enoch Wind Farm (Over Enoch) | GBR0003855 | 4.3 | 55.7102 | -4.2521 | Wind | 2020 Renewables/ NTR | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 10.84 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22039 | 22039 | GBR | United Kingdom | Arlesey Landfill Site | GBR0000664 | 1.1 | 52.0017 | -0.2767 | Waste | Waste Recycling Group | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1.06 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22042 | 22042 | GBR | United Kingdom | Arnish Moor | GBR0003306 | 3.9 | 58.1766 | -6.4383 | Wind | Arnish Electric Ltd / Farm Energy | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 9.83 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22058 | 22058 | GBR | United Kingdom | Auchadaduie Wind Farm | GBR2001055 | 6.9 | 55.5447 | -5.6602 | Wind | Fyne Futures | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 17.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22059 | 22059 | GBR | United Kingdom | Auchencarroch Landfill | GBR0000688 | 2.1 | 55.9968 | -4.5334 | Waste | Auchencarroch Energy Ltd / CLP | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 2.03 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22060 | 22060 | GBR | United Kingdom | Auchencarroch Landfill Extension | GBR0000786 | 2.0 | 55.9972 | -4.5326 | Waste | Auchencarroch Energy Ltd/CLP | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1.93 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22061 | 22061 | GBR | United Kingdom | Auchinderran Wind Farm | GBR0003806 | 2.4 | 57.5814 | -2.6468 | Wind | Green Cat Renewables | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 6.05 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22062 | 22062 | GBR | United Kingdom | Auchinlea Landfill Site | GBR0000716 | 2.3 | 55.8096 | -3.9004 | Waste | Natural Power | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 2.22 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22063 | 22063 | GBR | United Kingdom | Auchrobert Wind Farm | GBR0004337 | 36.0 | 55.624 | -3.9842 | Wind | Falck Renewables | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 90.75 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22065 | 22065 | GBR | United Kingdom | Aveley | GBR0000514 | 1.2 | 51.504 | 0.2333 | Waste | Waste Recycling Group | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1.16 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22066 | 22066 | GBR | United Kingdom | Aveley Landfill Scheme | GBR0000510 | 2.1 | 51.5039 | 0.2348 | Waste | Waste Recycling Group | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 2.03 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22069 | 22069 | GBR | United Kingdom | Avondale | GBR0000639 | 4.0 | 55.905 | -3.945 | Waste | Shanks Avondale | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 3.87 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22073 | 22073 | GBR | United Kingdom | Avonmouth Port | GBR0003194 | 6.0 | 51.5166 | -2.7027 | Wind | Bristol Port Authority | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 15.12 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22074 | 22074 | GBR | United Kingdom | Avonmouth Port - extension | GBR0004159 | 9.0 | 51.5029 | -2.6988 | Wind | Bristol Port Company | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 22.68 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22075 | 22075 | GBR | United Kingdom | Avonmouth Port II | GBR0003927 | 5.0 | 51.5383 | -2.6739 | Wind | Bristol City Council - Energy Management Unit | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 12.6 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22076 | 22076 | GBR | United Kingdom | Avonmouth Wind Power | GBR0003664 | 8.2 | 51.5115 | -2.6735 | Wind | Wessex Water Engineering Services | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 20.67 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22084 | 22084 | GBR | United Kingdom | BROWNIELEYS - 3 WIND TURBINES | GBR0004348 | 7.5 | 56.8399 | -2.3791 | Wind | Brownieleys Renewables/Muirden Energy | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 18.9 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22087 | 22087 | GBR | United Kingdom | Bad a Cheo Wind Farm | GBR2001076 | 26.7 | 58.4205 | -3.4292 | Wind | Innogy | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 67.3 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22089 | 22089 | GBR | United Kingdom | Baglan Bay CCGT | GBR1000312 | 520.0 | 51.6145 | -3.8352 | Gas | MPF Operations Limited | Department for Business Energy & Industrial Strategy | https://www.gov.uk/government/collections/digest-of-uk-energy-statistics-dukes | GEODB | 2412.83 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22090 | 22090 | GBR | United Kingdom | Baglan Bay OCGT | GBR1000314 | 32.3 | 51.5924 | -3.7802 | Gas | MPF Operations Limited | Department for Business Energy & Industrial Strategy | https://www.gov.uk/government/collections/digest-of-uk-energy-statistics-dukes | CARMA | 149.87 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22108 | 22108 | GBR | United Kingdom | Ballymena | GBR0002866 | 4.6 | 54.8795 | -6.2332 | Wind | White Young Green Planning | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 11.59 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22109 | 22109 | GBR | United Kingdom | Balmurrie Fell Wind Farm | GBR0004445 | 9.1 | 54.8725 | -4.5165 | Wind | Scottish Southern Energy | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 22.94 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22110 | 22110 | GBR | United Kingdom | Bambers | GBR0002715 | 4.8 | 53.3213 | 0.2384 | Wind | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 12.1 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||||
