rowid | country | country_long | name | gppd_idnr | capacity_mw | latitude | longitude | primary_fuel | other_fuel1 | other_fuel2 | other_fuel3 | commissioning_year | owner | source | url | geolocation_source | wepp_id | year_of_capacity_data | generation_gwh_2013 | generation_gwh_2014 | generation_gwh_2015 | generation_gwh_2016 | generation_gwh_2017 | generation_gwh_2018 | generation_gwh_2019 | generation_data_source | estimated_generation_gwh_2013 | estimated_generation_gwh_2014 | estimated_generation_gwh_2015 | estimated_generation_gwh_2016 | estimated_generation_gwh_2017 | estimated_generation_note_2013 | estimated_generation_note_2014 | estimated_generation_note_2015 | estimated_generation_note_2016 | estimated_generation_note_2017 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
12508 | DEU | Germany | Amrumbank West | WRI1025864 | 301.32 | 54.5 | 7.7999 | Wind | 2015.0 | Bundesnetzagentur | https://www.bundesnetzagentur.de/DE/Sachgebiete/ElektrizitaetundGas/Unternehmen_Institutionen/Versorgungssicherheit/Erzeugungskapazitaeten/Kraftwerksliste/kraftwerksliste-node.html | WRI | 1060690 | 1032.58 | 1066.95 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | WIND-V1 | WIND-V1 | ||||||||||||||||
12537 | DEU | Germany | BROKDORF | WRI1005621 | 1480.0 | 53.8506 | 9.345 | Nuclear | 1986.0 | IAEA | https://www.iaea.org/PRIS/CountryStatistics/CountryStatisticsLandingPage.aspx | GEODB | 1020793 | 10516.481 | 10939.383 | 5480.324 | JRC-PPDB-OPEN | 9946.24 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||
12544 | DEU | Germany | Baltic 2 | WRI1025869 | 288.0 | 54.983 | 13.162 | Wind | 2015.0 | Bundesnetzagentur | https://www.bundesnetzagentur.de/DE/Sachgebiete/ElektrizitaetundGas/Unternehmen_Institutionen/Versorgungssicherheit/Erzeugungskapazitaeten/Kraftwerksliste/kraftwerksliste-node.html | WRI | 984.35 | 1040.77 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | WIND-V1 | WIND-V1 | |||||||||||||||||
12578 | DEU | Germany | Biomass Generator #19 | WRI1006107 | 20.0 | 52.8515 | 13.7781 | Biomass | 2006.0 | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | |||||||||||||||||||
12582 | DEU | Germany | Biomass Generator #21 | WRI1006109 | 18.3 | 52.1827 | 14.2584 | Biomass | 2001.0 | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | |||||||||||||||||||
12585 | DEU | Germany | Biomass Generator #3 | WRI1006081 | 19.7 | 53.1511 | 12.3771 | Biomass | 2002.0 | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | |||||||||||||||||||
12651 | DEU | Germany | Bürgerwindpark im Kirchspiel Medelby | WRI1025868 | 82.23 | 54.7776 | 9.1334 | Wind | 2014.0 | Bundesnetzagentur | https://www.bundesnetzagentur.de/DE/Sachgebiete/ElektrizitaetundGas/Unternehmen_Institutionen/Versorgungssicherheit/Erzeugungskapazitaeten/Kraftwerksliste/kraftwerksliste-node.html | WRI | 1116633 | 302.99 | 270.65 | 278.67 | NO-ESTIMATION | NO-ESTIMATION | WIND-V1 | WIND-V1 | WIND-V1 | |||||||||||||||
12729 | DEU | Germany | EMSLAND | WRI1005659 | 1406.0 | 52.4716 | 7.3204 | Nuclear | 1988.0 | IAEA | https://www.iaea.org/PRIS/CountryStatistics/CountryStatisticsLandingPage.aspx | GEODB | 10285.976 | 10538.748 | 10752.041 | JRC-PPDB-OPEN | 9448.93 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||
12848 | DEU | Germany | Gode Wind 1 - Teil 1 | WRI1025855 | 263.1 | 54.041 | 6.994 | Wind | 2015.0 | Bundesnetzagentur | https://www.bundesnetzagentur.de/DE/Sachgebiete/ElektrizitaetundGas/Unternehmen_Institutionen/Versorgungssicherheit/Erzeugungskapazitaeten/Kraftwerksliste/kraftwerksliste-node.html | WRI | 1067066 | 941.67 | 966.32 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | WIND-V1 | WIND-V1 | ||||||||||||||||
13062 | DEU | Germany | ISAR-2 | WRI1005849 | 1485.0 | 48.6049 | 12.2936 | Nuclear | 1988.0 | IAEA | https://www.iaea.org/PRIS/CountryStatistics/CountryStatisticsLandingPage.aspx | GEODB | 1020796 | 10394.236 | 11336.048 | 10901.416 | JRC-PPDB-OPEN | 9979.84 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||
