rowid | country | country_long | name | gppd_idnr | capacity_mw | latitude | longitude | primary_fuel | other_fuel1 | other_fuel2 | other_fuel3 | commissioning_year | owner | source | url | geolocation_source | wepp_id | year_of_capacity_data | generation_gwh_2013 | generation_gwh_2014 | generation_gwh_2015 | generation_gwh_2016 | generation_gwh_2017 | generation_gwh_2018 | generation_gwh_2019 | generation_data_source | estimated_generation_gwh_2013 | estimated_generation_gwh_2014 | estimated_generation_gwh_2015 | estimated_generation_gwh_2016 | estimated_generation_gwh_2017 | estimated_generation_note_2013 | estimated_generation_note_2014 | estimated_generation_note_2015 | estimated_generation_note_2016 | estimated_generation_note_2017 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
18185 | PAK | Pakistan | AES Lalpir Ltd. Mahmood Kot Muzaffargarh | WRI1001628 | 362.0 | 30.1725 | 70.993 | Oil | 1997.0 | IPP | Private Power and Infrastructure Board | http://ppib.gov.pk/N_commissioned_ipps.htm | GEODB | 1705.0 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
18187 | PAK | Pakistan | Atlas Power Sheikhupura | WRI1001643 | 225.0 | 31.6786 | 74.0839 | Gas | 2009.0 | IPP | Private Power and Infrastructure Board | http://ppib.gov.pk/N_commissioned_ipps.htm | GEODB | 1067348 | 1299.04 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
18188 | PAK | Pakistan | Bin Qasim | WRI1001624 | 1260.0 | 24.7844 | 67.3604 | Oil | Karachi Electric Supply Company (KESC) | Islamabad Chamber of Commerce and Industry | http://icci.com.pk/data/downloads/63/1293619048_1.pdf | GEODB | 1020510 | 5934.54 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
18190 | PAK | Pakistan | Chasnupp | WRI1001626 | 1330.0 | 32.392 | 71.4616 | Nuclear | Pakistan Atomic Energy Commission | Islamabad Chamber of Commerce and Industry | http://icci.com.pk/data/downloads/63/1293619048_1.pdf | GEODB | 1025125 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
18194 | PAK | Pakistan | Dawood Wind Power project | WRI1030469 | 50.0 | 24.6721 | 67.4959 | Wind | 2016.0 | HydroChina | NEPRA | http://www.nepra.org.pk/Licences/LPM%20Application/LPM%20of%20Hydrochina%20Dawood.PDF | WRI | 139.44 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | WIND-V1 | |||||||||||||||||
18196 | PAK | Pakistan | Engro Energy Ltd. Karachi | WRI1001644 | 217.0 | 28.027 | 69.3631 | Gas | 2010.0 | IPP | Private Power and Infrastructure Board | http://ppib.gov.pk/N_commissioned_ipps.htm | GEODB | 1252.86 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
18197 | PAK | Pakistan | Faisalabad Sitara Chemical power plant | WRI1030455 | 40.0 | 31.5233 | 73.3886 | Coal | 2016.0 | Sitara Chemical Industries Ltd | Sitara Chemical Industries | http://www.sitara.com.pk/ | WRI | 1112835 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | |||||||||||||||||
18198 | PAK | Pakistan | Fauji Fertilizer Power Plant | WRI1030456 | 118.0 | 24.8339 | 67.4179 | Coal | 2017.0 | Fauji Fertilizer Bin Qasim Limited | The Express Tribune | https://tribune.com.pk/story/1318678/fauji-fertilizers-118mw-coal-fired-power-plant-comes-online/ | WRI | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
18199 | PAK | Pakistan | Fauji KabirWala Khanela | WRI1001631 | 157.0 | 30.5237 | 71.9555 | Gas | 1999.0 | IPP | Private Power and Infrastructure Board | http://ppib.gov.pk/N_commissioned_ipps.htm | GEODB | 1016940 | 906.44 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