22116 | 22116 | GBR | United Kingdom | Barkip Landfill Site | GBR0000682 | 1.2 | 55.7181 | -4.7186 | Waste | William Tracey Ltd | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1.16 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22118 | 22118 | GBR | United Kingdom | Barling Hall Farm | GBR0000735 | 2.4 | 51.5801 | 0.7928 | Waste | Cory Environmental | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 2.32 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22123 | 22123 | GBR | United Kingdom | Barns of Ayre Wind Turbines (2) | GBR0003902 | 1.8 | 58.9217 | -2.7156 | Wind | Ayre Energy/Aquatera Ltd | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 4.53 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22126 | 22126 | GBR | United Kingdom | Barrow | GBR0002546 | 90.0 | 53.9915 | -3.2983 | Wind | Orsted (formerly Dong Energy) | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 226.88 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22127 | 22127 | GBR | United Kingdom | Barry | GBR2000125 | 235.0 | 51.4089 | -3.2301 | Gas | GEO | 1090.41 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||||||
22139 | 22139 | GBR | United Kingdom | Beacon Hill | GBR0000723 | 3.0 | 50.7546 | -2.0297 | Waste | Combined Landfill Projects (CLP) / SITA UK | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 2.9 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22142 | 22142 | GBR | United Kingdom | Beatrice | GBR2001031 | 588.0 | 58.0882 | -2.9502 | Wind | Scottish & Southern Energy (SSE) / Repsol / CIP | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1482.32 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22144 | 22144 | GBR | United Kingdom | Beck Burn (resubmission) | GBR0004544 | 31.0 | 55.0107 | -3.0263 | Wind | EDF Energy Renewables | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 78.14 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22149 | 22149 | GBR | United Kingdom | Beckton Sewage Treatment Works | GBR0004976 | 2.2 | 51.5256 | 0.0799 | Wind | Thames Water Utilities | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 5.54 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22152 | 22152 | GBR | United Kingdom | Beddington EfW | GBR2001015 | 26.0 | 51.3805 | -0.1472 | Waste | Viridor | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 25.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22161 | 22161 | GBR | United Kingdom | Beinneun | GBR0003787 | 85.0 | 57.0956 | -4.9655 | Wind | Octopus Investments/Blue Energy. | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 214.28 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22162 | 22162 | GBR | United Kingdom | Beinneun Windfarm Extension | GBR0003619 | 23.8 | 57.0956 | -4.9655 | Wind | Octopus Investments/Blue Energy. | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 59.99 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22164 | 22164 | GBR | United Kingdom | Bellhouse South | GBR0000736 | 3.9 | 51.8643 | 0.8293 | Waste | Cory Environmental | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 3.77 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22166 | 22166 | GBR | United Kingdom | Ben Aketil Extension | GBR0003668 | 2.6 | 57.4298 | -6.4583 | Wind | Ben Aketil Wind Energy Ltd | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 6.55 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22169 | 22169 | GBR | United Kingdom | Bendealt Wind Farm Highland | GBR0003296 | 9.0 | 57.7055 | -4.4267 | Wind | RWE npower | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 22.68 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22170 | 22170 | GBR | United Kingdom | Bennett Bank Landfill Site (lfg) | GBR0000698 | 2.2 | 54.1603 | -3.2037 | Waste | Waste Recycling Group | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 2.13 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22185 | 22185 | GBR | United Kingdom | Betton Abbots | GBR0000701 | 1.3 | 52.6702 | -2.7201 | Waste | SITA UK / Natural Power | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1.25 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22188 | 22188 | GBR | United Kingdom | Bhlaraidh (previously Balmacaan) | GBR0004640 | 110.0 | 57.2191 | -4.5819 | Wind | Scottish and Southern Energy (SSE) | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 277.3 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22194 | 22194 | GBR | United Kingdom | Billinge Hill Quarry Landfill Scheme | GBR0000573 | 1.0 | 53.5062 | -2.7176 | Waste | Bidston Methane Ltd. | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 0.96 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22199 | 22199 | GBR | United Kingdom | Binn Landfill | GBR0000715 | 1.9 | 56.3103 | -3.3335 | Waste | SITA UK / Natural Power | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1.84 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22206 | 22206 | GBR | United Kingdom | Bishopthorpe | GBR0004256 | 16.4 | 53.5099 | -0.0007 | Wind | Greencoat UK (formerly BayWa r.e.) | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 41.34 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22209 | 22209 | GBR | United