13313 | DEU | Germany | NECKARWESTHEIM-2 | WRI1005974 | 1400.0 | 49.0408 | 9.1759 | Nuclear | 1989.0 | IAEA | https://www.iaea.org/PRIS/CountryStatistics/CountryStatisticsLandingPage.aspx | GEODB | 10205.1 | IAEA | 9408.61 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
13405 | DEU | Germany | PHILIPPSBURG-2 | WRI1006001 | 1468.0 | 49.2529 | 8.4364 | Nuclear | 1984.0 | IAEA | https://www.iaea.org/PRIS/CountryStatistics/CountryStatisticsLandingPage.aspx | GEODB | 1020800 | 10372.282 | 9701.603 | 7387.201 | JRC-PPDB-OPEN | 9865.6 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||
13741 | DEU | Germany | Windpark Hüselitz | WRI1025848 | 92.4 | 52.5174 | 11.7882 | Wind | 2015.0 | Bundesnetzagentur | https://www.bundesnetzagentur.de/DE/Sachgebiete/ElektrizitaetundGas/Unternehmen_Institutionen/Versorgungssicherheit/Erzeugungskapazitaeten/Kraftwerksliste/kraftwerksliste-node.html | WRI | 264.58 | 266.9 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | WIND-V1 | WIND-V1 | |||||||||||||||||
13742 | DEU | Germany | Windpark Klettwitz | WRI1025842 | 89.1 | 51.5452 | 13.8652 | Wind | 2015.0 | Bundesnetzagentur | https://www.bundesnetzagentur.de/DE/Sachgebiete/ElektrizitaetundGas/Unternehmen_Institutionen/Versorgungssicherheit/Erzeugungskapazitaeten/Kraftwerksliste/kraftwerksliste-node.html | WRI | 246.91 | 267.6 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | WIND-V1 | WIND-V1 | |||||||||||||||||
12576 | DEU | Germany | Biomass Generator #16 | WRI1006105 | 10.2 | 51.9201 | 11.8018 | Biomass | 1996.0 | ACR Biokraftwerk Calbe Invest GmbH & Co. KG | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
12984 | DEU | Germany | Heizkraftwerk 1 | WRI1005732 | 22.5 | 53.5177 | 9.9508 | Gas | 1992.0 | ADM Hamburg Aktiengesellschaft | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 87.19 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
13448 | DEU | Germany | RZR Herten II | WRI1006036 | 29.6 | 51.5573 | 7.1641 | Waste | 2009.0 | AGR Abfallentsorgungsgesellschaft Ruhrgebiet mbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 1028840 | 62.28 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
12481 | DEU | Germany | AMK - Abfallentsorgungsgesellschaft des Märkischen Kreises mbH | WRI1005577 | 12.6 | 51.3971 | 7.6967 | Waste | 1981.0 | AMK - Abfallentsorgungsgesellschaft des Märkischen Kreises mbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 26.51 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
12482 | DEU | Germany | AVA GmbH | WRI1005580 | 10.0 | 48.4011 | 10.9356 | Waste | 1993.0 | AVA Abfallverwertung Augsburg GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 21.04 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
12483 | DEU | Germany | AVA Velsen | WRI1005581 | 15.8 | 49.2139 | 6.8345 | Waste | 1997.0 | AVA Velsen GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 1046694 | 33.24 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
13701 | DEU | Germany | Waste Incinerator #1 | WRI1006085 | 11.6 | 51.0167 | 6.9833 | Waste | 2011.0 | AVEA Entsorgungsbetriebe GmbH & Co. KG | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 24.4 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
13447 | DEU | Germany | RMVA Köln | WRI1006031 | 45.1 | 51.0003 | 6.9436 | Waste | 1997.0 | AVG Köln mbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 94.9 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
13304 | DEU | Germany | Müllheizkraftwerk Wuppertal | WRI1005958 | 30.0 | 51.2251 | 7.1422 | Waste | 1976.0 | AWG Abfallwirtschaftsgesellschaft mbH Wuppertal | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 63.12 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
