global-power-plants
Data license: CC Attribution 4.0 License · Data source: World Resources Institute · About: global-power-plants-datasette
rowid | country | country_long | name | gppd_idnr | capacity_mw | latitude | longitude | primary_fuel | other_fuel1 | other_fuel2 | other_fuel3 | commissioning_year | owner | source | url | geolocation_source | wepp_id | year_of_capacity_data | generation_gwh_2013 | generation_gwh_2014 | generation_gwh_2015 | generation_gwh_2016 | generation_gwh_2017 | generation_gwh_2018 | generation_gwh_2019 | generation_data_source | estimated_generation_gwh_2013 | estimated_generation_gwh_2014 | estimated_generation_gwh_2015 | estimated_generation_gwh_2016 | estimated_generation_gwh_2017 | estimated_generation_note_2013 | estimated_generation_note_2014 | estimated_generation_note_2015 | estimated_generation_note_2016 | estimated_generation_note_2017 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
15659 | IDN | Indonesia | Darajat 1 | WRI1000750 | 55.0 | -7.2173 | 107.7394 | Geothermal | PLN – Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | |||||||||||||||||||
15660 | IDN | Indonesia | Darajat 2 3 | WRI1000751 | 215.0 | -7.2173 | 107.7394 | Geothermal | PT. Chevron Geothermal Darajat Ltd | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | |||||||||||||||||||
15664 | IDN | Indonesia | Gunung Malang | WRI1000758 | 25.536 | -6.7409 | 106.673 | Oil | PLN-East Kalimantan Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 46.09 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15677 | IDN | Indonesia | Koto Panjang Kampar | WRI1000775 | 114.0 | 0.2905 | 100.8814 | Hydro | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 419.08 | 310.21 | 359.57 | 397.38 | 420.15 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | ||||||||||||||
15706 | IDN | Indonesia | PLTG Krakatau Posco Energy | WRI1000835 | 200.0 | -6.0048 | 105.9961 | Gas | PT. Krakatau Posco Energy (JV : Korea Posco Energy (70%) + PT. Krakatau Daya Listrik (30%)) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 833.34 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15711 | IDN | Indonesia | PLTG Priok | WRI1000846 | 52.0 | -6.1071 | 106.8716 | Gas | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 216.66 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15720 | IDN | Indonesia | PLTGU Cilegon | WRI1000874 | 903.0 | -5.9306 | 106.1042 | Gas | PLN Cilegon Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 3762.55 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15723 | IDN | Indonesia | PLTGU Krakatau Daya Listrik (KDL) | WRI1000878 | 400.0 | -5.9924 | 105.9849 | Gas | PT. Krakatau Daya Listrik | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1666.69 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15729 | IDN | Indonesia | PLTGU Priok Block 1 2 | WRI1000885 | 1180.0 | -6.1102 | 106.8671 | Gas | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 4916.73 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15736 | IDN | Indonesia | PLTU -Jeneponto I & II | WRI1000907 | 250.0 | -5.6184 | 119.5506 | Coal | PT Bosowa Energy | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1360.49 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15737 | IDN | Indonesia | PLTU Asam-asam 1 & 2 | WRI1000910 | 260.0 | -3.9253 | 115.1043 | Coal | PLN - South Kalimantan Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1414.91 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15740 | IDN | Indonesia | PLTU Banten 2 - Labuhan | WRI1000915 | 600.0 | -6.3919 | 105.8288 | Coal | PLN / 2010 | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 3265.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15766 | IDN | Indonesia | PLTU Priok 3 & 4 | WRI1000972 | 100.0 | -6.1071 | 106.8716 | Coal | PT. Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 544.19 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15770 | IDN | Indonesia | PLTU Sulawesi Selatan - Barru/FTP1 | WRI1000979 | 100.0 | -4.2931 | 119.6326 | Coal | PLN-South&South East Sulawesi Regional Unit | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 544.19 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15782 | IDN | Indonesia | PLTU Tarahan 3 & 4 - Sebalang | WRI1000995 | 200.0 | -5.518 | 105.35 | Coal | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1088.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15784 | IDN | Indonesia | PLTU Tonasa II (Boiler Turbine Generator) | WRI1000999 | 70.0 | -4.7846 | 119.6163 | Coal | PT. Semen Gresik Tbk/PT. Semen Indonesia | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 380.93 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
15795 | IDN | Indonesia | Riam Kanan/pangeran Muhamad Nur | WRI1001004 | 30.0 | -3.5156 | 115.0074 | Hydro | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 102.63 | 81.56 | 87.65 | 97.75 | 102.52 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | ||||||||||||||
15800 | IDN | Indonesia | Sigura gura (asahan II) | WRI1001014 | 286.0 | 2.5196 | 99.2793 | Hydro | PT. Indonesia Asahan aluminium | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 870.63 | 615.78 | 742.08 | 800.14 | 835.99 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | ||||||||||||||