18200 | PAK | Pakistan | Foundation Power Company (Daharki) | WRI1001645 | 185.0 | 27.988 | 69.671 | Gas | 2011.0 | IPP | Private Power and Infrastructure Board | http://ppib.gov.pk/N_commissioned_ipps.htm | GEODB | 1058024 | 1068.1 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
18201 | PAK | Pakistan | Foundation Wind Energy Farm | WRI1030467 | 100.0 | 24.5757 | 67.4626 | Wind | 2016.0 | Foundation Wind Energy Limited | CDM | https://cdm.unfccc.int/Projects/DB/BVQI1356634961.72/view | WRI | 285.52 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | WIND-V1 | |||||||||||||||||
18203 | PAK | Pakistan | Guddu | WRI1001668 | 110.0 | 28.4272 | 69.697 | Gas | Government RPP | Islamabad Chamber of Commerce and Industry | http://icci.com.pk/data/downloads/63/1293619048_1.pdf | GEODB | 1033201 | 635.09 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
18204 | PAK | Pakistan | Gul Ahmed Energy Ltd. (GAEL) | WRI1001632 | 136.0 | 24.8496 | 67.1471 | Oil | 1997.0 | IPP | Private Power and Infrastructure Board | http://ppib.gov.pk/N_commissioned_ipps.htm | GEODB | 640.55 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
18205 | PAK | Pakistan | Habibullah Coastal Power ltd. Lahore | WRI1001633 | 140.0 | 30.2773 | 66.974 | Gas | 1999.0 | IPP | Private Power and Infrastructure Board | http://ppib.gov.pk/N_commissioned_ipps.htm | GEODB | 1012929 | 808.29 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
18206 | PAK | Pakistan | Hub Power Project | WRI1001627 | 1292.0 | 24.9057 | 66.6946 | Oil | 1977.0 | Hub Power Company | Private Power and Infrastructure Board | http://ppib.gov.pk/N_commissioned_ipps.htm | GEODB | 6085.26 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
18207 | PAK | Pakistan | Hub Power Project- Narowal | WRI1001647 | 220.0 | 24.9057 | 66.6946 | Oil | 2011.0 | IPP | Private Power and Infrastructure Board | http://ppib.gov.pk/N_commissioned_ipps.htm | GEODB | 1069520 | 1036.19 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
18208 | PAK | Pakistan | Japan Power Company Lahore | WRI1001634 | 120.0 | 31.3255 | 74.2617 | Oil | 2000.0 | IPP | Private Power and Infrastructure Board | http://ppib.gov.pk/N_commissioned_ipps.htm | GEODB | 565.19 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
18209 | PAK | Pakistan | Jhimpir | WRI1030463 | 106.0 | 25.0573 | 67.985 | Wind | Zorlu Enerji | Lahore Tribune | https://tribune.com.pk/story/483543/alternative-energy-in-jhimpir-lies-the-future-of-wind-farming/ | WRI | 179.07 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
18210 | PAK | Pakistan | Kanupp | WRI1001625 | 137.0 | 24.845 | 66.7888 | Nuclear | 1971.0 | Pakistan Atomic Energy Commission | Islamabad Chamber of Commerce and Industry | http://icci.com.pk/data/downloads/63/1293619048_1.pdf | GEODB | 1025126 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | |||||||||||||||||
18211 | PAK | Pakistan | Kohinoor Energy Limited | WRI1001635 | 131.0 | 31.2629 | 74.1871 | Oil | 1997.0 | IPP | Private Power and Infrastructure Board | http://ppib.gov.pk/N_commissioned_ipps.htm | GEODB | 1021027 | 617.0 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
18212 | PAK | Pakistan | Korangi (gas turbine) | WRI1001622 | 80.0 | 24.8483 | 67.1453 | Gas | Karachi Electric Supply Company (KESC) | Islamabad Chamber of Commerce and Industry | http://icci.com.pk/data/downloads/63/1293619048_1.pdf | GEODB | 1020513 | 461.88 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