12889 | DEU | Germany | GuD-Anlage Rüsselsheim | WRI1005721 | 112.1 | 49.992 | 8.4141 | Gas | 1999.0 | Adam Opel AG | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 434.43 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
12840 | DEU | Germany | GichtNatural Gaskraftwerk Dillingen | WRI1005696 | 85.0 | 49.3548 | 6.7315 | Other | 2010.0 | Aktien-Gesellschaft der Dillinger Hüttenwerke ROGESA Roheisengesellschaft Saar mbH und Zentralkokerei Saar GmbH als Bruchteilsgemeinschaft | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 281.03 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
13507 | DEU | Germany | SKW Diesel | WRI1006049 | 10.5 | 47.6835 | 10.3191 | Oil | 1978.0 | Allgäuer Ãœberlandwerk GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 1116241 | 15.67 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
13508 | DEU | Germany | SKW Natural Gasturbine | WRI1006050 | 24.0 | 47.6835 | 10.3191 | Oil | 1988.0 | Allgäuer Ãœberlandwerk GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 35.83 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
13100 | DEU | Germany | KWK AOS GmbH | WRI1005920 | 30.7 | 53.6575 | 9.502 | Gas | 2012.0 | Aluminium Oxid Stade GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 118.97 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
13057 | DEU | Germany | IKW | WRI1005836 | 101.0 | 52.1674 | 14.627 | Other | 2013.0 | Arcelor Mittal Eisenhüttenstadt GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 333.93 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
13139 | DEU | Germany | Kläranlage | WRI1005863 | 12.0 | 48.5529 | 8.4074 | Waste | 1992.0 | BASF SE | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 25.25 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
13163 | DEU | Germany | Kraftwerk Mitte | WRI1005888 | 490.0 | 49.5137 | 8.4316 | Gas | 2005.0 | BASF SE | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 1597.095 | ENTSOE | 1898.94 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||
13165 | DEU | Germany | Kraftwerk Nord | WRI1005890 | 56.0 | 48.5529 | 8.4074 | Other | 1964.0 | BASF SE | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 185.14 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
13169 | DEU | Germany | Kraftwerk Süd | WRI1005895 | 390.0 | 49.5136 | 8.4316 | Gas | 1997.0 | BASF SE | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 1511.4 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
12886 | DEU | Germany | GuD Schwarzheide | WRI1005717 | 122.0 | 51.4762 | 13.8891 | Gas | 1994.0 | BASF Schwarzheide GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 1010767 | 472.79 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
12536 | DEU | Germany | BP Werk Lingen | WRI1005617 | 66.0 | 52.5606 | 7.2952 | Gas | 1996.0 | BP Europa SE | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 255.77 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
13150 | DEU | Germany | Kraftwerk | WRI1005873 | 66.3 | 50.8305 | 6.9594 | Oil | 1962.0 | Basell Polyolefine GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 98.98 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
13321 | DEU | Germany | Natural Gas Turbine #9 | WRI1005973 | 51.9 | 50.8305 | 6.9594 | Gas | 1975.0 | Basell Polyolefine GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 201.13 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
12529 | DEU | Germany | BMHKW-BinderHolz | WRI1005607 | 15.1 | 48.7912 | 11.5068 | Biomass | 2007.0 | BinderHolz Deutschland GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
12590 | DEU | Germany | Biomass Generator #8 | WRI1006087 | 14.0 | 50.7021 | 8.0732 | Biomass | 2006.0 | Biomasse HKW Siegerland GmbH & Co.KG | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
