global-power-plants
Data license: CC Attribution 4.0 License · Data source: World Resources Institute · About: global-power-plants-datasette
rowid | country | country_long | name | gppd_idnr | capacity_mw | latitude | longitude | primary_fuel | other_fuel1 | other_fuel2 | other_fuel3 | commissioning_year | owner | source | url | geolocation_source | wepp_id | year_of_capacity_data | generation_gwh_2013 | generation_gwh_2014 | generation_gwh_2015 | generation_gwh_2016 | generation_gwh_2017 | generation_gwh_2018 | generation_gwh_2019 | generation_data_source | estimated_generation_gwh_2013 | estimated_generation_gwh_2014 | estimated_generation_gwh_2015 | estimated_generation_gwh_2016 | estimated_generation_gwh_2017 | estimated_generation_note_2013 | estimated_generation_note_2014 | estimated_generation_note_2015 | estimated_generation_note_2016 | estimated_generation_note_2017 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
15742 | IDN | Indonesia | PLTU Bilibili | WRI1000918 | 2.0 | -2.5213 | 121.357 | Coal | PLN-South&South East Sulawesi Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 10.88 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15743 | IDN | Indonesia | PLTU Bukit Asam | WRI1000919 | 30.0 | -3.7316 | 103.7975 | Coal | PT BA for own use | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026052 | 163.25 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15744 | IDN | Indonesia | PLTU Cilacap 1 & 2 | WRI1000920 | 600.0 | -7.7513 | 109.0186 | Coal | PT. Sumber Segara Primadaya | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1050225 | 3265.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15745 | IDN | Indonesia | PLTU Cirebon | WRI1000921 | 660.0 | -6.7704 | 108.6151 | Coal | PT. Cirebon Electric Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1066870 | 3591.7 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15746 | IDN | Indonesia | PLTU Embalut - Tanjung Batu | WRI1000925 | 50.0 | -0.5 | 117.15 | Coal | PT. Cahaya Fajar Kaltim | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1058260 | 272.09 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15747 | IDN | Indonesia | PLTU Gresik | WRI1000929 | 600.0 | -7.1633 | 112.6615 | Coal | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026070 | 3265.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15748 | IDN | Indonesia | PLTU Hendratna | WRI1000932 | 5.0 | -2.5213 | 121.357 | Coal | PT. Hendratna Plywood | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 27.2 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15749 | IDN | Indonesia | PLTU Jabar Selatan - Pelabuhan Ratu | WRI1000938 | 1050.0 | -7.0242 | 106.5464 | Coal | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1066867 | 5714.07 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15750 | IDN | Indonesia | PLTU Jawa Barat - Indramayu | WRI1000939 | 990.0 | -6.2747 | 107.9704 | Coal | PLN + China National Electric Engineering Co. Ltd. (CNEEC) | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1071378 | 5387.55 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15751 | IDN | Indonesia | PLTU Jawa Tengah 1 - Rembang | WRI1000940 | 630.0 | -6.636 | 111.4749 | Coal | PLN(EPC : Zeland-Priamanaya-Tronoh) | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1065762 | 3428.44 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15752 | IDN | Indonesia | PLTU Kaur | WRI1000943 | 200.0 | -2.5213 | 121.357 | Coal | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1088.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15753 | IDN | Indonesia | PLTU Keramasan | WRI1000945 | 25.0 | -2.5213 | 121.357 | Coal | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026111 | 136.04 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15754 | IDN | Indonesia | PLTU Kupang | WRI1000947 | 30.0 | -2.5213 | 121.357 | Coal | PT. Indonesia Power & electrindo Perkasa Utama | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026086 | 163.25 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15755 | IDN | Indonesia | PLTU Labuhan Angin | WRI1000948 | 230.0 | 1.7176 | 98.7265 | Coal | PLN - North Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1066585 | 1251.65 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15756 | IDN | Indonesia | PLTU Lati | WRI1000949 | 14.0 | -2.5213 | 121.357 | Coal | PLN - East Kalimantan Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1088444 | 76.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15757 | IDN | Indonesia | PLTU Listrindo | WRI1000950 | 2.5 | -2.5213 | 121.357 | Coal | PT. Listrindo (IPP) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 13.6 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15758 | IDN | Indonesia | PLTU Muara Karang | WRI1000954 | 400.0 | -6.1069 | 106.7882 | Coal | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026102 | 2176.79 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15759 | IDN | Indonesia | PLTU NAD-Nagan Raya | WRI1000956 | 220.0 | 4.1089 | 96.1972 | Coal | PLN (EPC : Sinohydro Co. Ltd) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1073026 | 1197.23 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15760 | IDN | Indonesia | PLTU Ombilin - Sijantang - Sawahlunto | WRI1000960 | 200.0 | -0.6094 | 100.7535 | Coal | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026107 | 1088.