15817 | IDN | Indonesia | Wayang Windu | WRI1001044 | 227.0 | -7.1966 | 107.6258 | Geothermal | PT. Star Energy | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1010414 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15816 | IDN | Indonesia | Ulubelu 1 & 2 | WRI1001040 | 110.0 | -5.3096 | 104.5733 | Geothermal | PT. PLN | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1011547 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15808 | IDN | Indonesia | Tangga (asahan II) | WRI1001024 | 317.0 | 2.5479 | 99.3028 | Hydro | PT. Indonesia Asahan aluminium | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1025945 | 965.0 | 682.53 | 822.52 | 886.87 | 926.6 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15761 | IDN | Indonesia | PLTU Paiton I Unit 7 & 8 | WRI1000941 | 5355.0 | -7.7184 | 113.5827 | Coal | PT. Paiton Energy Corp | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026016 | 29141.78 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15719 | IDN | Indonesia | PLTGU Belawan – Sicanang | WRI1000871 | 817.0 | 3.7715 | 98.6687 | Gas | PLN / KITSUMBAGUT | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026045 | 3404.21 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15651 | IDN | Indonesia | Besai - Way Kanan | WRI1000744 | 92.8 | -4.9822 | 104.8051 | Hydro | PLN-South Sumatera Generation Unit | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026048 | 268.15 | 244.77 | 253.6 | 273.52 | 280.63 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15658 | IDN | Indonesia | CirataI & II | WRI1000748 | 1008.0 | -6.7004 | 107.3671 | Hydro | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026056 | 3426.09 | 2354.32 | 3099.69 | 3272.44 | 3205.36 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15747 | IDN | Indonesia | PLTU Gresik | WRI1000929 | 600.0 | -7.1633 | 112.6615 | Coal | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026070 | 3265.18 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15665 | IDN | Indonesia | Gunung Salak | WRI1000759 | 375.0 | -6.7416 | 106.648 | Geothermal | PT. Chevron Geothermal Salak Ltd | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026072 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15758 | IDN | Indonesia | PLTU Muara Karang | WRI1000954 | 400.0 | -6.1069 | 106.7882 | Coal | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026102 | 2176.79 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15806 | IDN | Indonesia | Sutami / Karangkates - Brantas | WRI1001021 | 105.0 | -8.1606 | 112.4443 | Hydro | PLN - Java Bali Generation Unit / PT. PJB | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026154 | 371.79 | 266.78 | 301.33 | 387.04 | 371.86 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15781 | IDN | Indonesia | PLTU Tarahan # 1 2 | WRI1000994 | 200.0 | -5.518 | 105.35 | Coal | Indonesia Power | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1026163 | 1088.39 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15738 | IDN | Indonesia | PLTU Banjarsari/Merapi Timur-Lahat | WRI1000913 | 220.0 | -3.7241 | 103.6894 | Coal | PT. Bukit Pembangkit Inovatif (PT BA 59.75% PT PJB 29.15% dan PT Navigate Innovative Indonesia (PT NII) 11.1%) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1057264 | 1197.23 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15780 | IDN | Indonesia | PLTU Tanjung Kasam | WRI1000992 | 110.0 | 1.0455 | 104.133 | Coal | PT. Tanjung Kasam Power Batam (PT. TJK Power) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1060288 | 598.61 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15771 | IDN | Indonesia | PLTU Sumbar - Teluk sirih Unit 1 | WRI1000980 | 112.0 | -1.0772 | 100.3727 | Coal | PLN (EPC: CNTIC (China National Tecnical Import Corporation)) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1066878 | 609.5 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15759 | IDN | Indonesia | PLTU NAD-Nagan Raya | WRI1000956 | 220.0 | 4.1089 | 96.1972 | Coal | PLN (EPC : Sinohydro Co. Ltd) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1073026 | 1197.23 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15769 | IDN | Indonesia | PLTU Simpang Belimbing | WRI1000978 | 227.0 | -3.4 | 104.1158 | Coal | PT. Guo Hua Energy Musi Makmur | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1075907 | 1235.32 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15645 | IDN | Indonesia | Asahan I | WRI1000737 | 180.0 | 2.5113 | 99.259 | Hydro | PT Bajradaya Sentranusa (China Huadian Corporation 70% + PJB 26.5%+Nusa Konstruksi Engineering 3.5%) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1076093 | 614.23 | 443.82 | 523.3 | 555.94 | 592.43 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15764 | IDN | Indonesia | PLTU Pangkalan Susu 1 & 2 | WRI1000967 | 400.0 | 4.1196 | 98.2555 | Coal | PLN (EPC : PT. Bagus Karya Guangdong Power Engineering PT. Nincec Multi Dimensi) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1079188 | 2176.79 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
15680 | IDN | Indonesia | Lahendong IV | WRI1000778 | 80.0 | 1.2542 | 124.8225 | Geothermal | PLN + Pertamina Geothermal Energy | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1087858 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
15652 | IDN | Indonesia | Bili bili | WRI1000745 | 20.1 | -5.2779 | 119.5817 | Hydro | PLN | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1092163 | 60.04 | 44.78 | 55.22 | 61.21 | 62.74 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | HYDRO-V1 | |||||||||||||
15693 | IDN | Indonesia | North Duri Cogeneration Plant | WRI1000794 | 300.0 | 1.3722 | 101.226 | Gas | PT Mandau Cipta Tenaga Nusanatara (subsidiary of Chevron) | Indonesia Power Generation | https://repit.wordpress.com/ | WRI | 1092378 | 1250.01 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 |