12579 | DEU | Germany | Biomass Generator #2 | WRI1006080 | 15.7 | 48.6283 | 10.2008 | Biomass | 2004.0 | Biomasse Heizkraftwerk Herbrechtingen GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
12567 | DEU | Germany | Bio HKW Herbrechtingen | WRI1005593 | 14.0 | 48.6285 | 10.2009 | Biomass | 2004.0 | Biomasse-Heizkraftwerk-Herbrechtingen GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
12575 | DEU | Germany | Biomass Generator #15 | WRI1006104 | 28.4 | 49.5154 | 9.3252 | Biomass | 2003.0 | Biomasseheizkraftwerk Odenwald GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
12587 | DEU | Germany | Biomass Generator #5 | WRI1006083 | 12.4 | 49.9713 | 8.0606 | Biomass | 2004.0 | Boehringer Ingelheim Pharma GmbH & Co. KG | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
12584 | DEU | Germany | Biomass Generator #23 | WRI1006111 | 11.4 | 51.8554 | 6.8887 | Biomass | 2006.0 | Borchers Biomassekraftwerk GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
12619 | DEU | Germany | Borkum Riffgrund I | WRI1025854 | 312.0 | 53.9667 | 6.55 | Wind | 2015.0 | Borkum Riffgrund I Offshore Windpark A/S GmbH & Co. oHG | Bundesnetzagentur | https://www.bundesnetzagentur.de/DE/Sachgebiete/ElektrizitaetundGas/Unternehmen_Institutionen/Versorgungssicherheit/Erzeugungskapazitaeten/Kraftwerksliste/kraftwerksliste-node.html | WRI | 1052643 | 1069.17 | 1104.77 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | WIND-V1 | WIND-V1 | |||||||||||||||
12954 | DEU | Germany | HKW-Mitte | WRI1005822 | 137.3 | 52.2786 | 10.5147 | Gas | Braunschweiger Versorgungs-AG & Co. KG | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 532.09 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
12955 | DEU | Germany | HKW-Nord | WRI1005824 | 25.0 | 52.2786 | 10.5147 | Gas | 1965.0 | Braunschweiger Versorgungs-AG & Co. KG | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 96.88 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
12521 | DEU | Germany | BEG | WRI1005582 | 14.0 | 53.5478 | 8.6179 | Waste | 1977.0 | Bremerhavener Entsorgungsgesellschaft mbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 29.45 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
13315 | DEU | Germany | Natural Gas Turbine #1 | WRI1006093 | 28.0 | 49.2095 | 7.936 | Gas | 1975.0 | Buchmann GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 108.51 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
13103 | DEU | Germany | KWK-Anlage Barby | WRI1005924 | 18.0 | 51.9832 | 11.8766 | Gas | 1993.0 | Cargill Deutschland GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 69.75 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
13104 | DEU | Germany | KWK-Anlage Krefeld DT | WRI1005925 | 25.8 | 51.3392 | 6.6642 | Gas | 2004.0 | Cargill Deutschland GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 99.98 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
13105 | DEU | Germany | KWK-Anlage Krefeld VM | WRI1005926 | 14.0 | 51.3392 | 6.6642 | Gas | 2004.0 | Cargill Deutschland GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 54.25 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
12668 | DEU | Germany | Coal Plant #1 | WRI1006094 | 17.5 | 51.0489 | 12.1104 | Coal | 2005.0 | CropEnergies Bioethanol GmbH Zeitz | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 86.03 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
12809 | DEU | Germany | G-Kraftwerk | WRI1005686 | 103.0 | 51.3689 | 6.6541 | Coal | 1962.0 | Currenta GmbH & Co. OHG | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 506.38 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
13160 | DEU | Germany | Kraftwerk L 57 | WRI1005885 | 26.0 | 51.3698 | 6.6615 | Coal | 1957.0 | Currenta GmbH & Co. OHG | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 127.82 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