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15761 | IDN | Indonesia | PLTU Paiton I Unit 7 & 8 | WRI1000941 | 5355.0 | -7.7184 | 113.5827 | Coal | PT. Paiton Energy Corp | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026016 | 29141.78 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15762 | IDN | Indonesia | PLTU Pakerin | WRI1000965 | 34.0 | -2.5213 | 121.357 | Coal | PT. Pakerin (pulp industry) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 185.02 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15763 | IDN | Indonesia | PLTU Pangkalan Bun | WRI1000966 | 14.0 | -2.6833 | 111.6167 | Coal | PT. Energi Listrik Indonesia (subsidiary of PT. Eksploitasi Energi Indonesia) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026115 | 76.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15764 | IDN | Indonesia | PLTU Pangkalan Susu 1 & 2 | WRI1000967 | 400.0 | 4.1196 | 98.2555 | Coal | PLN (EPC : PT. Bagus Karya Guangdong Power Engineering PT. Nincec Multi Dimensi) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1079188 | 2176.79 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15765 | IDN | Indonesia | PLTU Perak | WRI1000970 | 100.0 | -7.2492 | 112.7508 | Coal | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 544.19 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15766 | IDN | Indonesia | PLTU Priok 3 & 4 | WRI1000972 | 100.0 | -6.1071 | 106.8716 | Coal | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 544.19 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15767 | IDN | Indonesia | PLTU Rancong | WRI1000974 | 30.0 | -2.5213 | 121.357 | Coal | PT. Jorindo Aceh Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 163.25 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15768 | IDN | Indonesia | PLTU Sanggau | WRI1000975 | 14.0 | -2.5213 | 121.357 | Coal | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1102412 | 76.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15769 | IDN | Indonesia | PLTU Simpang Belimbing | WRI1000978 | 227.0 | -3.4 | 104.1158 | Coal | PT. Guo Hua Energy Musi Makmur | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1075907 | 1235.32 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15770 | IDN | Indonesia | PLTU Sulawesi Selatan - Barru/FTP1 | WRI1000979 | 100.0 | -4.2931 | 119.6326 | Coal | PLN-South&South East Sulawesi Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 544.19 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15771 | IDN | Indonesia | PLTU Sumbar - Teluk sirih Unit 1 | WRI1000980 | 112.0 | -1.0772 | 100.3727 | Coal | PLN (EPC: CNTIC (China National Tecnical Import Corporation)) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1066878 | 609.5 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15772 | IDN | Indonesia | PLTU Suparma | WRI1000981 | 27.0 | -2.5213 | 121.357 | Coal | PT. Suparma (pulp industry) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 146.93 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15773 | IDN | Indonesia | PLTU Suralaya | WRI1000982 | 3400.0 | -5.892 | 106.03 | Coal | PLN -.PT Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026152 | 18502.72 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15774 | IDN | Indonesia | PLTU Tabalong | WRI1000983 | 60.0 | -2.5213 | 121.357 | Coal | PT. Makmur Sejahtera Wisesa (owned by PT. Adaro) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 326.51 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15775 | IDN | Indonesia | PLTU Tambak Lorok | WRI1000984 | 300.0 | -6.9507 | 110.4304 | Coal | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026156 | 1632.59 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15776 | IDN | Indonesia | PLTU Tanjung Alam Perkasa | WRI1000985 | 7.5 | -2.5213 | 121.357 | Coal | PT. Tanjung Alam Perkasa | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 40.81 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15777 | IDN | Indonesia | PLTU Tanjung Enim -Bukit Asam | WRI1000988 | 260.0 | -3.7316 | 103.7975 | Coal | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1076783 | 1414.91 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15778 | IDN | Indonesia | PLTU Tanjung Jati B | WRI1000990 | 1320.0 | -6.446 | 110.7423 | Coal | PT. Central Java Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1052927 | 7183.4 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15779 | IDN | Indonesia | PLTU Tanjung Jati B - expansion | WRI1000991 | 1324.0 | -6.446 | 110.7423 | Coal | PT. Central Java Power (EPC : Korea Midland Power Co) | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1052927 | 7205.17 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15780 | IDN | Indonesia | PLTU Tanjung Kasam | WRI1000992 | 110.0 | 1.0455 | 104.133 | Coal | PT. Tanjung Kasam Power Batam (PT. TJK Power) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1060288 | 598.61 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15781 | IDN | Indonesia | PLTU Tarahan # 1 2 | WRI1000994 | 200.0 | -5.518 | 105.35 | Coal | Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026163 | 1088.