18213 | PAK | Pakistan | Korangi (thermal) | WRI1001621 | 316.0 | 24.7857 | 67.1386 | Gas | Karachi Electric Supply Company (KESC) | Islamabad Chamber of Commerce and Industry | http://icci.com.pk/data/downloads/63/1293619048_1.pdf | GEODB | 1020513 | 1824.44 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
18215 | PAK | Pakistan | Lakhra | WRI1030454 | 150.0 | 25.7041 | 68.2861 | Coal | 1995.0 | Lakhra Power Generation Co Ltd | Lakhra Power Generation Company | http://lpgcl.gov.pk/ | WRI | 1033210 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | |||||||||||||||||
18216 | PAK | Pakistan | Liberty Power Project | WRI1001636 | 232.0 | 28.0318 | 69.6357 | Gas | 2001.0 | IPP | Private Power and Infrastructure Board | http://ppib.gov.pk/N_commissioned_ipps.htm | GEODB | 1339.46 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
18218 | PAK | Pakistan | Maple Leaf power station | WRI1030458 | 40.0 | 32.9052 | 71.6119 | Coal | 2017.0 | Maple Leaf Power | GCPT | https://endcoal.org/global-coal-plant-tracker/ | WRI | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
18219 | PAK | Pakistan | Metro Wind Farm | WRI1030466 | 50.0 | 25.1715 | 67.969 | Wind | 2016.0 | Metro Wind Power Company | Metro Power | http://metro-power.com/ | WRI | 134.57 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | WIND-V1 | |||||||||||||||||
18220 | PAK | Pakistan | Muzaffargarh Sugar Mill | WRI1030459 | 120.0 | 30.2934 | 70.9672 | Coal | 2017.0 | Fatima Group | The Express Tribune | https://tribune.com.pk/story/1391202/govt-contest-tariff-case-filed-fatima-energy/ | WRI | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
18222 | PAK | Pakistan | Nishat Chunian Limited | WRI1001650 | 200.0 | 31.1389 | 73.9125 | Oil | 2010.0 | IPP | Private Power and Infrastructure Board | http://ppib.gov.pk/N_commissioned_ipps.htm | CARMA | 1074917 | 941.99 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
18223 | PAK | Pakistan | Nishat Power Limited | WRI1001649 | 200.0 | 31.1389 | 73.9125 | Oil | 2010.0 | IPP | Private Power and Infrastructure Board | http://ppib.gov.pk/N_commissioned_ipps.htm | CARMA | 1072721 | 941.99 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
18224 | PAK | Pakistan | Pak Gen (Pvt) Limited | WRI1001629 | 365.0 | 30.1721 | 70.9929 | Oil | 1998.0 | IPP | Private Power and Infrastructure Board | http://ppib.gov.pk/N_commissioned_ipps.htm | GEODB | 1009786 | 1719.13 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
18225 | PAK | Pakistan | Pakistan Parliament | WRI1030453 | 1.0 | 33.7301 | 73.097 | Solar | 2016.0 | The Independent | http://www.independent.co.uk/news/world/asia/pakistan-s-parliament-becomes-first-in-world-to-run-entirely-on-solar-power-a6873586.html | WRI | 1.76 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | SOLAR-V1 | ||||||||||||||||||
18227 | PAK | Pakistan | Piranghaib Multan | WRI1001669 | 192.0 | 30.215 | 71.5492 | Oil | Government RPP | Islamabad Chamber of Commerce and Industry | http://icci.com.pk/data/downloads/63/1293619048_1.pdf | CARMA | 904.31 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
18228 | PAK | Pakistan | Port Qasim EPC power station | WRI1075849 | 1320.0 | 24.7845 | 67.3694 | Coal | 2018.0 | Port Qasim Electric Power Company | GCPT | https://endcoal.org/global-coal-plant-tracker/ | GCPT | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