13164 | DEU | Germany | Kraftwerk N 230 | WRI1005889 | 110.0 | 51.3698 | 6.6615 | Coal | 1971.0 | Currenta GmbH & Co. OHG | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 540.8 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
13764 | DEU | Germany | X-Kraftwerk | WRI1006150 | 27.0 | 51.0144 | 6.9873 | Gas | 1981.0 | Currenta GmbH & Co. OHG | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 104.63 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
12678 | DEU | Germany | DK Kraftwerk | WRI1005633 | 21.0 | 51.4191 | 6.7385 | Other | 2010.0 | DK Recycling und Roheisen GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 69.43 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
12915 | DEU | Germany | HKW Dresden-Nossener Brücke | WRI1005780 | 263.0 | 51.0421 | 13.7086 | Gas | 1995.0 | DREWAG Stadtwerke Dresden GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 1222.517 | 1478.562 | 1441.149 | JRC-PPDB-OPEN | 1019.23 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||
12817 | DEU | Germany | GUD-Anlage DREWSEN | WRI1005720 | 13.0 | 52.6235 | 10.2457 | Gas | 2000.0 | DREWSEN SPEZIALPAPIERE GmbH & Co.KG | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 50.38 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
12608 | DEU | Germany | Blockheizkraftwerk 1 | WRI1005606 | 2.0 | 49.9882 | 9.1558 | Biomass | DS Smith Paper Deutschland GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | |||||||||||||||||||
12888 | DEU | Germany | GuD-Anlage | WRI1005719 | 47.0 | 49.9882 | 9.1558 | Gas | 2013.0 | DS Smith Paper Deutschland GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 215.268 | 205.907 | JRC-PPDB-OPEN | 182.14 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||
12522 | DEU | Germany | BHKW | WRI1005586 | 13.0 | 49.0475 | 8.2816 | Gas | 2013.0 | Daimler AG | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 50.38 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
12523 | DEU | Germany | BHKW H.120 | WRI1005588 | 16.9 | 51.2545 | 6.7865 | Gas | 2012.0 | Daimler AG | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 65.49 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
13003 | DEU | Germany | Heizkraftwerk Sindelfingen | WRI1005758 | 95.0 | 48.6972 | 8.9992 | Gas | Daimler AG | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 1092274 | 368.16 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
13166 | DEU | Germany | Kraftwerk Plattling | WRI1005891 | 97.9 | 48.7874 | 12.8825 | Gas | 2010.0 | Daimler AG / UPM GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 379.4 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
12577 | DEU | Germany | Biomass Generator #17 | WRI1006106 | 40.0 | 51.5152 | 12.3248 | Biomass | 2004.0 | Danpower Energie Service GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
12581 | DEU | Germany | Biomass Generator #20 | WRI1006108 | 12.6 | 51.4662 | 13.5046 | Biomass | 2004.0 | Danpower GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
13008 | DEU | Germany | Heizkraftwerk zur Papierfabrik | WRI1005762 | 18.1 | 52.618 | 7.8619 | Gas | 1995.0 | Delkeskamp Verpackungswerke GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 70.14 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
12574 | DEU | Germany | Biomass Generator #14 | WRI1006097 | 16.0 | 51.5439 | 7.4388 | Other | Deutsche Natural Gasrußwerke GmbH & Co. KG | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 52.89 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
12710 | DEU | Germany | Dow Stade | WRI1005639 | 173.0 | 53.6519 | 9.5079 | Gas | 2014.0 | Dow Deutschland Anlagengesellschaft mbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 1013779 | 670.44 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
12990 | DEU | Germany | Heizkraftwerk Bomlitz | WRI1005739 | 22.1 | 52.9 | 9.65 | Gas | 1912.0 | Dow Wolff Cellulosics GmbH | Open Power System Data | http://data.open-power-system-data.org/ | CARMA | 85.64 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