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15782 | IDN | Indonesia | PLTU Tarahan 3 & 4 - Sebalang | WRI1000995 | 200.0 | -5.518 | 105.35 | Coal | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1088.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15783 | IDN | Indonesia | PLTU Tello | WRI1000997 | 25.0 | -5.14 | 119.4221 | Coal | PLN-South&South East Sulawesi Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 136.04 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15784 | IDN | Indonesia | PLTU Tonasa II (Boiler Turbine Generator) | WRI1000999 | 70.0 | -4.7846 | 119.6163 | Coal | PT. Semen Gresik Tbk/PT. Semen Indonesia | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 380.93 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15785 | IDN | Indonesia | Pacitan power station | WRI1075812 | 630.0 | -8.2578 | 111.3736 | Coal | 2011.0 | PT PLN Persero | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 3428.44 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15786 | IDN | Indonesia | Pejengkolan/Mrica | WRI1000801 | 1.4 | -7.5694 | 109.8006 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026121 | 2.83 | 2.23 | 2.96 | 3.02 | 3.01 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15787 | IDN | Indonesia | Pekanbaru Tenayan power station | WRI1075813 | 220.0 | 0.5644 | 101.5234 | Coal | 2016.0 | PT PLN Persero | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 1197.23 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15788 | IDN | Indonesia | Pemaron BOO | WRI1000802 | 45.0 | -8.1189 | 115.0887 | Oil | PT. Cogindo DayaBersama - rental | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1054581 | 81.23 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15789 | IDN | Indonesia | Perawang Mill power station | WRI1075814 | 755.0 | 0.6893 | 101.6191 | Coal | 2009.0 | PT Indah Kiat Pulp & Paper | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 4108.69 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15790 | IDN | Indonesia | Pesanggaran | WRI1000803 | 75.78 | -8.7157 | 115.214 | Oil | INDONESIA POWER UNIT | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026037 | 136.79 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15791 | IDN | Indonesia | Pesanggaran BOO | WRI1000804 | 75.0 | -8.7157 | 115.214 | Oil | Anggreko International - rental | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026037 | 135.38 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15792 | IDN | Indonesia | Pesanggaran BOT | WRI1000805 | 51.0 | -8.7157 | 115.214 | Oil | Anggreko International - rental | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026037 | 92.06 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15793 | IDN | Indonesia | Plengan/Saguling | WRI1000806 | 6.87 | -6.9039 | 107.6186 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 24.7 | 24.04 | 23.47 | 26.71 | 23.28 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | ||||||||||||||
15794 | IDN | Indonesia | Purwakarta Indorama Power Station | WRI1075815 | 60.0 | -6.5539 | 107.4137 | Coal | 2006.0 | PT Indorama Synthetics Tbk | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 326.51 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15795 | IDN | Indonesia | Riam Kanan/pangeran Muhamad Nur | WRI1001004 | 30.0 | -3.5156 | 115.0074 | Hydro | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 102.63 | 81.56 | 87.65 | 97.75 | 102.52 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | ||||||||||||||
15796 | IDN | Indonesia | Saguling | WRI1001005 | 700.72 | -6.9126 | 107.3663 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | GEODB | 1026135 | 2110.52 | 1512.59 | 2024.74 | 2178.25 | 2110.52 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15797 | IDN | Indonesia | Sempor/Mrica | WRI1001009 | 1.0 | -7.4733 | 109.3331 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1050218 | 3.35 | 3.45 | 3.96 | 3.31 | 3.53 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15798 | IDN | Indonesia | Sengguruh - Brantas | WRI1001010 | 29.0 | -8.1764 | 112.551 | Hydro | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026143 | 99.96 | 68.14 | 80.5 | 104.17 | 99.98 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15799 | IDN | Indonesia | Sidorejo/Mrica | WRI1001013 | 1.4 | -7.4764 | 110.2622 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1050222 | 3.78 | 3.83 | 4.47 | 3.98 | 4.23 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15800 | IDN | Indonesia | Sigura gura (asahan II) | WRI1001014 | 286.0 | 2.5196 | 99.2793 | Hydro | PT. Indonesia Asahan aluminium | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 870.63 | 615.78 | 742.08 | 800.14 | 835.99 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | ||||||||||||||