18231 | PAK | Pakistan | Quaid-e-Azam | WRI1026464 | 400.0 | 29.3178 | 71.824 | Solar | 2015.0 | Government of Punjab | Quaid-E-Azam Solar Power (Private) Ltd. | https://www.qasolar.com/downloads/outputs-progress-report-of-plant/ | WRI | 1105221|1115217 | 773.1 | 672.04 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | SOLAR-V1 | SOLAR-V1 | |||||||||||||||
18233 | PAK | Pakistan | SITE | WRI1001623 | 100.0 | 24.913 | 66.9902 | Gas | 2009.0 | Karachi Electric Supply Company (KESC) | Islamabad Chamber of Commerce and Industry | http://icci.com.pk/data/downloads/63/1293619048_1.pdf | GEODB | 1020514 | 577.35 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
18234 | PAK | Pakistan | Saba Power Company Sheikhupura | WRI1001638 | 114.0 | 31.7322 | 73.8752 | Oil | 1999.0 | IPP | Private Power and Infrastructure Board | http://ppib.gov.pk/N_commissioned_ipps.htm | GEODB | 1012930 | 536.93 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
18235 | PAK | Pakistan | Sahiwal | WRI1030457 | 1320.0 | 30.7135 | 73.2432 | Coal | 2017.0 | Huaneng Shandong Power Co Ltd Shandong Ruyi Group | China Pakistan Economic Corridor | http://www.cpec.gov.pk/project-details/2 | WRI | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | ||||||||||||||||||
18237 | PAK | Pakistan | Southern Electric Power Company | WRI1001639 | 135.0 | 31.2911 | 74.2489 | Oil | 1999.0 | IPP | Private Power and Infrastructure Board | http://ppib.gov.pk/N_commissioned_ipps.htm | GEODB | 635.84 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
18238 | PAK | Pakistan | Tapal Energy Limited Karachi | WRI1001640 | 126.0 | 24.9997 | 66.9072 | Oil | 1977.0 | IPP | Private Power and Infrastructure Board | http://ppib.gov.pk/N_commissioned_ipps.htm | GEODB | 1031010 | 593.45 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
18240 | PAK | Pakistan | Tenaga Generasi | WRI1030468 | 50.0 | 24.6129 | 67.43 | Wind | 2017.0 | Dawood Lawrencepur Limited (DLL) | Dawood Hercules | https://dawoodhercules.com/business-interests_tgl.php | WRI | 84.47 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | |||||||||||||||||
18241 | PAK | Pakistan | Three Gorges First Wind Farm | WRI1030464 | 100.0 | 25.0804 | 67.9431 | Wind | 2014.0 | Three Gorges Corporation | Three Gorges Corporation | https://tgf.com.pk/page.php?page=8&cat=4444 | WRI | 268.3 | 279.49 | 247.07 | NO-ESTIMATION | NO-ESTIMATION | WIND-V1 | WIND-V1 | WIND-V1 | |||||||||||||||
18242 | PAK | Pakistan | Uch Power Limited | WRI1001641 | 586.0 | 28.5828 | 68.1782 | Gas | 2000.0 | IPP | Private Power and Infrastructure Board | http://ppib.gov.pk/N_commissioned_ipps.htm | GEODB | 1032275 | 3383.29 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
18243 | PAK | Pakistan | Uch-II Power Project | WRI1001654 | 404.0 | 28.5828 | 68.1782 | Gas | 2014.0 | IPP | Private Power and Infrastructure Board | http://ppib.gov.pk/N_commissioned_ipps.htm | GEODB | 1032275 | 2332.51 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||
18244 | PAK | Pakistan | Walter Power Interenational Naudero-I | WRI1001683 | 101.0 | 27.6648 | 68.3622 | Gas | Government RPP | Islamabad Chamber of Commerce and Industry | http://icci.com.pk/data/downloads/63/1293619048_1.pdf | CARMA | 583.12 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | CAPACITY-FACTOR-V1 | ||||||||||||||||||
18246 | PAK | Pakistan | Yunus Wind Farm | WRI1030465 | 50.0 | 25.0645 | 67.9946 | Wind | 2015.0 | Nordex FCEL | CDM | http://cdm.unfccc.int/Projects/DB/BVQI1356084326.32/view | WRI | 134.94 | 144.38 | NO-ESTIMATION | NO-ESTIMATION | NO-ESTIMATION | WIND-V1 | WIND-V1 |