13528 | DEU | Germany | Schkopau power station | WRI1006041 | 900.0 | 51.3985 | 11.9504 | Coal | 1996.0 | E.ON | Open Power System Data | http://data.open-power-system-data.org/ | CARMA | 1032880 | 4170.715 | 4270.818 | 4317.544 | JRC-PPDB-OPEN | 4424.72 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||
12863 | DEU | Germany | Grohnde | WRI1005703 | 1360.0 | 52.0356 | 9.4135 | Nuclear | 1985.0 | E.ON Kernkraft GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 1017668 | 9755.002 | 8416.703 | 9133.248 | JRC-PPDB-OPEN | 9139.79 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||
12517 | DEU | Germany | Audorf | WRI1005578 | 87.0 | 54.2907 | 9.7228 | Oil | 1973.0 | E.ON Kraftwerke GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 1025773 | 129.88 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
12792 | DEU | Germany | Franken 1 | WRI1005681 | 823.0 | 49.4208 | 11.0077 | Gas | E.ON Kraftwerke GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 1017811 | 400.634 | 230.636 | 434.319 | JRC-PPDB-OPEN | 3189.45 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||
13041 | DEU | Germany | Huntorf | WRI1005831 | 321.0 | 53.1897 | 8.4087 | Gas | 1978.0 | E.ON Kraftwerke GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 0.97 | 8.013 | 11.83 | JRC-PPDB-OPEN | 1244.0 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||
13078 | DEU | Germany | Itzehoe | WRI1005850 | 88.0 | 53.9664 | 9.4495 | Oil | 1972.0 | E.ON Kraftwerke GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 131.38 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
13127 | DEU | Germany | Kirchmöser | WRI1005862 | 160.0 | 52.3942 | 12.4181 | Gas | 1994.0 | E.ON Kraftwerke GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 1032876 | 620.06 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
13732 | DEU | Germany | Wilhelmshaven (Oil) | WRI1006144 | 56.0 | 53.5658 | 8.1462 | Oil | 1973.0 | E.ON Kraftwerke GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 1025806 | 83.6 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
13020 | DEU | Germany | Heyden power station | WRI1005765 | 875.0 | 52.3828 | 8.996 | Coal | 1987.0 | E.On Kraftwerke GmbH | Open Power System Data | http://data.open-power-system-data.org/ | CARMA | 1025784 | 3090.61 | 3368.737 | 2222.08 | JRC-PPDB-OPEN | 4301.81 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||
13533 | DEU | Germany | Scholven power station | WRI1006042 | 690.0 | 51.6024 | 7.0099 | Coal | 1973.0 | E.On Kraftwerke GmbH | Open Power System Data | http://data.open-power-system-data.org/ | CARMA | 1032881 | 3454.024 | 3212.87 | 3227.475 | JRC-PPDB-OPEN | 3392.29 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||
13590 | DEU | Germany | Staudinger power station | WRI1006056 | 1132.0 | 50.0886 | 8.9534 | Coal | 1992.0 | E.On Kraftwerke GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 1025801 | 2531.958 | 2801.097 | 2188.751 | JRC-PPDB-OPEN | 5565.32 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||
13733 | DEU | Germany | Wilhelmshaven power station | WRI1006143 | 757.0 | 53.5658 | 8.1462 | Coal | 1976.0 | E.On Kraftwerke GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 1025806 | 4318.485 | 4173.074 | JRC-PPDB-OPEN | 3721.68 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||
12645 | DEU | Germany | Buer power station | WRI1005685 | 70.0 | 51.6028 | 7.0094 | Coal | 1985.0 | E.On Kraftwerke Gmbh | Open Power System Data | http://data.open-power-system-data.org/ | GCPT | 1032872 | 344.14 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
12722 | DEU | Germany | EBKW Knapsack | WRI1005643 | 33.4 | 50.8577 | 6.8502 | Waste | 2008.0 | EBS - Kraftwerks GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 1067266 | 70.28 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