15801 | IDN | Indonesia | Silae | WRI1001015 | 43.7 | -0.8917 | 119.8707 | Oil | PLN-Nth & Ctrl Sulawesi & Gorontalo Reg Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026112 | 78.88 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15802 | IDN | Indonesia | Singkarak | WRI1001017 | 175.0 | -0.6909 | 100.6034 | Hydro | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026146 | 551.31 | 462.3 | 484.64 | 533.52 | 559.21 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15803 | IDN | Indonesia | Sipansihaporas | WRI1001018 | 50.0 | 1.7427 | 98.7792 | Hydro | PLN - North Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1055420 | 160.65 | 122.7 | 148.67 | 163.59 | 167.37 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15804 | IDN | Indonesia | Sulawesi Mining power station | WRI1075816 | 280.0 | -2.8274 | 122.1553 | Coal | 2016.0 | Sulawesi Mining Investment | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 1523.75 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15805 | IDN | Indonesia | Suppa - Pare pare | WRI1001020 | 60.0 | -4.0135 | 119.6255 | Oil | PT. Makasar Power (Alsons Power Holdings Corp + Toyota Tsusho Corp/Tomen + Singapore Power) | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026118 | 108.3 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15806 | IDN | Indonesia | Sutami / Karangkates - Brantas | WRI1001021 | 105.0 | -8.1606 | 112.4443 | Hydro | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026154 | 371.79 | 266.78 | 301.33 | 387.04 | 371.86 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15807 | IDN | Indonesia | Talang Padang | WRI1001023 | 12.5 | -0.9492 | 100.3543 | Oil | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1093596 | 22.56 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15808 | IDN | Indonesia | Tangga (asahan II) | WRI1001024 | 317.0 | 2.5479 | 99.3028 | Hydro | PT. Indonesia Asahan aluminium | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1025945 | 965.0 | 682.53 | 822.52 | 886.87 | 926.6 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15809 | IDN | Indonesia | Tanjung Awar-Awar power station | WRI1075817 | 700.0 | -6.8105 | 111.9955 | Coal | 2012.0 | PT PLN Persero | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | 3809.38 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15810 | IDN | Indonesia | Tegineneng | WRI1001028 | 28.2 | -5.6015 | 104.7988 | Oil | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026165 | 50.9 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15811 | IDN | Indonesia | Tello | WRI1001031 | 50.092 | -5.14 | 119.4221 | Oil | PLN-South&South East Sulawesi Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026174 | 90.42 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15812 | IDN | Indonesia | Tenau Kupang | WRI1001033 | 34.73 | -10.1667 | 123.5833 | Oil | PLN - East Nusa Tenggara Regional Unit/NTT | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026086 | 62.69 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15813 | IDN | Indonesia | Timo / Mrica | WRI1001035 | 12.0 | -6.9485 | 110.4069 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026168 | 36.17 | 27.97 | 34.2 | 37.89 | 37.79 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15814 | IDN | Indonesia | Tulungagung - Brantas | WRI1001038 | 36.0 | -8.0657 | 111.9025 | Hydro | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026172 | 125.46 | 98.39 | 106.37 | 124.04 | 132.82 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15815 | IDN | Indonesia | Ubrug/saguling | WRI1001039 | 18.36 | -6.9039 | 107.6186 | Hydro | PLN - PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 67.6 | 62.66 | 61.15 | 72.72 | 62.42 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | ||||||||||||||
15816 | IDN | Indonesia | Ulubelu 1 & 2 | WRI1001040 | 110.0 | -5.3096 | 104.5733 | Geothermal | PT. PLN | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1011547 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15817 | IDN | Indonesia | Wayang Windu | WRI1001044 | 227.0 | -7.1966 | 107.6258 | Geothermal | PT. Star Energy | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1010414 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15818 | IDN | Indonesia | Wlingi - Brantas | WRI1001045 | 54.0 | -8.0776 | 112.3311 | Hydro | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1026178 | 158.18 | 138.62 | 149.71 | 161.31 | 165.44 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15819 | IDN | Indonesia | Wonorejo - Pamekasan | WRI1001046 | 6.3 | -8.1136 | 112.2869 | Hydro | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | CARMA | 1055424 | 24.89 | 17.37 | 21.45 | 26.43 | 24.77 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 |