Kingdom | Black Dog | GBR0000629 | 2.2 | 57.2205 | -2.0604 | Waste | FCC Environment | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 2.13 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22217 | 22217 | GBR | United Kingdom | Blackborough End Landfill Site | GBR0000729 | 1.5 | 52.7032 | 0.4732 | Waste | Combined Landfill Projects (CLP) | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1.45 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22220 | 22220 | GBR | United Kingdom | Blackcraig | GBR2001048 | 53.0 | 55.1199 | -4.0321 | Wind | Blue Energy | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 133.61 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22224 | 22224 | GBR | United Kingdom | Blaengwen (Re-Submission) | GBR0004670 | 23.0 | 51.9778 | -4.238 | Wind | Statkraft and Catamount Energy Corporation | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 57.98 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22226 | 22226 | GBR | United Kingdom | Blantyre Muir Wind Farm extension | GBR0004240 | 7.5 | 55.7416 | -4.09 | Wind | West Coast Energy | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 18.9 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22230 | 22230 | GBR | United Kingdom | Bletchley Phase II | GBR0000536 | 2.2 | 51.9791 | -0.7653 | Waste | Waste Recycling Group | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 2.13 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22231 | 22231 | GBR | United Kingdom | Bloodhills - repowering | GBR0003924 | 1.0 | 52.707 | 1.6644 | Wind | The Farm Energy Partnership LLP | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 2.52 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22233 | 22233 | GBR | United Kingdom | Blue Gates Farm | GBR0002694 | 1.5 | 51.8631 | 1.0042 | Wind | M H & P Leyland | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 3.78 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22237 | 22237 | GBR | United Kingdom | Blyth Offshore Wind Test Site | GBR2001032 | 41.5 | 55.167 | -1.3644 | Wind | EDF Energy Renewables | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 104.61 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22245 | 22245 | GBR | United Kingdom | Bodtegir | GBR0006033 | 1.5 | 53.0175 | -3.4988 | Wind | Clean Earth Energy | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 3.78 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22247 | 22247 | GBR | United Kingdom | Bogenlea Farm | GBR0004346 | 2.3 | 57.5663 | -2.2999 | Wind | Eco2 | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 5.79 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22253 | 22253 | GBR | United Kingdom | Bonerbo Wind Turbines (resubmission) | GBR0003370 | 1.5 | 56.2594 | -2.7467 | Wind | Messrs Stevenson Watson & Brunton | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 3.78 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22254 | 22254 | GBR | United Kingdom | Bonnyrigg | GBR0000747 | 2.2 | 55.8865 | -3.1255 | Waste | Natural Power | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 2.13 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22255 | 22255 | GBR | United Kingdom | Bootham Lane | GBR0000614 | 1.2 | 53.5861 | -1.0105 | Waste | Waste Recycling Group | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1.16 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22257 | 22257 | GBR | United Kingdom | Bootham Lane Phase 2 | GBR0000630 | 1.4 | 53.5861 | -1.0105 | Waste | Waste Recycling Group | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1.35 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22261 | 22261 | GBR | United Kingdom | Boulfruich | GBR0003126 | 13.0 | 58.2999 | -3.4434 | Wind | Mr and Mrs Hall | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 32.77 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22266 | 22266 | GBR | United Kingdom | Bowbeat (Emly Bank) | GBR2000198 | 15.6 | 55.7117 | -3.1336 | Wind | UK DUKES | WRI | 39.32 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||||
22267 | 22267 | GBR | United Kingdom | Bowbeat (Roughside) | GBR2000199 | 15.6 | 55.7117 | -3.1336 | Wind | WRI | 39.32 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||||||
22274 | 22274 | GBR | United Kingdom | Brackagh Quarry | GBR0004361 | 4.98 | 54.8112 | -6.7082 | Wind | Renewable Energy Generation (REG) | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 12.55 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22277 | 22277 | GBR | United Kingdom | Bradwell | GBR0003936 | 20.5 | 51.7098 | 0.821 | Wind | Npower Renewables | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 51.67 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22286 | 22286 | GBR | United Kingdom | Brechfa Forest West | GBR2001040 | 57.4 | 51.9606 | -4.1234 | Wind | RWE Npower Renewables | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 144.7 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22288 | 22288 | GBR | United Kingdom | Brenig Wind Farm (Resubmission) | GBR2001094 | 37.6 | 53.109 | -3.5031 | Wind | CGNEE | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 94.78 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22289 | 22289 | GBR | United Kingdom | Brenkley Landfill | GBR0000704 | 1.9 | 55.069 | -1.6743 | Waste | SITA UK / Natural Power | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1.84 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22290 | 22290 | GBR | United Kingdom | Bretby Power | GBR0000742 | 1.6 | 52.7867 | -1.5848 | Waste | Natural Power | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1.54 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22296 | 22296 | GBR | United Kingdom | Briton / Neath | GBR0000605 | 2.2 | 51.6431 | -3.8325 | Waste | Natural Power | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 2.13 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22297 | 22297 | GBR | United Kingdom | Briton Ferry | GBR0000602 | 2.0 | 51.6422 | -3.831 | Waste | Neath Port Talbot Waste Management Co Ltd | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1.93 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22300 | 22300 | GBR | United Kingdom | Brockaghboy Wind Farm | GBR0004249 | 37.5 | 54.9806 | -6.765 | Wind | TCI Renewables/ERG Renew | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 94.53 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22301 | 22301 | GBR | United Kingdom | Brockaghboy Wind Farm - extension | GBR0002888 | 10.0 | 54.8991 | -6.8692 | Wind | TCI Renewables/ERG Renew | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 25.2 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22303 | 22303 | GBR | United Kingdom | Brockholes Wind Cluster | GBR0002672 | 2.4 | 55.8666 | -2.2879 | Wind | Mr J Prentice Brockholes Farm | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 6.05 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22305 | 22305 | GBR | United Kingdom | Brogborough Phase III | GBR0000515 | 11.0 | 52.0517 | -0.5868 | Waste | Waste Recycling Group | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 10.65 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22306 | 22306 | GBR | United Kingdom | Brogborough Phase IV | GBR0000516 | 11.0 | 52.0553 | -0.5867 | Waste | Waste Recycling Group | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 10.65 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22307 | 22307 | GBR | United Kingdom | Bromborough Dock | GBR0000657 | 3.7 | 53.348 | -2.9806 | Waste | Biffa | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 3.58 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22311 | 22311 | GBR | United Kingdom | Broockhurst Wood | GBR0000656 | 2.0 | 51.0892 | -0.3522 | Waste | Biffa | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1.93 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22319 | 22319 | GBR | United Kingdom | Brotherton (formerly Paul Matthew Hill wind turbines) | GBR0004411 | 4.6 | 56.8147 | -2.3718 | Wind | Renewable Energy Ventures Ltd | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 11.59 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22325 | 22325 | GBR | United Kingdom | Bryn Du | GBR0003556 | 16.4 | 52.4147 | -3.707 | Wind | Renewable Development Company Ltd | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 41.34 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22329 | 22329 | GBR | United Kingdom | Brynpica Landfill Site | GBR0000665 | 2.7 | 51.6579 | -3.4832 | Waste | NOVERA | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 2.61 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22340 | 22340 | GBR | United Kingdom | Burbo Bank Extension (Burbo Bank 2) | GBR0002539 | 258.0 | 53.48 | -3.27 | Wind | Orsted (formerly Dong Energy) | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 650.4 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22346 | 22346 | GBR | United Kingdom | Burnfoot Hill Extension | GBR0004450 | 4.0 | 56.2154 | -3.7689 | Wind | FAO Miss Sarah Dooley | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 10.08 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22348 | 22348 | GBR | United Kingdom | Burnhills Landfill (L5) | GBR0000705 | 3.8 | 54.956 | -1.7579 | Waste | SITA UK | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 3.68 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
22349 | 22349 | GBR | United Kingdom | Burnhills Landfill Scheme (L4) | GBR0000702 | 1.5 | 54.956 | -1.7579 | Waste | SITA UK | UK Renewable Energy Planning Database | https://www.gov.uk/government/collections/renewable-energy-planning-data | UK Renewable Energy Planning Database | 1.45 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 |
Advanced export
JSON shape: default, array, newline-delimited
CREATE TABLE "global-power-plants" ( "country" TEXT, "country_long" TEXT, "name" TEXT, "gppd_idnr" TEXT, "capacity_mw" REAL, "latitude" REAL, "longitude" REAL, "primary_fuel" TEXT, "other_fuel1" TEXT, "other_fuel2" TEXT, "other_fuel3" TEXT, "commissioning_year" REAL, "owner" TEXT, "source" TEXT, "url" TEXT, "geolocation_source" TEXT, "wepp_id" TEXT, "year_of_capacity_data" INTEGER, "generation_gwh_2013" REAL, "generation_gwh_2014" REAL, "generation_gwh_2015" REAL, "generation_gwh_2016" REAL, "generation_gwh_2017" REAL, "generation_gwh_2018" REAL, "generation_gwh_2019" REAL, "generation_data_source" TEXT, "estimated_generation_gwh_2013" REAL, "estimated_generation_gwh_2014" REAL, "estimated_generation_gwh_2015" REAL, "estimated_generation_gwh_2016" REAL, "estimated_generation_gwh_2017" REAL, "estimated_generation_note_2013" TEXT, "estimated_generation_note_2014" TEXT, "estimated_generation_note_2015" TEXT, "estimated_generation_note_2016" TEXT, "estimated_generation_note_2017" TEXT ); CREATE INDEX ["global-power-plants_country_long"] ON [global-power-plants]("country_long"); CREATE INDEX ["global-power-plants_owner"] ON [global-power-plants]("owner");