12727 | DEU | Germany | EEW Großräschen | WRI1005650 | 23.3 | 51.5929 | 14.0241 | Waste | 2008.0 | EEW Energy from Waste Großräschen GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 49.02 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
12728 | DEU | Germany | EEW Göppingen | WRI1005649 | 11.0 | 48.6823 | 9.6713 | Waste | 2009.0 | EEW Energy from Waste Göppingen GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 23.14 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
12726 | DEU | Germany | EEW Energy from Waste Hannover GmbH | WRI1005648 | 22.5 | 52.4118 | 9.853 | Waste | 2005.0 | EEW Energy from Waste Hannover GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 1055474 | 47.34 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
13617 | DEU | Germany | TRV Buschhaus | WRI1006076 | 37.5 | 52.1714 | 10.9764 | Waste | 1998.0 | EEW Energy from Waste Helmstedt GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 78.91 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
12732 | DEU | Germany | EVE | WRI1005672 | 14.5 | 52.535 | 12.3626 | Waste | 2009.0 | EEW Energy from Waste Premnitz GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 30.51 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
13765 | DEU | Germany | ZWSF | WRI1006155 | 2.5 | 52.535 | 12.3626 | Waste | 2002.0 | EEW Energy from Waste Premnitz GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 5.26 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
12480 | DEU | Germany | AHKW Neunkirchen | WRI1005573 | 11.6 | 49.3386 | 7.17 | Waste | 1999.0 | EEW Energy from Waste Saarbrücken GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 1039908 | 24.4 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
13246 | DEU | Germany | MHKW Pirmasens | WRI1005944 | 15.0 | 49.2282 | 7.5955 | Waste | 1999.0 | EEW Energy from Waste Saarbrücken GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 1064411 | 31.56 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
13615 | DEU | Germany | TREA Breisgau | WRI1006071 | 13.6 | 47.8906 | 7.6161 | Waste | 2005.0 | EEW Energy from Waste Saarbrücken GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 1063176 | 28.61 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
12571 | DEU | Germany | Biomass Generator #11 | WRI1006090 | 16.4 | 53.6183 | 10.2244 | Waste | 1978.0 | EEW Energy from Waste Stapelfeld GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 34.51 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
13248 | DEU | Germany | MKVA Krefeld | WRI1005949 | 33.1 | 51.3804 | 6.6373 | Waste | EGK Entsorgungsgesellschaft Krefeld GmbH & Co.KG | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 69.65 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
12952 | DEU | Germany | HKW Wiesengrund | WRI1005820 | 22.1 | 50.9816 | 10.2906 | Gas | 1993.0 | ENAG/MainNatural Gas Energieanlagen GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 85.64 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
12730 | DEU | Germany | ENERTRAG Netz GmbH (UW Bertikow) | WRI1005665 | 20.0 | 53.2656 | 13.95 | Biomass | 2003.0 | ENERTRAG Aktiengesellschaft | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
12595 | DEU | Germany | Biomasseheizkraftwerk Wiesbaden | WRI1005601 | 10.5 | 50.0833 | 8.25 | Waste | 2014.0 | ESWE BioEnergie GmbH | Open Power System Data | http://data.open-power-system-data.org/ | CARMA | 22.09 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
12923 | DEU | Germany | HKW Halle Trotha | WRI1005789 | 254.0 | 51.481 | 11.9643 | Gas | EVH GmbH | Open Power System Data | http://data.open-power-system-data.org/ | Open Power System Data | 1022957 | 984.35 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 |